You are on page 1of 1

KEYPLAN

T1-01T1-02 T1-03 T1-04 T1-05 T1-06 T1-07 T1-08 T1-09 T1-10 T1-11 T1-12T1-13T1-14T1-15 T1-16T1-17T1-18 T1-19 T1-20T1-21 T1-22 T1-23T1-24 T1-25 T1-26 T1-27 T1-28 T1-29 T1-30T1-31T1-32 T1-33T1-34 T1-35T1-37T2-01T2-02

565 4680 50 1615 2925 1145 1130 3290 1840 3300 315 135 1415 445 2830 640 1825 640 2830 445 1415 450 3300 1840 3340 1080 2060 1695 295 1590 710 1410 1335 1330 1600
75
T1 T2
NT-1A NT-2A NT-3A NT-4A NT-5A NT-6A NT-7A
7900 7900 7900 7900 7900 7900
T3

375
3635

200 200 200 200 200 200 200 NOTES:

01

01

01

01
300

01
300
PC

PC

PC

PC
1. THIS DRAWING IS THE COPYRIGHT OF WME CONSULTANTS, AND

01

01

PC

01
PC

PC
NT-A1 MUST NOT BE RETAINED, COPIED OR USED WITHOUT THE ABOVE

PC
300
CONSULTANT'S AUTHORITY.

300
300
300
300
2. DO NOT SCALE FROM THE DRAWINGS.
3. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS IN METRES
UNLESS NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON
375 SITE AND APPROVED BY THE ENGINEER.
4. ALL DRAWINGS SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS AND ALL RELEVANT SECTIONS OF THE
SPECIFICATIONS. ANY DISCREPANCIES ARE TO BE BROUGHT TO
THE ATTENTION OF THE ENGINEER AND RESOLVED BEFORE
COMMENCEMENT OF ANY WORK.
7990

7990

STRUCTURAL REFERENCE DRAWING


700 700 BASEMENT-02 EXCAVATION
700 700 RP-WME-ST-COMM-00-031-00 GENERAL ARRANGEMENT PLAN
280 350 250 250 250 440 435 250 250 250 250 350

04
RP-WME-ST-TWR1-00-300-01 FOUNDATION GA SECTION

02

-C

05

07

08
06
-C

T1
03

-C

-C

-C
RP-WME-ST-COMM-00-000-03 STANDARD DETAILS GENERAL NOTES - 01
01
775

775

775

775

775

775

775

775
T1

-C
-C

1125

1125

1125
T1

T1

T1
-C

T1
T1
RP-WME-ST-COMM-00-000-04 STANDARD DETAILS GENERAL NOTES - 02
T1

T1-A
350

2175

2175
1400

1045

1050
T1-B
1880

175 200 50

835
830

830

830
100
T1-C ARCH. REFERENCE DRAWING
2920
1465

600 RECEIVE MAIL ON -23RD MARCH 2023


T1-D

3005

3005
09

275 275 275 450


290
-C

11

12
915

375

10
525 525
T1

-C

-C
T1-E

-C

T1

T1
T1

375
250

1315 3820 500 1755


T1-F

375
780

780
850
1080

1080
500 930

8990 500 1440 675

300 1130
525 1590 500 8990
1125 485 1060 50 1180

925 830 500 3645 300 1925 450 2370 MEP. REFERENCE DRAWING
700

150

T1-G

350
2490

T1-H

350
350

300
300
350

650 650

300

350
1150
750
660

200
250

450 650 375

375
13

450 855
1325
-C

T1-J
T1

2850

2850

2850
T1-K

350 300
905 450 650

325
250

700 450
125

450 2700 300 300 300 300 300 200 300 450
T1-L 850

975
1075

1225

1225

300
300 1440

300
300
650 650

200
14780

200
1850

T1-M

970
350
14

450 2700
1265190 900

415

T1-N
250

2370
-C

300
500
500

14975
300

800 6090
200

T1

2750

2750
T1-P

2250
750 3345 450
T1-Q

380 730
1090 300 450

1115
850 800 8190 500 1755
500
200

1755 500 8190 800

275
300

325
300
100

2440

700

T1-R
830 300

325
T1-S

17
1590
250 1180

925 830 500 3645 4745


1130

1130
1755 2730 600 300 300 600 2730 300

300
16
100

-C
250
930
15

250 250
290

-C
375

T1
50
-C

300

375
T1
1825

1825
1825
T1

18
375
300

-C
T1-T

T1
250

250

850 275 275 275


2055

T1-U
1930

1930
130 535 1075 315 465 250 450
2920

600
T1-V 250
850

250
305

100 250 250


T1-W
2730

2730
19

200 50
1695

-C

250 250 250


T1

T1-X 400
1285

1285
20

21
-C

-C

1790

1790
100
105

T1

T1
2775

24

25
22
775

775
-C

-C
-C
510

T1-Y

T1

T1
T1

23

26
1200

-C

-C
775

775

T1

T1

3085
2535

280
T1-Z

2110

2110

2110
700 1315 100 700
2760

700 700
02

02

02

02

02

02
02

PC

PC

PC

PC

PC

PC
600

600

600

600

600

600
02

PC

02
PC
03

02
02

NT-A

PC
PC

PC
PC
600

600

600

600

600

600
R0 06.04.2023 ISSUED FOR CONSTRUCTION RK
265 225 225 225 225 225 REV NO. DATE DESCRIPTION BY.
225 225 225 225 225 225
STATUS:

5275 5735 6260 5610 3405 1950 3405 5610 6260 5635 3380 ISSUED FOR CONSTRUCTION
PROJECT:

NT-01 NT-02 NT-03 NT-04 NT-05 NT-06 NT-07 NT-08 NT-09 NT-10 NT-11 NT-12
RIVALI PARK, PHASE III
Mumbai, India

CLIENT:

TOWER-01 BASEMENT-02 COLUMN AND WALL SETTING OUT PLAN


1 : 100

ARCHITECT:

29 Bank Street, Fort, Mumbai 400 023 Tel : 2266 1920

STRUCTURAL / MEP CONSULTANT:

DRAWING TITLE:

TOWER-01
BASEMENT 02- COLUMN AND WALL
SETTING OUT PLAN
DATE: SCALE @ A1: DRN BY: CHKD BY: APP BY: REVISION
06-04-2023 1 : 100 RK SP NR R0
PROJECT No: DRAWING No:
P550012 RP-WME-ST-TWR1-B2-450-00

You might also like