HT METER WING

1) Instead if IR port data capture need high speed Cable communication Equipments like use rs 232
wired communication via MRI machine.
2) Need high speed dump machine (MRI) to data transfer to system.
3) Need to change CTPT Design To avoid interruptions mainly in Rainy Season.
(In coming cable side the distance between phase to phase and phase to Earth very small,
insulator size and design small)

Commercial

1) EV Vehicles charging Points


2) QR codes in every BILL to easy bill payment
3) Day wise Discount in bill payment( Ex: 1st day Bill payment 30 Rs Dicount,2nd day 25 rs, 3rd Day 20
rs after 5 days of Bill generation no discount)
4) High penalty of 15 days of bill generation Payment
5) Tariff Units Modification (0-40 units.,41 to 80 units etc)
6) Prepaid meter in except below 200 units per month in All cat.
7) Use 4th -6.35KV line to calculate village and AGL consumption(meter in substation with separate
CT)
8)

Administration

1) Divide the work allocation in to two parts Technical and Finance nothing
but Divide Distribution into two parts
Technical wing 33KV line to DTR LT fuse (Sub Engineer+Foremen+SLI+LI)
Finance wing DTR to Total LT lines and Money collection
(LM+ALM+JLM+Unmanned)
AE co-ordinate Both wings
Technical Means-input,ouput ,losses ,lines, load,conductor size,any
damage in lines like breakdowns,middle poles,etc any thing related to