A MATERIAL :
1 Cement Bags 1.25
2 580 mm Orissa Pan - Hindware No 1.00
3 ' P' Trap No 1.00
4 uPVC pipe 32 mm dia Rmt 3.00
5 Elbow No 2.00
6 Tee No 1.00
7 flush tank No 1.00
8 4" PVC pipe 2' long No 1.00
9 Bricks No 75.00
10 Metal Cum 0.06
11 river sand Cum 0.14
12 25 mm dia wheel valve No 1.00
Wastage
> @ - 0n 1
Wastage
> @ - 0n 2 to 3 0.05
> VAT @
> Transp.
Total @
Material Cost 5%
> Per : No.
Say
B LABOUR :
> Contract Labour :
1 Labour for fixing including Curing No 1.00
2 Fixing PVC pipe 32 mm Rmt 3.00
fixing of valuve No 1.00
Unit : Nos
Analysis
for : 1 No.
Rate Amount
280.00 350.00
1,152.90 1,152.90
201.60 201.60
38.70 116.11
9.58 19.15
10.00 10.00
600.00 600.00
96.16 96.16
5.14 385.50
696.31 39.44
1,822.00 258.00
100.00 100.00
148.94
148.94
3,276.75
3,277.00
700.00 700.00
82.00 246.00
100.00 100.00
1,046.00
1,046.00
-
-
-
-
TOTAL - Labour Cost 1,046.00
4,323.00
-
4,323.00
4,323.00