The diagrams illustrate how a new underground platform and
n
reinforcements were added to the Toronto Go Train Station during and
following construction.
09 igi

Overall, in the redesign of the Go train station, the pedestrian walkway


e: or

under the tracks was removed and replaced with two new levels: one for
pedestrian traffic and one for shopping. In addition, the station's supports
were partially removed and rebuilt.
on p:

Before construction, the station had two levels. The upper was where trains
arrived and departed and the lower was a pedestrian walkway passing
ph rou

under the train. A large supporting pillar centred below the tracks, passed
through the level below and was buried deep in the ground beneath it.
G

During construction, the bottom concourse was dug out and lowered to a
new depth exposing the base of the buried support column. A temporary
support system was built while a section of the main support post was
removed. It was then replaced and reinforced to include a new floor level
between the upper and lower decks. The lowest level provided space for
shops and the one above it remained a walkway for pedestrians to pass
under the tracks. The upper track level was visibly unchanged.