Amps SED NRO 11 (Nom. kV=22.9, Plot Ref. kV=22.

9)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 Load 11 TRAFO 11 75 KVA 500


FLA FLA - Other 65
300 300

CB 11/LN160 Fuse11 3K

100 100

50 50

30 30

10 10

TRAFO 11 75 KVA
5 Line6 5
Seconds

Seconds
3 3

1 1

.5 .5
29.9 A, 0.318 s
Cable 11 - P
.3 29.9 A, 0.196 s .3

Fuse11 3K
SED NRO 11

.1 .1
TRAFO 11 75 KVA
TRAFO 11 75 KVA
75 kVA
Inrush 29.9 A, 0.0229 s
.05
Bus12 .05

Cable 11

.03 3-1/C 25 .03


CB 11/LN160
CB 11/LN160 - 3P Fuse11 3K - 3P
Bus10

.01 Load 11 .01


.575 kVA 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps SED NRO 11 (Nom. kV=22.9, Plot Ref. kV=22.9) ETAP Star 19.0.1C

Project: ELECTRIFIC. PAMPA INALAMBRICA Date: 02-28-2023


Location: ILO-MOQUEGUA-PERU SN:
Contract: Rev: Base
Engineer: JORGE LUIS G.C. Fault: Phase
Filename: C:\ETAP 1901\PAMPAINALAMBRICA\PAMPAINALAMBRICA.OTI