You are on page 1of 8
SULZERTEX7/L. G 6200___ Textile Technology Warp beam and harness transport 4 BS Contents Page Loading the harness onto the storage truck 1 Removing the harness from the storage truck 5 Loading the harness onto the storage truck The transport truck should be operated only by personnel who A have been specially trained in its use. Caution! Run the transport truck to the loading point. Lower the tube grippers with the warp beam until the latter is below the deflecting tube of the storage truck. Dock the storage truck onto the transport truck, mak: ing sure that the docking hooks are properly en: gaged. Lower the warp beam onto warp beam bearing 2 Continue to lower tube grippers 3 until they are just below warp beam tube 4. 6200 © 20.10.95 717.1 Page 1 SULZERTEX7/L. G 6200____ Run out the hamess insertion unit (GEV) until rapid loading cassettes 5 are above docking unit 6. Make sure that the rapid loading cassettes are aligned laterally to the docking unit, Note: To prevent vibrations, guide the GEV by hand while itis being run out and lowered Slowly lower the GEV until the rapid loading cassettes are correctly seated on the right and left hand sides. Fix the rapid loading cassettes on the docking unit by. swinging over lever 7. Continue to lower GEY slowly until warp stop motion 8 is lying on V-blocks 8 Note: If necessary, the V-blocks must be rea: ligned to the warp stop motion during the lowering operation (see T11, clearance ‘warp stop motion - last heald shaft) Continue to lower the shaft assembly until it is no longer held up by svaft supporting brackets 11 (air gap approx. 20 mm), Page 2 6200 © 20.10.95 SULZERTEX7/L. G 6200____ Open warp siop motion holder with turning handle 12, and detach the warp stop motion (KFW). With crank 13, turn shaft supporting bracket 11. out of the shaft assembly, taking care not to damage any of the healds Disconnect rapid loading cassettes 5 from the docking unit by swinging back lever 7. Then raise the hamess loading unit (GEV) into the transfer posi tion (topmost position). 717.1 6200 © 20.10.95 Page 3 SULZERTEX7/L. G 6200____ Run the hamess loading unit right into the transport position and lower tube grippers 3 ‘NIL | Caution! | The tube grippers automatically Leaemer' | start to rise as soon as the har- ness loading unit has reached the transport position. Disconnect the storage truck from the transport truck on both sides and run off. A storage truck with assembled style can immediate- ly be docked onto the transport truck Note: On the storage struck, a finished style can be removed, a new one prepared or a new warp knotted on T1714 Page 4 6200 © 20.10.95 SULZERTEX7/L. G 6200. ‘Transferring the harness from the storage truck Lower tube grippers 3 until they are below the warp, beam during during the docking operation Dock the storage truck with the prepared style onto the transport truck, making sure that the docking hooks are properly engaged. Run the harress loading unit (GEV) out until. rapid loading cassattes 5 are above docking unit 6. Make sure that the rapid loading cassettes are laterally aligned to the docking unit, Note: To prevent vibrations, guide the GEV by hand while tis being run out and lowered, Slowly lower the GEV until the rapid loading cassettes are correctly seated on the right and left hand. sides. Fix the rapid loading cassettes on the docking unit by swinging over lever 7 Continue slowly to lower the hamess loading unit until the warp stop motion (KFW) can be hung into the ‘warp stop motion holder by tuning handle 12. 6200 © 20.10.95 717.1 Page 5 SULZERTEX7/L. G 6200____ With crank 13, push shaft supporting bracket 11 through the shaft. assembly, taking care not to damage any of the healds. ue Slowly raise the harness loading unit (GEV) together with the shaft assembly and warp stop motion until the red mark is visible below cover plate 16. Disconnect the rapid loading cassettes from the docking unit by swirging back lever 7. Then raise the GEV into the transfer position (topmost position). Note: During the lifting operation, turn the warp beam by hand to slacken the warp. T1714 Page 6 6200 © 20.10.95 SULZERTEX7/L. 2| 17 G 6200____ Run the harness loading unit into the transport position, ‘Tube grippers 3 automatically start to lift the warp beam as soon as the harness loading unit has reached the transport position. Lift warp beam 17 out of warp beam bearing 2 only 50 far that itis stil below the deflecting tube of the storage tuck Disconnect the storage truck from the transport truck on both sides and run off, Outside the storage truck, bring warp beam 17 into the transport position (topmost position), at the same time tuming the warp beam by hand to tension the warp. Run the transport truck with the hamess and warp, beam up to the weaving machine, 6200 © 20.10.95 717.1 Page 7 SULZERTEX7/L.

You might also like