You are on page 1of 3

FEDERAL TECHNICAL AND VOCATIONAL EDUCATION AND TRAINING INSTITUTE

Faculty of Electrical – Electronics and ICT


Department of Electrical Atomization and Control Technology
Course Name/Title Electrical Installation
Course Code EACT 4034
Credit hours 2 Hrs Lec, + 3 Hrs Lab
Pre-requisite:- Electric Circuit Analysis II (EETe 3031)
Target group: - 4th years Electrical Automation and Control Technology Students

Aim / At the end of this course, the learner will be able to:
Course Understand main aim of Electrical Installation
objective: Know important regulation and skill of Electrical Installation
Determine optimum place of electrical service entrance
Determine number of lamps required for a given room or
service
Know how to locate lamps and fittings in a given room
Determine cross sectional area of the conductor
Determine automatic circuit breaker rating (ACB) for any
residential and
commercial loads.
Know how to install street light installation.
Determine ACB rating for any industrial load
Select cable size of industrial load
Determine total power and maximum power of the system
Calculate electrical cost estimation of a given Electrical
Installation.
Prepare contract document preparation(Bill of Quantity)
Write Electrical Report
Design residential electrical installatio

Learni
Assignments/act
Topics to be covered ng
Chapter Week ivity (Tutorial
(Lecture hours) Outco
hours)
mes
Chapter- 1 2 1.1 Introduction 5.1.1, Lecture, and
Introduction 1.2 important regulation and skill of 5.1.2, group discussion.
to Electrical 5.1.3 Self-learning
Electrical Installation
Installation 1.3 Types of Electrical Installation
1.4 Procedure of Electrical
Installation
1.5 Optimum place of electrical
service entrance
2.1 Determining number of lamps
required for a
given room or service
2.2 Locating of lamps and fittings in
a given
Lecture, and
room
group discussion.
Chapter- 2 2.3 Determining cross sectional area 5.1.4,
2 Self-learning
Illumination of the 5.1.5
Group
conductor
assignment1,
2.4 Determining automatic circuit
breaker rating
(ACB) for any residential and
commercial
loads.
Chapter-3 3.1 Procedure of Selecting Cable Lecture, and
5.1.6,
Determining Size group discussion.
5.1.7,
Cable size and 2 3.2 Checking voltage drop of a cable Self-learning
5.1.8,
ACB rating of 3.3 Selecting rating of ACB Individual
5.3
a load 3.4 Street light installation assignment1,
4.1 Selecting ACB rating of 3 phase
5.1.9, Lecture, Lab
Chapter-4 IM
5.1.10, work and Self
Industrial 2 4.2 Selecting Cable Size of 3 phase
5.1.11, learning, Group
Installation IM
5.3 discussion
4.3 Checking voltage drop of a cable
5.1 Design Electrical Installation
Applying Auto
CAD Lecture, Lab
5.2.1,
Chapter-5 5.2 Calculating electrical cost work, and group
5.2.2,
Contracting of estimation of a discussion.
6 5.2.3,
Electrical given Electrical Installation Self-learning
5.2.4,
Installation 5.3 Preparing contract document Group
5.3
preparation(Bill assignment2,
of Quantity)
5.4 Writing Electrical Report
Behavior and Criteria/
submitting
Type Weight Assessment for
date
Learning
Mid semester
20%
Exam
Final semester
30%
Exam
Individual
5%
Assignment
Quiz 10 %
Lab Practice/
30 %
Report
Group assignment 5%
Total 100%

You might also like