Construction Notes for STK6 Upgrade

This document is an as-built redline markup for a construction project at a site. It documents sign off by the site installation contractor and BHP supervisor/engineer. It also contains construction notes about removing field devices, cabling, and PLC wiring as part of a stockpile capacity upgrade project.

Uploaded by

jacob.crossley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

Construction Notes for STK6 Upgrade

This document is an as-built redline markup for a construction project at a site. It documents sign off by the site installation contractor and BHP supervisor/engineer. It also contains construction notes about removing field devices, cabling, and PLC wiring as part of a stockpile capacity upgrade project.

Uploaded by

jacob.crossley
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

MU1

_17

CONSTRUCTION NOTE 1 MU1


_17

CONTRACT DRAWINGS
AS BUILT REDLINE MARKUP

PROJECT: PDP1 STK1 Shut 2

CONTRACT NUMBER: 9100054984

ASBUILT NO CHANGE †
OR REVISED TO SUIT THE †
ASBUILT CONDITION
SITE INSTALLATION CONTRACTOR:
COMPANY NAME __________________________________
GOODLINE

James Date:
Representative sign: _______________ 2023.04.07
Date ________

Welch
NIKOLA SURLA 23:20:37 +08'00'
Print Name: _______________________________________
BHP SUPERVISOR/ENGINEER:
Super/Eng sign: ___________________Digitally signed by Gill, Brenton
Gill, Date ________
DN: cn=Gill, Brenton, o=BHP
Billiton Group Operations Pty
Print Name: _______________________________________
Ltd, ou=MULTI-ALLOWED
Brenton Date: 2023.04.08 08:36:24
+08'00'
CONSTRUCTION NOTES
MU1
1. CONSTRUCTION CONTRACTOR TO REMOVE
_17 IDENTIFIED FIELD DEVICES, FIELD CABLING
AND PLC WIRING.

MU1_17 2.03.23 STK6 CAPACITY UPGRADE - RE-ISSUED FOR CONSTRUCTION David Hehir
LIMITS DELETION 2023.03.02 17:26:41 +
08'00'

MU1_17