PROJECT PENGEMBANGAN PIPA CY–III

(LOMANIS – REWULU)

REPAIR WELDING REPORT

Kp : 11 Material : X46 Report No : NK-CY3-IR-RWR-004

Direction : Diameter : 16 Date Repair : 14 Oktober 2021


Wall Thick. : 12,7 Page No : 1 of 1

WELDING DATA

WPS Welded No. : 002/WPS/API/NK/TIE-IN/2019 Joint No. : 59 T


Welder Code Who Produced The Defect : 28 Date : 13 Oktober 2021

Defect Data
0

315 45

270 90

225 135
Type Of Defect : HB
Size Of Defect : Length = 15 mm (HB > 6 mm dalam 2'')
180
Defect Position : HOT PASS
RT Report No. : NK-CY3-IR-RT-
Note :

Removal Of Defect

Air Gouging √ Grinding Cut-Out

Repair Data

Joint NO. : 59 T R1 RT Report No. : NK-CY3-IR-RT- R1


WPS Welded No. : 005/WPS/API/NK/TTR/2019 PT Report No. : NK-CY3-IR-PT-
Welder ID : 44 UT Report No. :
Defect Excavation Position : 36 - 0 Repair Time : 09:00 to 10:00
Remarks :
WELD JOINT AFTER REPAIRED ARE :

√ VISUALLY ACCEPTABLE PT ACCEPTABLE

RT ACCEPTABLE

Prepared/Inspected By, Checked/Witnessed By, Witnessed/Approved By,


PT. NINDYA KARYA (PERSERO) PT. NINDYA KARYA (PERSERO) PT. PERTAMINA PATRA NIAGA

Name : Name : Name :


Date : :14 Oktober 2021 Date : 14 Oktober 2021 Date : 14 Oktober 2021