You are on page 1of 2

STAMPING PAGE - REDLINES & BLUELINES

(1) CONTRACTOR STAMPS

REDLINE DRAWING
NAME: Bayarkhuu Batjargal

POSITION : E&I Field Engineer


Ichinnorov B. REV: 1R2 DATE: 24/09/2023
Ichinnorov Byambajav
2021.11.07 13:32:59
+08'00'
PACKAGE NO: C-004B
cn=Bayarkhuu.B, c=MN,

1R1 2021.11.07 SIGNATURE: Bayarkhuu.B ou=MCSI,


o=Engineering team,

email=Bayarkhuu.B@mcsi.mn
2023.09.24 17:18:53 +08'00'

C-003B CHANGED: x AS DESIGNED:


PACKAGE SCOPE COMPLETED: x
SUBSYSTEM ID: 1883-201-03

REV. 1R1 REV. 1R2 REV. REV. REV. REV. REV. REV.
(2) EMPC STAMPS - (FE/CONST.)

Tsegmed Digitally signed by Tsegmed Baaguul


DN: cn=Tsegmed Baaguul, c=MN,
email=Tsegmedbaaguul@worleyparsons.com
Uuganbayar
Digitally signed by Uuganbayar
Ochir
DN: cn=Uuganbayar Ochir, ou=

Baaguul Date: 2021.11.09 11:37:55 +08'00'

Ochir
Users, email=Uuganbayar.Ochir@
Worley.com
Date: 2023.09.25 16:47:32 +08'00'

Davaa-
Digitally signed by Davaa-Otgon
DN: cn=Davaa-Otgon , c=MN,
o=Worley, ou=Worley,
Tengis Digitally signed by Tengis
Ganbold
DN: cn=Tengis Ganbold, ou=
Users, email=Tengis.Ganbold@
email=Davaa-
Otgon.Sanjjav@worley.com Ganbold worley.com

Otgon Date: 2021.11.10 10:51:12


+08'00'
004B
Date: 2023.09.26 13:56:30 +08'00'

003B MCSI
MCSP

REV. REV. REV. REV. REV. REV. REV. REV.


(3) COMMISSIONING (STAMPS)

Digitally signed by Munkhjargal


DN: cn=Munkhjargal, c=MN,
email=Munkhjargal.ts@tavanord.mn
Date: 2021.12.29 15:44:31 +08'00'

1BL 12/29/2021

NOTE 1: START ADDING STAMPS - FROM LEFT TO RIGTH


NOTE 2: IN THE CASE THAT MORE SPACES FOR STAMPS ARE NEEDED, ADD AN ADDITIONAL STAMPING PAGE TO THE PDF
OT DOC. NUMBER 1883-40-B1-1109
NOTE 3: STAMPING PAGE MUST BE FIRST PAGE OF THE DOCUMENT
NOTE 4: OT. DOC NUMBER MUST BE THE SAME NUMBER THAN THE DOCUMENT TO BE REDLINED (MANDATORY)
NOTE 5: FIELD ENGINEERING TEAM TO DEFINE REVISIONS ON EACH ON EACH BLOCK - SECTION (2) FORM: 0000-01-FRM-1112_0
Contractor MCSI 1R2
Fenced section is installed

1R2 REVISION NOTE:


1. All FCP are installed according to 1883-05-TQS-8253
2. ITP is installed according to 1883-05-TQS-8229
1R2 3. Installation location is changed according to 1883-65-K2-1110
1883-FCP-2017-JB 4. Cable route is changed due to field condition
Note 1

Note 1
1R2
1R2
1883-FCP-2019-JB
Note 4

Deleted cable route

the cables route has changed as


per 1851-05-TQS-8114. Refer
drawing is 1851-65-L5-1104_1RL1
and 1851-65-K2-1310_1RL

To 1851-XMR-2001

Contractor MCSI

1R1

1883-FCP-2018-JB 1R2
Note 1

1R2
Note 3
From 1851-AVA-2005

CONSTRUCTION ISSUE
JACOBS ENGINEERING SINGAPORE PTE LTD
(Registration number 199803266M),
a company incorporated in Singapore and
having its registered office at 50 Raffles
Place #32-01 Singapore Land Tower,

CAUTION - PROJECT DRAWING - NOT AS BUILT Jacobs Document No.


SN1809-1883/MF.DLP/1109
Singapore, 048623 (the offshore Contractor)

Web: www.jacobs.com

Disclaimer: Drawings, plans, models, designs or any other information displayed, contained in, made available or disclosed in or by this
document (or its part or attachment) is owned by Oyu Tolgoi LLC and may be a proprietary of Oyu Tolgoi LLC and hence they are for the
internal use of Oyu Tolgoi LLC only. Making a copy or reproduction thereof in any form or giving an access or possession of them to any other
party without Oyu Tolgoi LLC's written consent or permission shall be strictly prohibited. Any violation (actual or attempted) of these terms
and prohibitions shall be subject legal liabilities and Oyu Tolgoi LLC reserves its rights and entitlements to all available legal remedies.
үү ү үү ү үү ө
үү ө ө ө өө
ө ө ө өө ө ө ө ө
ө өө ө өө ө ү
ү
ө ө ө ө ө ү ө
ө ү ө өө ү ү 1BL
1R2

You might also like