You are on page 1of 1

Chapter Wise Test

Unit 2
Multiple choice questions. Marks 10
1)A system is the set of:
a)process b)software c)component d)none
2)The entities and group of organization in the SDLC is called:
a)stakeholders b)personnel c)team d)developers
3)The Objective of SDLC project is determined in which phase?
a)Design Phase b)Planning Phase c)Analysis Phase d)none of these
4)Analysis and evaluation of system is done in :
a)Feasibility Study b)Design Phase c)Testing Phase d)Analysis Phase
5)Which phase of SDLC is known as architectural phase:
a)Design phase b)Coding Phase c)Analysis Phase d)all of these
6)______represent the start and stop of flowchart?
a)Rectangle shape b)Oval Shape c)Circle d)Square
7)How many method are used in System Deployment?
a)1 b)2 c)3 d)4
8)SDLC has ____________Primary objectives.
a)2 b)3 c)5 d)4
9)The Condition is represented by :
a)Oval Shape b)Square c)Diamond Shape d)Rectangle
10)________ define the technical requirements.
a)Programmer b)Tester c)System Analyst d)none of these

Part 2 (any 6) Marks (30)


Q1.What is a system and its components?

Q2.Explain flowcharts symbol

Q3.What are the objectives of SDLC?

Q4.Describe the responsibilities of stakeholders.

Q5.Write a program that display the result of students either pass or fail.

Q6.Explain different types of feasibility study.

Q7.Writw down the name of different phases of SDLC?

You might also like