QA&QC FORMAT

Doc. No.:RESL/CIVIL/QAQC/021
CHECKLIST FOR FIXING FALSE CELLING
Report No:
Date:
Location:
Structure:
Sl No Description YES NO NA Remarks
Check for the safety process is followed for fixing of false
1
celling
1) PRE CHECK OF FIXING FALSE CELLING
Check for approval o work method for fixing of flase
1
celling

Check the availabity of tool and tackles for fixing


2
of false celling.
Check the typ of False Celling to be excecuted(
3 Gypusum Board/ Metal celling /Perforated Metal
celling )
Check the Size and Shape of the GI section for
4
framing Work as per Drawing

Check the type of the Hanging system ( GI Section /


5
Wire Wih gripe )

Check the Bottom level of the Celling is marked on


6
the wall.

Check the Inspection of the Incoming material Clear


7
W.R.T approved Specification / Drawings
Checck or the Completion of Preced activites like
8 Electrical installation, HVAC installation, Plastering
of the walls Etc.
Check for Celling Paint /White wash is completed ( If
9
required).
2) CHECKS DURING THE FIXING OF FALSE CELLING
Check for Marking of Susoended ceiling level on
1
walls as per Drawings

Check for Installation of wall channels as shown in


2
Shop drawings

Check for Rigidity& Alignment of frame work of false


3
celling.
Check for Fixing of panels as shown in Shop
4
drawings.

5 Check for Screw Spacing as per Drawings.

Check Provision for fixing A/C Grills, Electrical


6
Fitting ,Sprinklers, Smoke Detector& Tap Doors Etc.

Check for Macthing of Joints , Closure of gaps


7
&Uniform Finish.
3) CHECKS AFTER THE FIXING OF FALSE CELLING

1 Check for Joints Finish of Ceilling Panels.

Check for the fixing A/C Grills, Electrical Fitting


2
,Sprinklers, Smoke Detector& Tap Doors Etc.
VENDOR RESL
Name
Sign
Date