KUMASI TECHNICAL UNIVERSITY

FACULTY OF BUILT AND NATURAL


ENVIRONMENT
DEPARTMENT OF BUILING TECHNOLOGY

INDUSTRIAL INTERNSHIP REPORT


NAME:ANDREWS NAWORAGYERE
INDEX:052041440032
COMPANY: ASIB LIMITED
DATE COMMENCED:15TH MAY, 2023.
DATE COMPLETED:15TH SEPTEMBER, 2023
Supervised by: Prof. SARFO MENSAH
Contents
Contents ......................................................................................................................................................... i
ACKNOWLEDGEMENT .................................................................................................................................. iii
INTRODUCTION ............................................................................................................................................. 1
Company’s backroud .................................................................................................................................... 2
Objectives of the Report ........................................................................................................................... 3
Public Procurement (ACT 663 AS AMENDED) ............................................................................................... 4
Invitation to Tenders................................................................................................................................. 4
Submission of Tenders .............................................................................................................................. 4
Opening of Tenders................................................................................................................................... 4
Examination of Tenders ............................................................................................................................ 5
Pre-qualification Examination ................................................................................................................... 5
Technical and Financial Responsiveness ................................................................................................... 5
Ranking Tenderers from Builders’ Work:.................................................................................................. 5
Post Qualification: ..................................................................................................................................... 6
Interim Valuation and Preparation of Claims ............................................................................................... 7
Consultancy Services..................................................................................................................................... 8
Cash Flow Forecasts ...................................................................................................................................... 9
Preparation of Interim Valuation and Payment Certificates ...................................................................... 10
Measurement of works on site for valuation and Site Meeting ................................................................. 11
WEEKLY REPORTS ON SITE ACTIVITIES........................................................................................................ 12
WEEK1 ..................................................................................................................................................... 12
WEEK2 ..................................................................................................................................................... 15
WEEK3 ..................................................................................................................................................... 18
WEEK4 ..................................................................................................................................................... 21
WEEK5 ..................................................................................................................................................... 24
WEEK6 ..................................................................................................................................................... 27
WEEK 7 .................................................................................................................................................... 30
WEEK8 ..................................................................................................................................................... 33
WEEK 9 .................................................................................................................................................... 36
WEEK 10 .................................................................................................................................................. 39

i
WEEK 11 .................................................................................................................................................. 42
WEEK12 ................................................................................................................................................... 45
WEEK13 ................................................................................................................................................... 48
WEEK 14 .................................................................................................................................................. 51
WEEK 15 .................................................................................................................................................. 54
Week16 ................................................................................................................................................... 57
Working as a storekeeper on site ............................................................................................................... 60
CONCLUCTION ............................................................................................................................................ 61
APPENDIX .................................................................................................................................................... 62

ii
ACKNOWLEDGEMENT
I would like to express my sincere gratitude to Asib Limited and most expecially to my indutrial
internship supervisor Prof. Sarfo Mensah and to my field supervisor Mr. Jacob Alornyah for
providing me with the invaluable opportunity to undertake a four-month industrial internship
within your esteemed organization. This experience has proven to be a transformative journey,
significantly enriching my understanding of the construction industry and offering deep insights
into the complexities of site operations.
Throughout my internship, I had the privilege of working alongside a team of dedicated
professionals who generously shared their knowledge, experience, and guidance. Their
unwavering support and mentorship played a pivotal role in broadening my horizons and equipping
me with the practical skills needed to thrive in this dynamic field.
This internship has been a fundamental milestone in my educational and professional development.
I have witnessed first-hand the meticulous planning, meticulous execution and unwavering
commitment that underlies the success of projects within Asib Limited. Exposure to real-world
challenges and the opportunity to actively contribute to company goals have been instrumental in
honing my problem-solving skills and fostering a strong work ethic.
I deeply appreciate the trust that Asib Limited has placed in me, allowing me to become actively
involved in the construction industry. The knowledge I have acquired during my stay here has not
only enriched my academic pursuits but has also ignited within me the passion to pursue a career
in this field with renewed determination.
I am excited about the future prospects in the construction industry and I owe this enthusiasm to
the invaluable experiences I gained during my internship at Asib Limited. I am confident that the
skills and knowledge acquired here will serve as a solid foundation for my future projects.
Once again, thank you for giving me this extraordinary opportunity. I look forward to staying
connected with Asib Limited and contributing to its continued success in the future. Please accept
my sincere thanks for the support and knowledge you have given me.

iii
INTRODUCTION
AS part of the academic requirement of Kumasi Technical University for the award of Bachelor
of Technology (B’Tech) in Building Technology, all third-year students are required to undergo a
four months’ industrial attachment.
The duty of the student is to attach him or herself to a firm for professional training in the course
of studies to gain more working experience and to relate to the working environment.
This internship report is presented to the Department of Building Technology at the Kumasi
Technical University in partial fulfillment to attain Bachelor of Technology. In clarity, I designed
a book known as the logbook and I recorded formal report for assessment.
I am pleased to present my four-month internship report, which includes the rich experience and
knowledge I gained during my time at Asib Limited's construction site at KNUST Poolside. This
internship was a transformative journey that deepened my understanding of the construction
industry and the complex processes involved in realizing architectural visions.

Over the course of four months, I had the privilege of working alongside experienced professionals
and witnessed first-hand how various construction activities are meticulously planned and
executed and how works done are valued and the prparation of interim valuation and claims. This
experience has been invaluable in providing me with practical knowledge of the construction
industry, covering a wide range of activities including plumbing, electrical installation, tiling,
demolition, alterations, plastering and many other construction processes such measuring works
done which will aid in the preparation valuation reports.

During my time at Asib Limited, I actively participated in work that allowed me to apply the
theoretical knowledge acquired during my academic studies. I had the opportunity to observe,
learn and contribute to the daily operations of a construction site, gaining practical experience in
the various important activities that make up the built environment.

Thanks for giving me this wonderful opportunity, although this was not the actual task for the
internship but i realliy appreciate the efforts Asib limited put in place to ensure that i have gaine
my hands in this internship time on site.

1
Company’s backroud
ASIB Limited is a Ghanaian-based Construction company that has a prominent presence in the
West African Region through its unique synergy that provides top quality services in the broad
infrastructure and Engineering industry.
Over the past 12 years, Asib Limited has established itself as a leading player in the construction
industry. With a proven track record of about 44 successfully completed projects and about 8
ongoing projects with about 130 permanent staff, the company has earned a reputation for
excellence in building construction, wastewater treatment, plumbing and electrical engineering.
Another unique aspect of Asib Limited is its large client base, which includes institutions such as
universities.

over the past 12 years has evolved Asib Limited from a small construction firm into a respected
industry player with a strong focus on specialized services, with a range of projects and a strong
presence, in the sector especially, within universities. Its dedication to quality, innovation, and
sustainable practices has been key to its success and continued growth in the construction industry.

2
Objectives of the Report
This report aims to:

 Explain the role and significance of the Public Procurement Act in construction projects.
 Highlight the importance of consulting services and their implementation in construction.
 Illustrate the process of interim valuation and claims handling.
 Describe the preparation of certificates in construction and their significance.
 Showcase the creation and utilization of cashflow forecasts.
 Provide a detailed weekly reports on all activities carried out and observe during my
internship period.

3
Public Procurement (ACT 663 AS AMENDED)
The Public Procurement Act is the law that governs the provision of public procurement in the
country. The government in procurement of goods and services must adhere to or be guided by the
Public Procurement Act 614 of 2003 as amended in 2016 Act 914 of the Republic of Ghana. The
Public Procurement Act requires that, the intention to procure works either through International
Competitive Tendering (ICT) or National Competitive Tendering (NCT) must be in accordance
with Section 47 of PPA Act 663 of 2003 (as amended Act 914 of 2016) to notify and achieve
maximum competition from bidders and as serve as a fair means for all eligible bidders to bid.
Public Procurement is the process by which organizations acquire goods, works and services using
public funds. It includes planning, inviting offers, awarding contracts and managing contracts, thus
serve as a reference for activities undertaking by consultancy services from the tendering stage to
the award of contracts, project management etc.
The Act to be comply by public institutions in the process of acquiring goods and services for
public projects. In construction, it plays a crucial role in ensuring transparency, fairness, and
accountability in the procurement process.
During my internship at Asib Limited although, I did not get to participate in the bidding process
for a public construction project. This involved adhering to the Public Procurement Act's
guidelines, preparing tender documents, and evaluating bids to select a contractor but per my
observations and questions i put forward to the Quantity surveyor on site, I can now say that I have
i fair idea about the practical steps they went through during the tendering process of the renovation
of KNUST swimming pool.
Below are some practical steps for in the bidding process.
Invitation to Tenders
An invitation to tender will put in the local graphics papers for contractors registered by PPA to
bid for projects. The procurement entity will prepared the tender document and to various
contractors at a price to recover the amout incure in the preparatuon of the document.

Submission of Tenders
After the invitation is put out, tenderers will be instructed to submit and deposited their tender
documents together with any relevant attachments to a Tender Box at a specified location and time.

Opening of Tenders
The opening of tender will folllow after the necessary communication has been made to all
contractors on the location and time. The representative of the entity tender committee has to serve
as the chairman during the tender opening and representatives of various contractors of supervisor,
site engineers, and quantity surveyors has to also be presentas well as the client the representative.
The tender box has to be checked to see if it is locked and not tempered with. It will then be opened
and various tender documents removed and opened in front of the tenderers. Each will be checked
to see if the following certificates were available and was up to date: Ministry of Works and

4
Housing, Labour, SSNIT, Public Procurement Authority, Company Registration and Tender
Security. The Tender Form was checked if it was signed and stamped as well as each page in the
Bill of Quantities. Each contractor’s estimate is read out and recorded by the Quantity Surveyor
who opened the tender document. Representatives will be asked if they had any questions and or
complains; and for that if they are satisfied with the tendering process.

Examination of Tenders
The submitted tender documents after the tender opening will sent to the procurement unit/entity
tender committee for evaluation to proceed. checks must be done to ensure all the submissions and
attachments by Tenderers were analyzed and confirmed. During this stage, extensions on the Bill
of Quantities attached to the tender documents submitted by tenderers will also be done. By
checking for arithmetic errors by multiplying the quantity by the rate to get the amount. Checks
must also be done to each amount for respective description against the Summary and General
Summary, Preliminary Items inclusive. The Errors identified will then be corrected with pencil
and when done with the extensions, and the initials will be written below the final figure.

Pre-qualification Examination
At these stage by checking each contractors names, addresses, nationality, read-out tender prices,
tender security and all the required qualification information (Company’s registration, Ministry of
Water Resources, Works & Housing, Tax clearance, Labour, and SNNIT certificates) are
rescreened. Even at time checks are conducted at the Registrar Generals Website to confirm the
certificate of registration receipt to know whether they are current. This will be tabulated and
remarks will written below it. The contractors who did not satisfy the required information as
specified in the Invitation to tenderers’ documents become substantially non-responsive. In all
tenderers survived the Preliminary Examination and will be declared responsive for further
evaluation”. Those pages will be photocopied and put on file as evidence.

Technical and Financial Responsiveness


further assessment of contractors who passed the preliminary examination and will subjected to
Commercial and Technical Responsiveness. That’s by assessing their key personnel with their
resume, equipment holdings, experience on works of similar nature and size, details work
programme, method statement and financial statements for the past five years. In all, “ responsive
tenderers will qualify for next process”. Remarks will then be written below it..

Ranking Tenderers from Builders’ Work:


Furthermore, promoted responsive tenders will go under detailed examination. The tender prices
will be checked for errors, “all errors that will be found will be corrected accordingly”. The
Provisional sums, Prime cost sums, Dayworks (if provisional), Contingencies and Discount
(provided by the contractors) will then be deducted from the corrected Tender Prices to allow a
proper comparison of the Tender Prices for the Builders’ Works in relation to the Consultants’
Cost-assessment. After the rank, the Lowest Responsive Tenderer before post qualification
evaluation will then qualified for the last stage of the examination.

5
Post Qualification:
Moreover, the promoted tenders will be subjected to further examination on their Annual Volume
of Constructional Work, Experience, Equipment Holding, Personnel Capability, Financial
Capability, and Litigation Information for the proposed project. The contractors will finally be
ranked according to the least evaluated tender for the award of contract.

6
Interim Valuation and Preparation of Claims
During my internship period, I had the opportunity to work on valuations and claims. I work with
the projects quantity surveyor in preparing a valuation for payment for a contractor by measuring
the works executed and claimed for payment. We measured the works. I computed the works into
various items in the bill of quantities and grouped them according to their classification (previous,
current, total) and compares to the work items in the contract. In terms of changes in scope
/additional works or supply of other/additional materials, I obtain the work variations through
measurements, compute the items into bill of quantities, sent to the consultant/client for approval,
and then request for payment. For supply of additional materials, the invoices of the items bought
are used to prepare request for other/additional materials for payment. The contractor submits his
claims and valued works with corresponding rates from the contract document signed with a cover
letter stating his intent to the consultant for payment. I further had the opportunity to prepare
computation for interest on delay on Interim Payment Certificate.
Again we did this when contractors submit their invitation for payment, we went to the site and
value the works done prepare payment certificates referring to the original bill of quantities. The
rates remain unchangeable but the quantities in the bill are being compared with the site
measurements. The summation of the valuation of work done is carried for the preparation of
certificate for payment.

7
Consultancy Services
Consultancy services, often referred to as consulting services, are professional services provided
by experts or consulting firms to individuals, organizations, or businesses to help them solve
specific problems, make informed decisions, improve productivity, or achieve their goals.
Consultants are usually individuals, with training and experience who provide their knowledge in
various fields to assist clients in making important strategic and operational decisions. I had
opportunities to represent my company on site meetings for multiple projects where we explore on
the progresses of work level of executed and possible changes made and request for service of the
Office. Report of one of our site meetings is attached to appendix

8
Cash Flow Forecasts
During my internship period, I was informed that the Office do not prepare Cash Flow Forecast
but the Finance Department does for the Institution. I was abreast that contractors normally do
cash flow analysis thereby, I was taken through on how to prepare cash flow forecast. Again, I
was told that is why they request contractors to submit their line of credit incase funds are not
flowing from the consultant, the contractors themselves can fund the project. Funds are arranged
between the consultant/client and contractor where they allocate to be issued or distributed on
monthly bases for the development of the project. It helps the contractor to claim for delays in
payment likewise the consultant to the contractor on late in delivery. Cash flow is a term frequently
used to explain how a firm earns income (cash inflows) and how the firm expends its income (cash
out flows). From the perspectives of both owner and contractor, managing cash flow is vital to a
successful project.

9
Preparation of Interim Valuation and Payment Certificates
I realized during my internship period that Interim certificates provide a mechanism for making
payments to the contractor before the works are complete. When a letter of invitation from the
Contractor requesting for a joint measurement on site to be made between his Quantity Surveyor
and that of the Consultant is brought to the office, I was tasked with my colleaque internts on site
and measure works done. We measure all works executed on the site, and quantified for the
preparation of interim valuation and ultimately payment certificate at the office. we valued the
work in line with the bill of quantities in the contract given consideration to variations and extent
of work done up to date. In preparation, the value of interim certificates is the value of the work
completed, less any amounts already paid, less retention. Half of this retention is released on
certification of practical completion and the other half upon issue of the certificate of making
good defects. Therefore, it makes clear the amount of retention and the retention statement.

10
Measurement of works on site for valuation and Site Meeting
Site meetings and valuations of works are common due to the volume and number of works
under construction. My period on site enable me to engage in some valuation activities and site
meetings. When contractors submit their claims for payment, we were tasked to visit the site to
measure and value the works done in their claims against the measured works from the site. We
then come to the office and prepare payment certificate for the work done basing on our
measurements from the site. The contractor requested the Consultancy services on various stages
of work to know the progress of work on the project under construction. I had opportunities to
represent my company on the site meetings for multiple projects where we explore on the work
executed and possible changes to be made and request to the Office. Find attached a copy of the
minutes of a 3rd site meeting in appendix.

11
WEEKLY REPORTS ON SITE ACTIVITIES
This report is organized to give an overview of my internship experience, divided into weeks
starting from 15th may, 2023 to 15th september 2023. Each section highlights the events and key
lessons learned during that week and other tasks i undertook on site thus, serving as a storekeeper
on site for about two months until the arrival the main storekeeper.
WEEK1
Weekly Internship Report at Asib Limited Construction Site at KNUST Pool Side
This report aims to provide a summary of the activities and observations made during each day of
the of the first week of my internship.
Day One: Measurement of Floor for Tiling and plastering
On the first day, I worked with an internship colleaque in measuring the floor area for tiling.
We used measuring tapes to ensure accurate measurements of the floor dimensions, since this is a
superficial item we measured it by first taking the length and width of the floor to be tiled which
aid us finding the areas to be tiled in other for us to be able to compute the amout of tiles reqired.
The measurements were recorded for further reference during the tiling process.
Plastering activities also went on this day, that’s plaster coats being applied to the side walls of the
pool which is going to serve as a base for the final finish which is going to be tiles.
Day Two: Plastering and Inspection Chamber Rodding
On the second day, I observed and assisted the workers in plastering activities.
Skilled craftsmen were applying plaster coats to the walls, ensuring a smooth and even finish.
Additionally, ispection chamber rodding work was carried out to secure and align the save
passsage of waste from the various washrooms into the septic tank. In this process opratives are
required to pour water in the in the inspection chamber while there is another oprative using the
ultimate tool for the process thus, the rodding eye in one inspection chamber through the other to
making sure that the rodding eye goes through easily without any difficult, this process also ensure
that all dirt that might be in the drainage pipes are cleared.
Some debris were also cleared on this day thus, flower pots and demolished.
Day Three: Measurement of electrical sockets, switches, fire points and data points.
The focus of the third day was measuring the electrical sockets, switches, fire points and data
points in the building. Working alongside the same internship colleaque, we measured the all
electrical sockets, switches, fire points and data points in the building and as usual this
measurement is done without any tools or equipment since they measured in terms numbers.
I also oberved some plasteringf activities on this day that’s when skilled trademen were applying
plaster coats to the walls, ensuring a smooth and even finish.

12
Day Four: Measurement for Painting and casting of concrete
On the fourth day, the site engineer assigned us to measure for the areas for painting.
We carefully measured the walls,and other surfaces that required painting using measuring tape in
other to be able to compute the area that requires painting.
Accurate measurements were crucial to estimate the paint quantities needed for the project.
We undertook this task while observing and monitoring some concrete casting on site which was
done by the trademen of the sub-contractor on site, this concrete were casted to the upper levels of
the pool pit.

Day Five: Measurement for Painting (Continued)


The fifth day involved further measurements for painting, continuing from the previous day's work.
We double-checked the measurements taken earlier to ensure accuracy.
These measurements would aid in determining the paint quantities and calculating the project's
cost.
In conclusion, the first week of my internship at the Asib Limited construction site at KNUST Pool
Side provided valuable insights into various construction activities. I actively participated in
measurements for tiling, electrical installations, and painting. Additionally, I observed and assisted
in plastering and drainage rodding work.
This internship experience enhanced my understanding of construction processes, the importance
of accurate measurements, and the coordination required among different trades. It also allowed
me to work closely with experienced professionals and gain practical knowledge in a real-world
construction environment.

13
ABOVE ARE SITE PHOTOS OF THE WEEK1

14
WEEK2
Weekly Internship Report at Asib Limited Construction Site at KNUST Pool Side
This report is intended to give an overview of the tasks and projects I worked on during the week.
It covers the skills I gained challenges I faced and allows me to reflect on my progress and set
goals for the week. This ensures that I continue to improve and grow throughout my internship.

Weekly Activities:
Day One: Measurement and Tiling Inside Swimming Pool and Plumbing Fixtures:

Assisted the team in measuring the dimensions of the swimming pool for tiling purposes.
I worked with an internship colleaque in measuring thr length and width of the side walls of the
pool in other to able to know the total area in other to know the number of tiles that we be required.
Right after the measurement, the Engineer on site took us through a process which intends to gives
a fair idea on some plumbing fixtures which have been istalled and others that are yet to be
installed, this is the process where i got toknow about some fixtures such as the K28 brass, K28
brass, the chrome cock etc.

Day Two: Assisting Steel Bender for Bending Steel for Lentils of Showers beside the Pool and
Measurement of Reinforcement:

Measured the reinforcement requirements for the lentils, ensuring accuracy and adherence to
structural design plans. Since this are linear items, we took the total length of the bars with the
bends included multiply by the number of bars in the lentil which is always three by the number
of lentils which helps in knowing the number of bars required.
I also collaborated with the steel bender to prepare the reinforcement bars which were measured
earlier for the lentils of the showers beside the pool by bending the steel bars according to the
required specifications.

Day Three: Supervising the Fixing of Alucobond alongside Concrete Casting and Plastering
Works:

I oversaw the installation process of Alucobond panels for the changing areas alongside the casting
of concrete for the lentils of the showers beside the pool which was been carried out by the
trademen of ythe sub-contractor, ensuring proper alignment and fastening techniques.
I also monitored and supervised the plastering works which was being carried out by the trademen
of the sub-contractor, ensuring a smooth and even finish.

15
Day Four: Measurement of Concrete Deck of Pool and Block Work for Fence Wall:
Conducted measurements for the concrete deck of the pool. On this day the i work with the
Quantity surveyor who was on site that day we took the dimensions of the concrete works of the
pool deck the dimensions were the length, width and depth becuase concrete work are measured
in cubic metres and the purpose of this measurement was to aid in pricing those works because the
Quantity surveyor describe thos work as additional works which means it was not included in the
actaul bill so there is need to price it and add it to the bill.
I also assisted in the block work for the fence wall, measuring which is also yet to be priced.

Day Five:Supervising Tiling and Block Laying for Locker Bases:


On this day tilers were also on site to start the tiling works. I provided supervision during the tiling
process for the side walls of the pool, ensuring precision and adherence to the design specifications.
Monitored and guided the team involved in the block laying for the locker bases, ensuring proper
alignment and construction techniques.

Skills Developed:
Construction Measurement: Gained proficiency in accurately measuring dimensions for various
construction activities, including tiling, steel bending, and block laying.
Construction Supervision: Developed skills in supervising construction processes, ensuring
compliance with design plans and quality standards.
Collaboration and Teamwork: Worked collaboratively with different teams, such as steel benders,
and construction workers, fostering effective teamwork and communication.
Attention to Detail: Developed a keen eye for detail in tasks such as tile alignment, concrete
pouring, Alucobond installation and plastering, ensuring a high-quality finish.

Conclusion
Overall, this week was filled with valuable learning experiences in various construction activities,
including measurement tiling, steel bending, concrete casting, plastering, and block laying. The
internship provided an opportunity to develop important skills and knowledge in construction
practices, teamwork, and project supervision. I look forward to applying these learnings and
further expanding my skill set in the upcoming week.

16
ABOVE ARE SOME SITE PHOTOS WEEK2
17
WEEK3
During the third week of my I nternship at Asib Ltd construction site at KNUST pool side, I had
the opportunity to gains hands-on experience in various activities related to construction and
project management. This report summarizes activities and the tasks i undertook during the week.
Day one: Supervision of Ongoing Tiling Work in the Pool Area:
Monitored the tiling work in the pool area to ensure adherence to the specified design and quality
standards.
Conducted regular inspections to check for any defects, such as uneven tiles or improper grouting.
Coordinated with the tiling team to address any issues and provide necessary guidance and support.
Day two: Grinding of Washroom Wall and Tiling:
Oversaw the grinding process of the washroom wall to remove any existing imperfections or rough
surfaces, in this case it was done in other to remove existing paints to ensure proper bonding of
tiles to walls.
Assisted in preparing the wall surface for tiling by ensuring it was clean, smooth, and properly
primed.
Supervised the tiling team during the installation of tiles on the washroom wall, ensuring accurate
alignment and consistent spacing.
Day three: Casting of Concrete for Inspection Chamber Covers:
Participated in the casting process for concrete slabs that would serve as inspection chamber
covers.
Assisted in preparing the formwork and ensuring proper reinforcement placement.
Oversaw the pouring, leveling, and finishing of the concrete slabs, following the project
specifications.
Day four: Site Preparation for Upcoming Site Meeting:
Collaborated with the site team to clear debris and ensure a clean and organized site for the
upcoming site meeting. Thus, all debris were cleared off site to reduce congestion and also ensure
fast movement of various stakeholders who will be attending the site meeting.
Assisted in arranging necessary documents, thus the progress report and samples for presentation
during the meeting.
Helped set up meeting areas, including seating arrangement.

18
Day five: General Site Meeting:
Participated in a site meeting where various stakeholders, including project managers, engineers,
and subcontractors, gathered to discuss project progress and address any concerns.
Actively, I listened and took notes during the meeting to gain a comprehensive understanding of
project management processes.
Had the opportunity to ask questions and engage in discussions regarding the construction
activities and project timeline.
Conclusion:
Throughout the week, I gained valuable hands-on experience supervising tiling work, managing
the casting of concrete slabs, and participating in site meetings. These activities enhanced my
understanding of construction processes, quality control, and project coordination. I look forward
to continuing my internship and further developing my skills in the construction industry.

19
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK 3

20
WEEK4
Introduction
This report aims to provide a summary of the activities and observations made during each day of
the of the third week of my internship.

Day One: Removal of Existing Doors and Grouting:


Assisted the team in removing the existing doors from designated areas which comes as a result
of some changes made by the client, ensuring careful handling to prevent any damage.
I also oversaw grouting process, helping and making sure that all gaps and joints between tiles are
filled with glue to ensure a smooth and even surface.

Day Two: Fixing of Composite Aluminium Panel Doors and Dressing of Openings:
Oversaw and collaborated with senior team members in the installation of composite aluminum
panel doors, following the provided specifications by the client.
Assisted in dressing the door openings by aligning and adjusting the doors to ensure proper
functioning and aesthetics.

Day Three:Demolishing of Power Room's Existing Terrazzo:


Participated in the demolition process of the power room's existing terrazzo flooring, working in
compliance with safety guidelines and using appropriate tools such as chisel, hammer and a cutting
machine.
Assisted in the removal and proper collection of debris, ensuring a clean and organized work area.

Day Four: Demolishing Continues:


Continued with the demolition works, focusing on the designated areas as per the project
requirements.
Assisted in the removal and collection of demolished materials, maintaining a safe and efficient
working environment.

Day Five: Measure for Additional Works and Demolishing:


Conducted precise measurements for additional works, such as roofs to be reconstructed and others
to be painted,louvered windows to be reconstructed, areas designated for concrete and fence wall
to be reconstructed and all this measurements were taking in the presence of the clients quantity
surveyor to ensure accurate measurement to be use for estimates for those works which was not in
the actual bill.
Assisted in the demolition of designated areas according to the project plan, ensuring proper
collection of debris and adhering to safety protocols.

21
Skills Developed:
Gained hands-on experience in demolition processes, including the safe removal and disposal of
existing materials.
Developed skills in measuring and recording accurate measurements for additional works,
contributing to project documentation and planning.
Enhanced collaboration and communication skills through working closely with team members,
following instructions, and sharing progress updates.
Gained a strong understanding of safety procedures and regulations on construction sites, ensuring
a safe working environment for all workers.

Challenges Faced:
Managing the demolition works while ensuring minimal disruption to ongoing activities required
careful coordination and consideration.
Efficiently managing the demolition tasks within the allocated time frame while optimizing the
use of available resources proved challenging

Goals for Next Week:


Gain further exposure to construction techniques and processes.
Strengthen problem-solving skills by actively participating in the resolution of construction-related
challenges.
Develop a deeper understanding of project management principles and their application in
construction projects.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside involved
a range of activities, including door removal and installation, grouting, and demolition works. The
internship provided valuable opportunities to develop practical skills in demolition techniques,
construction documentation, teamwork, and adherence to safety protocols. Looking forward to
further expanding my knowledge and skills in the coming weeks as the internship progresses.

22
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK4

23
WEEK5
Introduction
This report aims to provide a detailed account of my activities during the week, including specific
tasks and projects I was involved in, skills acquired, and challenges encountered. It also serves as
a means to reflect on my progress and outline goals for the upcoming week, ensuring continuous
improvement and growth throughout the internship.

Day One:
Dressing of Openings and Demolition Continues in Power Room:
Assisted in dressing the openings of designated areas, ensuring proper alignment and adjustment
of doors for a precise fit.
Continued participating in the demolition process of the power room this was the existing terrazzo
which started the previous week and came to an end on this day, following safety protocols and
assisting with debris removal.

Day Two:
Demolition Works in Kids Swimming Pool by Subcontractor:
Observed and learned from subcontractors carrying out demolition works in the kids swimming
pool area, gaining insights into specialized demolition techniques and equipment, thus, the use of
cutting machine in marking designated areas which makes demolition a bit easier.
Assisted in maintaining a safe working environment, coordinating with the subcontractor team and
ensuring proper disposal of debris.

Day Three:
Dressing of Inspection Chamber and Fixing of Air-Conditioning Cable:
Collaborated with the team in dressing the inspection chamber, ensuring a secure and proper fit of
components for inspection purposes.
Assisted in the installation and fixing of air-conditioning cables, from my point of view i will say
this was the difficult task of the week since it’s undertaken with many tools and equipments such
as drilling machines, chiesels hammers etc. Which comes with a lot of noise pollution and also put
operatives at risk but working under the guidance of senior team members and also providing
operatives with appropriate personal protective gears and following safety protocols this task was
undertaken without injuries.

Day Four:
Dressing of Openings and Plastering in Main Pool by Subcontractor:
Observed and learned from trademen performing dressing of openings and plastering works in the
main pool area by subcontractor, gaining exposure to specialized techniques and best practices.
Assisted in ensuring the proper alignment and installation of doors and related components during
the dressing process.

Day Five:
Dressing of Openings and Plastering by Subcontractor:
Continued working with subcontractors in dressing the openings and carrying out plastering works,
focusing on specific areas as assigned.

24
Assisted in preparing surfaces, applying plaster, and ensuring a smooth and even finish, following
instructions and adhering to quality standards.

Skills Developed:
Gained hands-on experience in the process of dressing openings, including proper alignment and
installation of doors, windows, and related components.
Developed an understanding of specialized demolition techniques through observation and
working alongside subcontractors.
Strengthened teamwork and communication skills by coordinating with subcontractor teams and
senior colleagues to ensure smooth workflow and progress.
Gotten an eye for detail in tasks such as inspection chamber dressing, air-conditioning cable
installation, and plastering, ensuring precision and quality in execution.

Challenges Faced:
Collaborating with subcontractor teams and aligning their activities with the overall construction
plan required effective communication and coordination to maintain project timelines and quality.
Observing and assisting subcontractors in specialized tasks introduced new techniques and
approaches that required quick learning and adaptability.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside involved
diverse activities, including dressing of openings, demolition works, plastering, and coordination
with subcontractor teams. The internship provided valuable opportunities to develop practical
skills in specialized construction techniques, collaboration, and attention to detail. Looking
forward to further growth and learning in the upcoming weeks as the internship progresses.

25
ABOVE ARE SOME WEEKLY PHOTOS FROM SITE WEEK5

26
WEEK6
Introduction
I am pleased to present the weekly internship report documenting my activities and progress during
my internship at ASIB LIMITED’s construction site at KNUST pool side. This report provides an
overview of the tasks and responsibilities undertaken throughout the week, highlighting key
achievements, challenges faced, skills developed, and goals for the upcoming week.

Day One:
Dressing of Openings, Installation of Air Condition Copper Pipes, and Tiling Works (Wall Tiles):
Assisted in dressing openings, ensuring precise alignment and installation of doors and windows
for a professional finish.
Participated in the installation of air conditioning copper pipes, working with the HVAC team to
ensure proper positioning and insulationand this was the time i get to know that copper pipes are
suppose to filled with gas to prevent the entry of any water which might cause the break down of
the air conditioner when is been fixed.
Collaborated with the tiling team in applying wall tiles, ensuring even spacing and accurate
positioning according to design plans.

Day Two:
Dressing of Openings, Tiling Works (Wall Tiles), and Receiving of Stock (Floor Tiles):
Continued dressing openings in different areas of the construction site, focusing on efficient and
accurate installations.
Assisted and oversaw the laying of tiles, particularly wall tiles, ensuring a seamless and
aesthetically pleasing appearance which i was commended by the site supervisor for the good work
done.
Received and organized stock of about 400 floor tiles, collaborating with the site team to verify
quantities and specifications.

Day Three:
Site Meeting, Plastering, and Painting of Ceilings:
Attended a site meeting to discuss project progress, address any challenges, and plan upcoming
activities with the project team. This meeting lasted for about 2 hours. I also participated in the
plastering process, preparing surfaces and applying plaster to achieve a smooth finish on walls for
tiling. I continued my day by assisting in the painting of ceilings, ensuring even coverage and
precise application of the selected paint thus, home charm emulsion paint.

Day Four:
Dressing of Openings and Painting of Ceilings:
Continued dressing openings in specific areas of the construction site that’s door openings and
ensuring all components fit perfectly and function correctly.
Collaborated and supervise the painting team in applying home charm emulsion paint to ceilings,
following design specifications and quality standards.

27
Day Five:
Dressing of Openings, Painting of Ceilings, and Plumbing Works:
Completed the dressing of remaining openings, ensuring all door frames, and related components
were installed accurately.
Continued painting ceilings to achieve a uniform and professional appearance throughout the
construction site.I alsoassisted the plumber in carrying out plumbing works, such as installing a
stop cork and a tee joint at their designated areas and ensuring proper connections.

Skills Developed:
Gained practical experience in dressing openings, tiling, plastering, and painting, contributing to
the final appearance of the construction site.
Strengthened teamwork and communication skills through interactions with various teams, such
as heating ventilation and air conditioning(HVAC), tiling, painting, and plumbing.
Developed an understanding of site meetings and their significance in project progress monitoring
and planning.
Cultivated an eye for detail in tasks such as tiling, painting, and plumbing, ensuring precision and
quality in execution.

Goals for Next Week:


Gain further experience in other construction activities, such as flooring installation and electrical
works.
Improve proficiency in construction documentation, including measurement recording and
progress tracking.
Enhance problem-solving skills by actively participating in the resolution of construction-related
challenges.
Further develop leadership skills by taking on additional responsibilities and coordinating with
teams.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside covered a
wide range of activities, including dressing openings, tiling, plastering, painting, and plumbing
works. The internship provided invaluable opportunities to develop practical skills, collaboration,
and attention to detail in the construction industry. I look forward to the continued learning and
growth in the coming weeks as the internship progresses.

28
ABOVE ARE SOME SITE PHOTOS WEEK 6

29
WEEK 7
Introduction
This report aims to provide a summary of the activities and observations made during each day of
the of the seventh week of my internship.

Day One:
Dressing and Painting Works (Ceilings):
Participated in dressing activities, ensuring the proper straightness of dwarf walls, and other
components for final polished appearance.
Assisted the painting team in applying paint to the ceilings, contributing to the overall aesthetics
of the construction site.

Day Two:
Dressing and Painting Works (Ceilings):
Continued dressing activities in various areas of the construction site, ensuring accuracy and
proper fitting of components for it’s final finish.
Collaborated with the painting team to continue the painting works on ceilings, achieving a
uniform and high-quality finish of the plasterboard ceilings.
Day Three:
Dressing, Painting (Ceilings), and Tiling Works (Floor Tiling):
Continued dressing activities, focusing on areas that required meticulous attention to detail.
Assisted in the painting of ceilings to ensure all surfaces were fully covered and well-coated.
Participated in the tiling works for floor tiling, ensuring precise installation and alignment of tiles
according to design plans, this process started by first setting out how the tiles needs to be layed
on designated areas and it is done using a rope and nails.
Day Four:
Tiling Works (Floor Tiling), Casting of Concrete to Column Cap, Drilling for Pool Skimming by
Subcontractor, and Excavation Works by Subcontractor:
Oversaw and collaborated with the tiling team to continue floor tiling works, paying attention to
even spacing and alignment of tiles alongside taking records of all materials that was being issued
to operatives.
Assisted in the casting of concrete to the column cap, ensuring a sturdy and stable structure.
Observed and learned from the subcontractor team as they drilled for pool skimming, gaining
insights into specialized techniques.
Watch and oversaw the subcontractor’s operatives in excavation works, ensuring proper digging
and site preparation.
Day Five:
Floor Tiling Continues:
Continued floor tiling works, focusing on completing designated areas efficiently and accurately.
Assisted in quality checks and inspections of completed tiling works, ensuring adherence to design
specifications and quality standards.

30
Skills Developed:
Gained practical experience in dressing, painting, and tiling activities, contributing to the final
appearance of the construction site.
Strengthened teamwork and communication skills through interactions with different teams,
including painting, tiling, and subcontractors.
Cultivated an eye for detail in tasks such as tiling, dressing, and painting, ensuring precision and
quality in execution.
Developed the ability to observe and learn from subcontractor teams, gaining insights into
specialized construction techniques.

Challenges Faced:
Coordinating with subcontractor teams and aligning their activities with the overall construction
plan required effective communication and coordination
Balancing various activities, such as tiling, painting, casting, and excavation, while adhering to
project deadlines required efficient time management and organization.

Goals for Next Week:


Strengthen problem-solving skills by actively participating in the resolution of construction-related
challenges.
Further develop leadership skills by taking on additional responsibilities and coordinating with
teams.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside involved
a diverse range of activities, including dressing, painting, and tiling works, as well as collaboration
with subcontractor teams. The internship provided valuable opportunities to develop practical
skills, collaboration, and attention to detail in the construction industry. I look forward to the
continued learning and growth in the upcoming weeks as the internship progresses.

31
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK7
32
WEEK8
Introduction
This report aims to provide a detailed account of my activities during the week, including specific
tasks and projects I was involved in, skills acquired, and challenges encountered. It also serves as
a means to reflect on my progress and outline goals for the upcoming week, ensuring continuous
improvement and growth throughout the internship. Although the week was one of the less busy
weeks but we still manage to get work ongoing to avoid downtime.

Day One:
Dressing and Floor Tiling:
Kicked off the week with dressing and alteration activities, i observe tradesmen dress designated
areas to acquire the require appearance ensuring precise related components for a polished
appearance.
Assisted and oversaw the tiling team in floor tiling, emphasizing even spacing and alignment of
tiles according to design plans and ensuring all gentle slope are well laid and to the right directions.

Day Two:
Floor Tiling and Painting (Ceilings):
Continued floor tiling works, maintaining alignment with design specifications and ensuring
uniformity.
Collaborated with the painting team in painting ceilings, achieving a smooth and visually
appealing finish.

Day Three:
Painting (Ceilings):
Focused on painting activities, specifically on ceilings, ensuring full coverage and an even finish
that contributes to the overall aesthetics of the construction site.

Day Four:
Tiling, Excavation for Plumbing Works:
Engaged in tiling works thats the continuaton of existing floor tiling, emphasizing precision and
accurate alignment.
Participated in excavation works to prepare for upcoming plumbing tasks, ensuring proper site
preparation.

Day Five:
Floor Tiling, Dressing, and Painting:
Continued floor tiling works, progressing toward the completion of designated areas.
Focused on dressing activities, ensuring all components were installed accurately and functioned
correctly.
Participated in painting tasks, contributing to the finishing touches of the construction site.

33
Skills Developed:
Enhanced skills in dressing, tiling, and painting, contributing to the final aesthetics of the
construction site.
Cultivated a keen eye for detail in tasks such as tiling, dressing, and painting, ensuring precision
and quality in execution.
Strengthened teamwork and communication skills through interactions with different teams,
including tiling and painting teams.
Gained practical knowledge and skills in excavation for plumbing works, contributing to site
preparation and plumbing infrastructure.
Challenges Faced:
Coordinating with Different Teams: Coordinating with various teams involved in different aspects
of construction activities required effective communication and time management.
Maintaining Quality Standards: Ensuring that tiling and painting met the high-quality standards of
the construction site presented challenges that required meticulous attention.
Goals for Next Week:
Contribute to the coordination and organization of construction activities, taking on additional
responsibilities in project planning.
Continue to enhance problem-solving skills by actively participating in the resolution of
construction-related challenges and assisting in coordinating teams.
Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside focused
on dressing, tiling, and painting activities, as well as excavation for plumbing works. The
internship continues to provide valuable opportunities to develop practical skills, collaboration,
and attention to detail in the construction industry. I look forward to the continued learning and
growth in the upcoming weeks as the internship progresses.

34
ABOVE ARE SOME WEKLY SITE PHOTOS WEEK8

35
WEEK 9
Introduction
This report covers the activities and experiences gained during the week of as I continue to
contribute to the construction efforts at the site.

Day One:
Dressing and Floor Tiling:
Started the week by continuing dressing activities, ensuring precise and accurate touches are given
to designated areas, and related components for a good appearance.
Assisted and oversaw the tiling team in floor tiling, focusing on even spacing and alignment of
tiles according to design plans.

Day Two:
Dressing and Sanding Existing Paints for New Painting Works:
Continued dressing works, paying attention to detail in every installation to maintain quality
standards.
I participated in the preparation of surfaces for new painting works by sanding existing paints,
ensuring a smooth and clean surface for the upcoming paint application.

Day Three:
Dressing, Painting (Ceilings), and Tiling Works (Floor Tiling):
Carried on with dressing activities, prioritizing areas that required careful attention to detail.
Joined the painting team in painting ceilings, ensuring full coverage and a uniform finish.
Collaborated with the tiling team in floor tiling works, making sure tiles were evenly spaced and
aligned to design specifications.

Day Four:
Plumbing Works in Main Pool:
Shifted focus to plumbing works in the main pool area, assisting in the installation of plumbing
fixtures such as floor drains and ensuring proper connections.
Gained hands-on experience in plumbing tasks, learning about the importance of water circulation
and drainage in pool systems.

Day Five:
Applying Wall Treatment Chemicals to Main Pool Walls:
I observe the rradesmen of the subcontractor engaged in the application of wall treatment
chemicals to the main pool walls, contributing to the preservation of the pool structure. I also
assisted the team in ensuring that the application was uniform and that all required areas were
covered.

36
Skills Developed:
Enhanced skills in dressing, tiling, sanding, and painting, contributing to the final aesthetics of the
construction site.
Strengthened teamwork and communication skills through interactions with various teams,
including plumbing, painting, and tiling.
Gotten a keen eye for detail in tasks such as dressing, painting, and plumbing, ensuring precision
and quality in execution.
Gained practical knowledge and skills in plumbing, particularly in the context of pool systems.

Challenges Faced:
Coordinating with various teams involved in different aspects of construction activities, such as
painting, tiling, and plumbing, required effective communication and time management.
Learning and adapting to new tasks, such as plumbing and applying wall treatment chemicals,
presented challenges that were overcome through active engagement and learning from
experienced colleagues.

Goals for Next Week:


Expand knowledge and skills in electrical installation and maintenance in a construction setting.
Improve proficiency in construction documentation, including measurement recording and
progress tracking.
Continue to develop leadership skills by actively participating in the resolution of construction-
related challenges and assisting in coordinating teams.
Further enhance problem-solving skills by taking on additional responsibilities and contributing to
project planning.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside included
a diverse range of activities, including dressing, tiling, painting, plumbing, and the application of
wall treatment chemicals. The internship continues to provide valuable opportunities to develop
practical skills, collaboration, and attention to detail in the construction industry. I look forward to
the continued learning and growth in the upcoming weeks as the internship progresses.

37
WEEKLY SITE PHOTOS WEEK 9

38
WEEK 10
Introduction
This report aims to provide a detailed account of my activities during the week, including specific
tasks and projects I was involved in, skills acquired, and challenges encountered during that week
of my internship.

Day One:
Tiling Main Pool, Grouting, and Excavation Works:
Commenced the week with tiling works in the main pool area, ensuring precise alignment and
even spacing of tiles for an aesthetically pleasing finish.
Collaborated with the team in the grouting process, filling the gaps and joints between tiles to
ensure a seamless and water-resistant surface. I also assisted in excavation works, ensuring proper
digging and site preparation as required.

Day Two:
Dressing Column Cap, Electrical Installations (Switches, Sockets), and General Cleaning for
Upcoming Site Meeting:
Continued dressing activities, focusing on the column cap to ensure a secure and polished finish.
Participated in electrical installations, including switches and sockets, contributing to the electrical
infrastructure of the construction siteas well as engaging in general cleaning to prepare the
construction site for an upcoming site meeting, ensuring a tidy and organized environment.
Day Three:
Dressing, Painting (Ceilings), and Tiling Works (Floor Tiling):
Carried on with dressing activities, emphasizing precision and proper fitting of components, I
alsoJoined the painting team in painting ceilings, to ensure full coverage and an even finish.
Collaborated with the tiling team in floor tiling works, maintaining alignment with design
specifications.
Day Four:
Tiling Works in Main Pool and Grouting in Changing Areas:
Continued tiling works in the main pool area, ensuring the completion of designated sections.
Participated in grouting activities in the changing areas, applying grout to achieve a clean and
water-resistant surface.

Day Five:
Fire Installations (Manual Call Points, Sounders, Smoke Detectors):
Shifted focus to fire installations, including the installation of manual call points, sounders, and
smoke detectors, contributing to the safety infrastructure of the construction site.
Assisted in the testing and verification of fire systems to ensure proper functionality.

Skills Developed:
Enhanced skills in tiling, grouting, electrical installations, and fire safety systems, contributing to
the overall quality and safety of the construction site.
Strengthened teamwork and communication skills through interactions with different teams,
including electrical, tiling, and fire safety installation teams.
Gained practical knowledge and skills in fire safety installations, contributing to the safety
measures of the construction site.

39
Challenges Faced:
Coordinating with various teams involved in different aspects of construction activities, such as
tiling, electrical, and fire installations, required effective communication and time management.
Learning New Systems: Adapting to new tasks, such as fire safety installations, presented
challenges that were overcome through active engagement and learning from experienced
colleagues.
Goals for Next Week:
Continue to expand knowledge and skills in electrical installation and maintenance in a
construction setting.
Further improve proficiency in construction documentation, including measurement recording and
progress tracking.
Contribute to the coordination and organization of construction activities, taking on additional
responsibilities in project planning.
Continue to enhance problem-solving skills by actively participating in the resolution of
construction-related challenges and assisting in coordinating teams.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside
encompassed a diverse range of activities, including tiling, grouting, electrical installations, and
fire safety system installations. The internship continues to provide valuable opportunities to
develop practical skills, collaboration, and attention to detail in the construction industry. I look
forward to the continued learning and growth in the upcoming weeks as the internship progresses.

40
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK10

41
WEEK 11
Introduction
This report aims to provide a summary of the activities and observations made during each day of
the of the eleventh week of my internship.
Day One:
Painting and Artwork, Floor Tiling, Concrete Cutting and Chiseling for Electrical Works in Main
Pool, and Plumbing Works (Installation of Sanitary Fittings):
Started the week with painting and artworks,painters and artisana were on site on these day to
commence their activities contributing to the aesthetics of the construction site alonside
participating in floor tiling, ensuring precise alignment and even spacing of tiles to give the
required finish.
I also observe and collaborated with the team in concrete cutting and chiseling to prepare for
electrical works in the main pool area.
Assisted in plumbing works, including the installation of sanitary fittings such as water closets,
traps and inlet pipes, contributing to the plumbing building.

Day Two:
Floor Tiling, Grouting Main Pool, Formwork Preparation, and Concrete Cutting and Chiseling for
Electrical Works in Main Pool:
Continued floor tiling works from it was left the other day, focusing on maintaining alignment
with design specifications. I also participated and oversaw some ongoing grouting activities in the
main pool area,ensuring that grouts a well place while maintaining a water-resistant and polished
finish.
Contributed to formwork preparation for upcoming concrete casting tasks for the kids pool which
expands my knowledge on how circular formworks are prepared, I continued my day while
observing concrete cutting and chiseling to accommodate electrical installations in the main pool.

Day Three:
Dressing, Tiling Works (Wall Tiling), Laying of Electrical Cables and Conduits, and Welding
Works:
Carried on with dressing activities, emphasizing precision in installations. Engaged in wall tiling
works,thus, the areas that were left out during main tiling works becuase of the floor tiles. We also
made sure that the laying electrical cables and conduits, contributing to the electrical building.
welding works was also ongiong thats on the life guard board to make use that its strong enough
to withstand loads.

Day Four:
Wall Tiling, Dressing, Welding Works, Grouting Main Pool and Washrooms, Painting and
Artworks, and Casting of Concrete for Kids Pool:
Continued wall tiling works, focusing on achieving a uniform and aesthetically pleasing
appearance even spaces which was achieved with the aid of tle spacers. Carried on with dressing
activities, ensuring the designated areas are given the required attentions to make sure that surfaces
are well prepared for receive final finishes it being tiling or painting.
Contributed to welding works, I observe welders apply welding techniques to specific construction
components, thats patching components that required those patchings

42
Assisted in grouting activities in the main pool and washrooms, achieving a polished finish and
making sure that all spaces between tiles are well filled with grouts. painting and artwork was also
ongiong, which is to enhanced the visual appeal of the construction site. I also participated in the
casting of concrete for the kids' pool, contributing to its structural integrity, while ensuring a good
surface for plastering .

Day Five:
Plumbing Works in Main Pool, Grouting Bar Area, and Decking Machine Room:
On this day we focused on plumbing works in the main pool, ensuring proper installation and
functioning of plumbing fixtures. Carried out grouting activities in the bar area to create a seamless
and polished surface. I also contributed to decking, decking refers to a process whereby plasters
are apply to a slab.

Skills Developed:
Enhanced skills in painting, artwork, floor tiling, wall tiling, grouting, and welding, contributing
to the overall aesthetics and quality of the construction site. Strengthened teamwork and
communication skills through interactions with various teams, including plumbing, electrical,
welding, and construction finishing teams.
Gained practical knowledge and skills in concrete cutting, chiseling, formwork preparation, and
casting of concrete, contributing to structural aspects of the construction site.

Challenges Faced:
Coordinating with various teams involved in different aspects of construction activities required
effective communication and time management. Adapting to new tasks, such as welding and
formwork preparation, presented challenges that were overcome through active engagement and
learning from experienced colleagues.

Goals for Next Week:


Further improve proficiency in construction documentation, including measurement recording and
progress tracking.
Contribute to the coordination and organization of construction activities, taking on additional
responsibilities in project planning.
Continue to enhance problem-solving skills by actively participating in the resolution of
construction-related challenges and assisting in coordinating teams.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside
encompassed a wide range of activities, including construction finishing, plumbing, electrical,
welding, and structural work. The internship continues to provide valuable opportunities to
develop practical skills, collaboration, and attention to detail in the construction industry. I look
forward to the continued learning and growth in the upcoming weeks as the internship progresses.

43
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK11
44
WEEK12
introduction
This report aims to provide a detailed account of my activities during the week, including specific
tasks and projects I was involved in, skills acquired during twelveth week of my fourth months
internship at Asib limited construction site KNUst pool side.

Day One:
Plastering, Plumbing Works, and Formwork for Kids Pool:
We started the week with plastering activities, contributing to the smooth and even finish of
designated areas. I assisted in plumbing works, including the installation of plumbing fixtures such
as p-traps, ensuring proper connections and functionality. I aslo onserve the tradesmen of the
subcontractor prepared a formwork for the kids' pool, ensuring the accurate setup for upcoming
concrete casting.

Day Two:
Dressing, Casting of Concrete for Kids Pool, Painting, and Artwork:
Continued dressing activities, by making sure that all areas that neede to be dress are well dressed
and are ready for full functionality. On the casting of concrete for the kids' pool also commenced,
a well mixed mixture was rightfully placed contributing to its structural integrity.
painting and artwork tasks also continued, enhancing the visual appeal of the construction site as
we get nearer to the completion date.

Day Three:
Painting and Artwork, Dressing, and Installation of Plumbing Fixtures:
Carried on with painting and artwork activities, paying attention to detail and aesthetics.
Continued dressing works, ensuring completeness and accuracy to make sure that dressed areas
are uniform with existing areas. I also ssisted in the installation of plumbing fixtures such as the
showers contributing to a sound plumbing infrastructure of the site.

Day Four:
Painting and Artwork, Fixing of Corian Tops for Wash Hand Basins, Plastering, and Electrical
Works in Main Pool (Laying of Cables):
Focused on painting and artwork tasks, thus, the continuation of ongoing painting works
maintaining a high standard of finish and a good aesthetic of the building.
Participated in fixing Corian tops for wash hand basins this is to serve as base or a platfrom on
which the basins rest, ensuring secure and aesthetically pleasing installations.
Contributed to plastering works, achieving a smooth and polished surface, I also engaged in
electrical works in the main pool area, laying cables which are going to be used to provide lighting
in the pool contributing to the electrical infrastructure.
Day Five:
Plastering, Painting, Artworks, Electrical Works in Main Pool:
Continued plastering activities, ensuring uniformity and quality in the finish.
Participated in painting and artwork tasks, enhancing the visual appeal of various areas.
Engaged in electrical works in the main pool, focusing on the laying of cables and electrical
infrastructure enhancements.
Skills Developed:

45
Enhanced skills in plastering, painting, artwork, dressing, and the installation of plumbing and
electrical fixtures, contributing to the overall aesthetics and functionality of the construction site.
Strengthened teamwork and communication skills through interactions with various teams,
including plumbing, electrical, painting, and construction finishing teams.
Gained practical knowledge and skills in formwork preparation, concrete casting, and the fixing
of Corian tops, contributing to structural and finishing aspects of the construction site.
Challenges Faced:
Coordination with Different Teams: Coordinating with various teams involved in different aspects
of construction activities required effective communication and time management.
Meeting Aesthetic Standards: Ensuring that painting, artwork, and fixture installations met the
high aesthetic standards of the construction site presented challenges that required meticulous
attention.

Goals for Next Week:


Continue to improve proficiency in construction documentation, including measurement recording
and progress tracking.
Continue to enhance problem-solving skills by actively participating in the resolution of
construction-related challenges and assisting in coordinating teams.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside
encompassed a wide range of activities, including construction finishing, plumbing, electrical,
artwork, and structural work. The internship continues to provide valuable opportunities to develop
practical skills, collaboration, and attention to detail in the construction industry. I look forward to
the continued learning and growth in the upcoming weeks as the internship progresses

46
ABOVE ARE SOME WEEKLY SITE PHOTOS WEEK12
47
WEEK13
Introduction
This weekly internship report summarizes my experiences and activities during the ninth week of
my internship at Asib Limited Construction Site at KNUST Poolside. During this week, I was
involved in a variety of tasks, including decking, plumbing works, floor tiling, painting, receiving
of stock, dressing, grouting, plastering, and electrical works. These activities provided valuable
insights into the construction industry and helped me develop practical skills.

Day One:
Painting and Artworks, Demolition:
The week began with painting and artwork tasks, focusing on enhancing the visual appeal of the
construction site. Engaged in demolition activities, carefully dismantling structures as required,
contributing to site preparation for upcoming renovations.

Day Two:
Floor Tiling and Painting (Aluminum Poles):
Continued with floor tiling works, ensuring precise alignment and even spacing of tiles.
Collaborated on painting tasks, specifically the aluminum poles, contributing to their aesthetics
and protection.

Day Three:
Painting (Aluminum Poles), Plumbing Works (Fixing of Washroom Showers), and Dressing:
Focused on painting activities, specifically the aluminum poles, ensuring a uniform and visually
pleasing finish. Assisted in plumbing works, including the installation of washroom showers,
ensuring proper connections and functionality. Engaged in dressing activities, ensuring all
components were installed accurately and functioned correctly.

Day Four:
Tiling, Excavation for Plumbing Works, and Electrical Works:
Continued tiling works, progressing toward the completion of designated areas.
Participated in excavation works to prepare for upcoming plumbing tasks, ensuring proper site
preparation. Assisted in electrical works, contributing to the electrical infrastructure of the site.

Day Five:
Floor Tiling, Dressing, and Painting and Artworks:
Continued floor tiling works, maintaining alignment with design specifications.
Focused on dressing activities, ensuring all components were installed accurately.
Participated in painting and artwork tasks, enhancing the visual appeal of various areas.

Skills Developed:
Enhanced skills in painting, artwork, floor tiling, and dressing, contributing to the overall
aesthetics of the construction site. Gained practical experience in demolition activities and the
subsequent preparations for renovation works.
Strengthened teamwork and communication skills through interactions with different teams,
including plumbing, electrical, and construction finishing teams.

48
Gained practical knowledge and skills in tiling, excavation, and electrical works, contributing to
various aspects of the construction site.

Challenges Faced:
Coordinating with Different Teams: Coordinating with various teams involved in different aspects
of construction activities required effective communication and time management.
Meeting Aesthetic Standards: Ensuring that painting, artwork, and tiling met the high aesthetic
standards of the construction site presented challenges that required meticulous attention.

Conclusion:
This week's internship experience at Asib Limited construction site at KNUST poolside
encompassed a wide range of activities, including construction finishing, demolition, plumbing,
electrical, artwork, and structural work. The internship continues to provide valuable opportunities
to develop practical skills, collaboration, and attention to detail in the construction industry. I look
forward to the continued learning and growth in the upcoming weeks as the internship progresses.

49
ABOVE ARE PHOTOS FROM SITE WEEK13
50
WEEK 14
Introduction:
This weekly internship report provides a comprehensive overview of the activities conducted at
the Asib Limited construction site at KNUST Poolside during Week 14 of my internship. The
week was characterized by a diverse range of tasks, including decking, plumbing works, floor
tiling, painting, receiving of stock, plastering, dressing, and electrical works. These activities
collectively contribute to the construction and finishing of the poolside area.

Day One:
Decking, Plumbing Works (Inside Main Pool to Sand Filters), and Dressing
I commenced the week by observing masons a labourer carrying out decking activities thats
applying plasters to the botton of a slab we ensured precise measurements and even finish of deck.
I have also gotten a fair idea about sand filters and how they work in pools since i observe the
tecnician engaged in plumbing tasks within the main pool area, specifically related to sand filters,
by
Connected filtration components, including pipes and valves, to ensure proper water circulation.
I also supervise some tradesmen in dressing activities.

Day Two:
Floor Tiling, Painting, and Receiving of Stock (Floor Tiles and Cement)
We advanced in floor tiling works, emphasizing precision in tile placement and alignment while
ensuring even spacing and adherence to design specifications. I also observe painters engaged in
painting tasks to enhance the aesthetics of various areas within the construction site which has
increase my knowledge on painting and finish as a whole.
Receiving of Stock (Floor Tiles and Cement):
Received and inspected stock materials, including floor tiles and cement, to verify their quality
and quantity I accurately documented received materials for inventory and project tracking.

Day Three:
Painting, Floor Tiling (Poolside), Plumbing Works (Wash-hand Basin and P-Traps), and Dressing
Continued painting activities, with a focus on areas near the poolside.
Maintained a high standard of finish to enhance the visual appeal of the pool area.
Extended floor tiling to the poolside area, ensuring alignment with design plans and safety
standards.
I aslo participated in plumbing works related to wash-hand basins, including the installation of
fixtures and P-traps. Ensured proper connections and functionality.
Continued dressing tasks, emphasizing accurate installation and associated components.

51
Day Four:
Tiling (Poolside), Grouting, Plastering, and Dressing
We commenced the day by Continuing tiling works in the poolside area, ensuring precise
alignment and adherence to design specifications. Tradesmen also engaged in grouting activities
to fill gaps between tiles and achieve a uniform and secure finish. Participated in plastering tasks,
contributing to the smooth and polished surface of designated areas.
Continued dressing activities making sure that designated areas are well patched and in good
conding to serve its function

Day Five:
Floor Tiling (Poolside), Dressing, and Electrical Works (Earthing)
Progressed with floor tiling in the poolside area, ensuring alignment and adherence to safety
standards while continuing dressing tasks, with a focus on accurate installation and functionality
of components.
Electricians also engaged in electrical works related to earthing to ensure the safety and
functionality of electrical systems.

Conclusion:
Week 14 of the internship at Asib Limited Construction Site at KNUST Poolside involved a
diverse range of construction and finishing activities. These tasks collectively contribute to the
aesthetics, functionality, and safety of the construction site. The week demonstrated the
commitment to excellence, professionalism, and attention to detail that characterize the
construction industry. I look forward to the continued learning and growth as I progress further in
my internship.

52
ABOVE ARE PHOTOS FROM SITE WEEK 14
53
WEEK 15
Introduction:
This weekly internship report documents my experiences and activities during the sixth week of
my internship at Asib Limited Construction Site at KNUST Poolside. During this week, I was
engaged in a range of construction tasks, including grouting, floor tiling, welding works, dressing,
plumbing works, painting, plastering, and measurements for interim valuations and claims. These
activities provided me with valuable hands-on experience and insights into the construction
industry.

Day One:
Grouting, Floor Tiling, and Welding Works
The day began with grouting activities, where gaps between tiles were filled to create a uniform
and secure surface and also ensre that tiles achieve their maximum strength. Floor tiling works
continued, with a focus on precise alignment and maintaining consistent spacing between tiles
using tile spacers.
Welders continued their works by engaging in welding works, which involved joining metal
components securely. Safety precautions and welding techniques were closely followed, thus, by
putting on goggles, ear plugs, hand gloves etc.

Day Two:
Floor Tiling, Dressing, Plumbing Works, and Painting
Advanced floor tiling tasks, ensuring tiles were accurately placed and adhered to design
specifications which was our priority during the entire project.Dressing tasks were also ongoing
as usual making sure that the required attentions are given to areas that neede it the most. Plumbers
also undertook some activites aroud the pool that’s the poolside showers, involving the installation
of fixtures and ensuring proper water connections. Painters aslo engaged in painting tasks,
enhancing the aesthetics of various areas on the construction site. Achieved a smooth finish.

Day Three:
Painting, Floor Tiling (Poolside), Plumbing Works, and Dressing
Painting: Continued painting activities, with a focus on areas near the poolside. Ensured a high-
quality finish to improve the site's appearance. Tiliers were also on site on this day to continue
floor tiling to the poolside area, maintaining alignment with design plans and safety standards.
Plumbing works were carried out for water closets and P-traps, ensuring proper connections and
functionality.
Continued dressing activities, ensuring the correct installation and functionality of components
and the reqired patches are given to designated areas to enhance the site's aesthetics.

54
Day Four:
Tiling (Poolside), Grouting, Plastering, and Dressing
Tiling works in the poolside area progressed, with a focus on precise alignment and adherence to
design specifications, alongside grouting activities which were performed to fill gaps between
tiles, ensuring a uniform and secure surface.
Masons also engaged in plastering tasks, contributing to the smooth and polished surface of
designated areas which gave an extra knowledge on plastering. We also continued the day with
dressing activities, ensuring the correct installation and functionality of components to enhance
the site's aesthetics.

Day Five:
Measurements for Interim Valuations and Claimsfor certificates, and Floor Tiling
Together with internship colleques and the quatity surveyor on the projectwe conducted
measurements which is said to be used for interim valuations, ensuring accurate documentation of
work progress.
The measurements will be used to Prepared documentation for claims related to certification,
demonstrating completed works for as at that period.
Advanced floor tiling tasks, emphasizing precision in tile placement and alignment. Consistent
spacing between tiles was also maintained

Conclusion:
The fifteenth week of my internship at Asib Limited Construction Site at KNUST Poolside was
marked by diverse construction activities, contributing to my practical knowledge and skill
development in the construction industry. These experiences reinforced the importance of
precision, safety, and attention to detail in construction work. As I continue to learn and contribute
to the project's success, I look forward to applying these insights in the last weeks of my internship
as get to the end of my inernship.

55
ABOVE ARE SOME SITE PHOTOS DURING THE WEEK15
56
Week16
Introduction
This weekly internship report details my experiences and activities during the last week of my
internship at Asib Limited Construction Site at KNUST Poolside. Throughout this week, I was
involved in various construction tasks, including floor tiling, grouting, plastering, dressing,
plumbing works, painting, and welding. These activities have deepened my practical knowledge
and skills in the construction industry.

Day One:
Floor Tiling, Grouting, Plastering, and Dressing
Commenced the week with floor tiling works in the poolside area that’s the continuation of where
we ended the other day ensuring precise tile placement and alignment were essential to which aids
the team in achieving a uniform and safe surface.
Conducted grouting activities, filling gaps between tiles to create a seamless and secure finish
using a grout mix and cement mortar.
I also so observe tradesmen engaged in plastering tasks to ensure smooth and polished surfaces in
designated areas which also deepened my knowledge about plastering activities. I continued my
day by oberving some dressing activities, focusing on an even appearance of the building.

Day Two:
Floor Tiling, Dressing, Plumbing Works, and Painting
Advanced floor tiling tasks, emphasizing precision in tile placement and alignment. Consistent
spacing between tiles was also maintained alongside oberving some dressing activities which was
ongoing in the machine room, ensuring even and smooth finish of dressed areas.
Plumbers were also on site on this day to carry-out some plumbing works which were conducted
in the kids' pool area, involving the installation of drains and inlet pipes. Proper connections and
functionality were ensured. Painters also engaged in painting tasks, enhancing the aesthetics of
various areas on the construction site. A smooth finish was achieved.

Day Three:
Painting, Floor Tiling (Poolside), Plumbing Works, and Dressing
Painters continued painting activities, with a focus on areas near the poolside. A high-quality finish
was maintained to improve the site's appearance.Floor Tilers were also on site to extend floor tiling
to the poolside area, ensuring alignment with design plans and safety standards. Plumbing works
were carried out for showers and P-traps, ensuring proper connections and functionality, which
gave me a fair idea about how plumbing fixtures work with ragards to their connection to stop
cocks. Dressing tasks were also ongoing as usual making sure that the required attentions are given
to areas that neede it the most.

57
Day Four:
Floor Tiling, Grouting, Plastering, and Dressing
Tiling works in the poolside area progressed, with a focus on precise alignment and adherence to
design specifications. Grouting activities were performed to fill gaps between tiles, ensuring a
uniform and secure surface using grout mix and cement mortar.
Masons also engaged in plastering tasks, contributing to the smooth and polished surface of
designated areas. Continued dressing activities, ensuring the correct installation and functionality
of components and the reqired patches are given to designated areas to enhance the site's aesthetics.

Day Five:
Painting, Grouting, Floor Tiling, and Welding Works
The day began with the painting of aluminum poles, enhancing their aesthetics and protection.
Further grouting activities were conducted to ensure the seamless finish of tiled areas.
Continued floor tiling tasks at the pool area, emphasizing precision in alignment and spacing.
Welders also engaged in welding works, ensuring secure and durable joints in metal components.

Conclusion:
The last week of my internship at Asib Limited Construction Site at KNUST Poolside provided
me with a diverse range of construction experiences. These activities reinforced the importance of
precision, safety, and attention to detail in construction work. I am grateful for the opportunities
to learn and apply my knowledge as I continue to contribute to the project's success.

58
ABOVE ARE SOME PHOTOS FROM SITE WEEK 16
59
Working as a storekeeper on site
Working as a storekeeper on site has provided me with valuable experiences and skills that have
contributed to my personal and professional growth. During my time in this role, I have gained
insights and abilities that extend beyond the confines of my job description. Here are some of the
key experiences and skills I acquired:
As a storekeeper, I was responsible for maintaining accurate and organized inventory records.
This involved receiving, inspecting, and documenting incoming goods, as well as tracking stock
levels to ensure efficient replenishment. Through this process, I developed strong attention to detail
and the ability to manage a large and diverse range of products.
Handling various tasks simultaneously, such as receiving stock, updating inventory, and fulfilling
requests, required effective time management. I learned how to prioritize tasks based on urgency
and importance, ensuring that essential operations ran smoothly. Many of the items in the store
were used for construction or production processes, where quality was paramount. I became adept
at inspecting incoming goods for defects, ensuring that only the best products were accepted into
inventory.
Maintaining accurate records was a core responsibility. This helped me develop a keen eye for
detail and a systematic approach to record-keeping, which are skills applicable to many areas of
work.
Over time, I gained a deep understanding of the store's operations. This insight allowed me to step
up and assist in supervisory tasks, mentoring new staff members and contributing to team
cohesion.
Overall, my experience as a storekeeper on site has not only enhanced my technical skills but also
equipped me with a versatile skill set that is applicable to various roles and industries. I am
confident that the lessons learned during this internship time will continue to positively impact my
career if am to work as a storekeeper on site. Samples of works done during this period are attched
to appendix

60
CONCLUCTION
In conclusion, my four-month internship at Asib Limited's construction site, KNUST Poolside,
was an invaluable and enriching experience. During the internship, I had the opportunity to delve
deeper into the construction industry, gaining practical knowledge about various aspects of the
construction business.
Working on this project gave me a thorough understanding of the complexities associated with
pool construction and the construction industry in general. I have been fortunate to witness and
actively participate in a wide range of activities including tiling, excavation, demolition,
plastering, finishing, painting and creating intricate works of art.
Overall, my internship at Asib Limited was a valuable chapter in my educational and
professional journey. This allowed me to bridge the gap between theory and practice, improving
my knowledge, skills and confidence in the construction industry. I am grateful for the advice
and guidance I received from the experienced professionals at Asib Limited.
I will carry the lessons and experiences of this internship with me as I progress in my career. I
am excited to apply what I have learned to future endeavors in the construction industry and am
confident that this internship has laid a strong foundation for my future success.
I would like to express my gratitude to the entire team of Asib Limited for providing me with an
exceptional learning opportunity. It was an honor to be a part of this project and I look forward
to applying the skills and knowledge gained in my future endeavors in the construction industry.

61
APPENDIX
ATTACHED ARE SOME WORKS DOCUMENTS I DID ON SITE .

General Site Meeting Report


Date: 19th July, 2023
Time: 10:30 AM - 12:20 PM
Location: Asib Limited Construction Site, KNUST Pool Side

Attendees:
Site Supervisor – Mr. Jacob Alornyoh
Quantity Surveyor – Mr. Ayongah Musah Mattthew
Client Representatives – Arch. Kojo Safo-Kantanka, Arch. Nana Agyemang Cobbinah
Subcontractor Representatives – Mr. Yaw Owusu Ansah
Other Team Members – Mr. Andrews Naworagyere, Mr. William Gyamfi
I am are pleased to present this report summarizing the proceedings of the construction site meeting
held at ASIB LIMITED construction site at KNUST pool side on 19th July, 2023 at 10:30 AM.
The meeting was organized to discuss and review the progress of the construction project and
address any issues that require attention. The meeting brought together key stakeholders, including
project team members, client representatives, and subcontractors, to ensure effective
communication and collaboration.

Agenda:
Site Tour
Review of Previous Meeting Minutes
Progress Report by Quantity Surveyor
Questions and Concerns from Client Representatives
Meeting Summary:
The construction site meeting commenced at 11:00 AM at the designated location, the KNUST
Pool Side, with all attendees present. Us site supervisors we welcomed everyone and thanked
them for their participation and made sure that they are all privided with the necessary personal
protective gears.
Site Tour
Before the formal meeting began, together with the attendees we conducted a brief site tour to
observe the progress on various work areas and understand the current status of the construction
project and this tour lasted about 30 minutes.
Review of Previous Meeting Minutes

62
The minutes from the previous construction site meeting were read and approved by the attendees.
Action items were reviewed, and it was confirmed that all relevant issues had been addressed.
Progress Report by Quantity Surveyor
The Quantity Surveyor of ASIB LIMITED provided a comprehensive progress report on the
construction project, highlighting the achievements made since the last meeting, including the
completion of the wall tiling, blockwork, and the successful coordination with subcontractors.

Questions and Concerns from Client Representatives


Following the progress report, the client representatives had an opportunity to ask questions and
raise concerns.
They inquired about how waste are been manage on site, what demolished steel pipes will ne used
for,the capacity of sand filters to be used for the pool and as to whether they will be enough and
warranty as to its life spand, exposed air condition copper pipes, some cracks in plasterboard
ceilings and any potential variations in the project scope.We addressed their queries satisfactorily,
assuring them of the project's smooth progression. They then went on to make some suggestions
which includes, providing sprinklers to the grasses, additional sand filters, provision of two
additional revits to hinges of lockers and finally ask us to make provisions for eight(8) working
pumps and additional two stand by, incase one of the working pumps breaks down. Some
informations which was requested for from the previous meeting from the last meeting was also
brought to site by the client representatives that’s the painting scheme for the project.
Meeting Conclusion
The meeting concluded at 12:20 PM on a positive note. The attendees expressed satisfaction with
the progress made so far and the effective communication between the construction team and the
client representatives.
Next Meeting
The next construction site meeting is scheduled for 16th August, 2023 at 10:30 AM at the same
location.

Submitted by: Andrews Naworagyere