APRACN03 MIDTERM EXAM

Points:

77/100

1/1 Points

1.The architect shall not seek commissions/discounts from agents or firms. All market discounts shall be
credited to the _________.

Client

1/1 Points

2.The architect may or may not confers with the client on requirements, secures sufficient primary and
secondary data to generate reliable projections and analyses which are to be used as basis for the
preparation of physical plans/designs.

False

1/1 Points

3.A government agency mandated to administer and regulate the practice of architecture in the Philippines
would refer to the ________.

PRBOA

1/1 Points

4.What Philippine law governs the historic and heritage conservation planning?

RA 10066

1/1 Points

5.In site development planning, the architect is not merely concerned with the structures he creates but
with the _____________ as well.

Grounds and Surrounding Space

0/1 Points

6.How many are the ASEAN member countries?

11

1/1 Points

7.Conducting ocular inspection of possible project sites may be reimbursed by the architect to the owner.
True

1/1 Points

8.Mediation and conciliation of of disagreements refers to _____________.

RA 9285

1/1 Points

9.The CA is concerned with the management and use of land as well as the conservation, preservation and
upgrading of the of the human environment, Refers to ____________________________.

Comprehensive Development Planning Services

0/1 Points

10.Projects where the plan / design and related contract documents are re-used for the repetitive
construction of similar buildings without amending the drawing and the specifications refers to Group
_____.

1/1 Points

11.The process of directing and influencing the task-related activities would refer to _________.

Leading

1/1 Points

12.Arbitration, mediation and conciliation is governed by what law?

RA 9285

0/1 Points

13.The architect shall advise the client against proceeding with any project whose __________ may be
questionable due to financial or legal important.

Practicability

0/1 Points
14.What refers to an agreed level by which others can be measured?

Benchmark

1/1 Points

15.The architect shall not _________free professional and/or technical services from suppliers.

Solicit

1/1 Points

16.The architect shall build his professional ________ on the merits of his own service and performance.

Reputation

1/1 Points

17.Acoustic Design Services involves the detailed planning and design to ___________ for compatibility with
the architectural design concept.

Control Sound Transmission

1/1 Points

18.The architect may exhibit his professional shingle outside of his office in a _________ manner.

Modest

1/1 Points

19.The process of ensuring that actual activities conform to planned activities would refer to ____________.

Controlling

1/1 Points

20.Works of the AOR are governed by what law?

RA 8293

1/1 Points
21.The services rendered by the architect must conform to the ______________.

Standards of Professional Practice

1/1 Points

22.Lump sum or fixed fee method may be applied to __________ projects since they entail more paper work
and time consuming efforts.

Government

1/1 Points

23.The architect shall shall promptly inspect each phase of work _________.

Completed

1/1 Points

24.For government projects, the selection of the Professional Consultant shall be in accordance with the
relevant provisions of what Philippine law?

RA 9184

1/1 Points

25.The architect's primordial concerns in all of his undertakings is to safeguard ___________.

Life, Health, Property and Public Welfare

0/1 Points

26.What refers to the ASEAN Member Country where the architect has an existing license to practice
architecture?

Country of Origin

1/1 Points

27.When a client calls upon the architect to give oral or written advice and direction, to attend conferences,
to make evaluations and appraisals regarding a contemplated project, refers to _________.
Consultation

0/1 Points

28.The architect is engaged to render opinion or give advice, clarifications or explanation on techmical
matters pertaining to architectural works refers to Group ______.

10

1/1 Points

29.The owner should issue orders to the general contractor only through the ________.

Architect

1/1 Points

30.In regular practice, the architect acts as the client's _________.

Adviser

0/1 Points

31.The advantage of an ADC is for the BAC to have a wider range of options

True

False

1/1 Points

32.During the progress of work, the owner shall furnish the architect a copy of expenses being incurred on
the construction. This refers to _______.

Cost Records

0/1 Points

33.If the architect would be rendering DAEDS for a residential project, how many percent will be used for
the PF?

10%
1/1 Points

34.The architect shall keep the client informed at all times of the _____________.

Progress of Work

1/1 Points

35.If the owner observes or otherwise becomes aware of anything that may impair the successful
implementation of the project, likewise the owner shall give prompt ______________ to the architect.

Written Notice

1/1 Points

36.The architect as a good citizen shall abide by and observe the laws and regulations of the government
and comply with _______________________.

Standards of Professional Practice

1/1 Points

37.The profession of architecture calls for men and women of highest ________.

Integrity

1/1 Points

38.The architect shall promote the interest of his professional organization which is the ________.

UAP

1/1 Points

39.If the work of the architect is abandoned or suspended in whole or in part, the owner shall pay the
architect for the services rendered corresponding to the amount due at the stage of suspension.

True
1/1 Points

40.The architect shall endeavor to meet the aesthetic and functional requirements of the project
commensurate with the client's _________.

Budget

1/1 Points

41.If the architect has any other business which would affect the interest of the client, he should _______ the
client of such situation.

Inform

1/1 Points

42.When the suspension of construction exceeds a period of six (6) months, the fee for the remaining works
shall be ____________.

Doubled

0/1 Points

43.Upon signing of the Service Agreement, the owner can release to the architect, the amount
corresponding to _________ percent.

5%

0/1 Points

44.If an architect violates any provisions of RA 9266, the administrative fine would be PhP __________.

5M

1/1 Points

45.An act to regulate the practice of architecture in the Philippines would refer to ________.

RA 9266

1/1 Points
46.An exchange of ________ information between the architect and those who manufacture, supply and
handling building materials is necessary.

Technical

1/1 Points

47.A _____________ is a systematic way of doing things.

Process

1/1 Points

48.The architect shall refrain from taking part in paid advertisement ___________ any materials.

Endorsing

1/1 Points

49.When necessary, the owner shall designate a ________ authorized to act on his behalf.

Representative

1/1 Points

50.The architect is engaged in a profession which carries with it ________ responsibility towards the public.

Civic

1/1 Points

51.In the design and placements of signs, nothing should be installed inside or outside of the building that
would compromise its safety and aesthetics.

True

1/1 Points

52.If suitably trained and experienced, the architect's ability to _________________ in to a whole qualifies him o
take the lead role in an undertaking that cuts across various disciplines.

Synthesize and Organize


1/1 Points

53.The most important organizational resources is _________.

Human

0/1 Points

54.Hangars, warehouse, bakeries, armories belongs to Group _________.

1/1 Points

55.The architect shall ________ from the client at the very inception of their business relationship.

Ascertain

0/1 Points

56.Airports, Auditoriums, Hotels and Mental Institutions belongs to Group _______.

1/1 Points

57.The architect shall immediately upon his personal knowledge and inspection, _______ material,
equipment or workmanship which is not in conformity with the specifications.

Condemn

1/1 Points

58.The architect shall always endeavor to protect the client's ________.

Interest

59.What is the most important organizational resources?

Human
1/1 Points

60.The _________ shall include cost of the construction as well as all professional fees, permits, clearances
and utilities and cost of acquiring the project site, etc.
Project Development Cost

1/1 Points

61.The architect's work starts at the inspection of the project when the owner outlines his __________ to the
architect.

Requirements

1/1 Points

62.The process of engaging two or more people working together in a structures way would refer to ________.

Organizing

1/1 Points

63.The architect shall respect and help conserve system of values, historic, cultural heritage and the
existing built environment of the ___________ which he creates architecture.

Community

0/1 Points

64.Architectural Lighting Layout and Design Services involves the detailed planning and design of _________
for compatibility with the architectural design concept.

Light Transmission, Timing & Control

1/1 Points

65.Physical planning refers to the orderly arrangement within a piece of land or property on which vertical
structures and horizontal developments are to be proposed.

True

1/1 Points
66.The process of establishing goals and suitable course of action would refer to _________.

Planning

1/1 Points

67.If an architect violates any provisions of RA 9266, how many years would he be imprisoned?

0/1 Points

68.The architect's fee is based on the _____________.

Project Construction Cost

1/1 Points

69.In the design of a building, the architect works on a _____________.

Development Concept

1/1 Points

70.Upon submission by the architect of schematic design phase, how much will be paid to the AOR ?

15%

1/1 Points

71.The architect's relation to his client is dependent upon ___________.

Good Faith

1/1 Points

72.Moderate complexity of plan and designs refers to Group ______.

2
1/1 Points

73.What refers to particular processes for reporting or comparison of achievement against criteria,
standards, or a benchmark.

Assessment

1/1 Points

74.The owner shall arrange and pay for legal, auditing, insurance, counseling and other services as mabe
required for the project.

True

1/1 Points

75.For legitimate existence of a corporation, it must be registered with the ___________.

SEC

0/1 Points

76.The architect shall ensure that the conduct of his ___________ abide by appropriate and effective internal
procedures, including monitoring and review processes to enable the firm to function efficiently.

Professional Practice

1/1 Points

77.The architect shall promptly pay for architectural and other engineering and allied services required for
the project,

False

1/1 Points

78.The architect shall be compensated for his services through his ___________.

Professional Fee

1/1 Points
79.If the architect is commissioned to do physical plans for specific site, he has to go beyond the study of
human behavior and activities.

True

1/1 Points

80.Which one would refer to the purpose that an organization strives to achieve?

Goal

1/1 Points

81.The ___________ Services cover a broad line of architectural services ranging from initial problem
identification to activities that would allow the architect to initially conceptualize an array of architectural
and allied solutions.

Pre-Design

0/1 Points

82.The submits to the owner _______ sets of all construction drawings and technical specifications for
purposes of obtaining a building permit.

1/1 Points

83.The architect shall _______ his client for services rendered.

Bill

0/1 Points

84.AFAS objective is to enhance involvement in services amongst ASEAN Member Countries.

False

1/1 Points

85.The _________ have evolved to a level where specialized architectural services are needed to complete,
complement the necessary work for the totality of a project.
Time and Technology

1/1 Points

86.The primordial concern of the architect in all of his undertakings must be safeguard to life, health,
property and ______________________.

Public Welfare

1/1 Points

87.The architect must act to the best _________ and welfare of the client.

Interest

0/1 Points

88.Monumental buildings and other facilities such as Museums; Exposition and Fair Buildings belongs to
Group ___________.

0/1 Points

89.The architect must preserve his good name with ________.

Dignity

0/1 Points

90.The architect shall unselfishly give his time and effort to the advancement of the profession thru his
active and personal ___________ and involvement with the IAPOA.

Commitment

1/1 Points

91.The architect shall not affix his ___________ to any plans or professional documents prepared by other
person.

Signature and Seal


1/1 Points

92. The architect shall give the contractor every reasonable assistance to enable him to fully understand
the contents of the ________ by furnishing clear, definite and consistent information.

Contract Documents

0/1 Points

93.In applying for a building permit at the OBO, how many sets of project documents must be summited?

1/1 Points

94.The architect shall not _________ the public as to is professional competence nor claim any professional
specialization unless supported by academic qualification or record of expertise.

Deceive

1/1 Points

95.If the architect found the contractor's work in accordance to the terms of the agreement, he shall issue
the corresponding ___________.

Certificate and Payment

1/1 Points

96.The architect shall not tender professional services without first executing a professional ___________.

Service Agreement

0/1 Points

97.A per diem plus travelling and living expenses shall be chargeable to the owner whenever the architect
or his duly authorized representative is required to perform services at a locality beyond beyond _______
kilometers.

50
1/1 Points

98.The contractor depends upon the architect to ________ fairly the contractor's interest.

Safeguard

0/1 Points

99.The ability to minimize the use of resources in achieving objectives would refer to __________.

Efficiency

1/1 Points

100.The contractor is being paid through _________ of work accomplishment.

Percentage