Types of Construction
⑤ RULE5 -
④ RULF6 -
Fire-Resistive Requirements in Construction
⑦ RULE7 -
④ RULE9 -
Sanitation
⑩ RULE 10 -
④ RULE 11 -
Protection of Pedestrian During Construction
and Demolition
Philippines
SECTION 101 . TITLE .)
9 CONSTRUCTION all on-site work done in the site
1
IRR =
Revised Implementing Rules and
Regulations of the National 10) CONVERSION -
a
change in the use or occupancy of
"
·
Architectural · Traditional indigenous family CDPWH]
·
Civil/structural dwellings 13) EXECUTIVE
.
DIRECTOR -
authorize to
enforce the provisions of the code and its
SECTION 106 DEFINITIONS . IRR in the field
1) ADDITION
any new construction which increases the height 16) REFERRAL CODES applicable provisions of the various
and/or floor area of existing building agency and technical professional codes
2 ) AGENCY OF THE GOVERNMENT
.
various units of the government
3) . ALTERATION
changes in the materials used , partitioning ,
17 )
. RENOVATION -
the height and the floor area 18.) SECRETARY Head or Chief Executive Officer of
4) APPLICATION FORMS application form doly accomplished and DPWH
notarized by the respective design .)
19 STAFF-personnel of the National Building code
professional with validation Development Office (NBCDO)
5) APPLICANT/PERMITTEF -
section 206
. Qualification of Building Officials
Section 203
. Functions of the
secretary ④ A Filipino citizen and of good moral character
1) Formulate policies in accordance with the code & A
registered architect civil engineer
or
6) Appoint a
Building Official
Section 208. Fees
The BO shall retain not than 20 % of the
Section 205 .
Officials
Building more
income/collection
ASSISTANT
BUILDING
OFFICIAL Section 212 . Administrative Fines
.
1
Imposition of Administrative Fines
CASHIER ADM & LEGAL ↳
Secretary impose fines not exceed
P 10 , 000 00
.
③ Architectural or >
-
construction of Superstructure 50 %
Accessibility up to 2 . 00 m
Section Construction of superstructure 100 %
④ Civil/structural >
-
above 2 00 m .
section
⑦ SanitarySection >
-
③ Unsafe ElectricalWiring
④ Unsafe Mechanical Installation
⑤ Inadequate Sanitation/Plumbing RULE VI-FIRE RESISTIVE REQUIREMENTS IN
withstand fire
material
↳
length of time a can
Section 307
. Appeal REQUIREMENT OF ALL BUILDINGS BY USE
Filing
-
15
days from suspension/non-issuance OR OCCUPANCY
Section 309
. Certificate of Occupancy
Section 701. Occupancy Classified
of GROUP A : RESIDENTIAL DWELLINGS
Building official Certificate
issues
·
of single
Occupancy after final Division 1 use
family
-
30
days
inspection occupants
Division of
2 use
non-leasing
-
↳
boarding or
lodging houses accomodates
fire-resistant materials
than 10 persons
③ Type III -
IV
:
-
Division 1 -
Mental hospitals jails , etc
.,
. on
patients
·
GROUP E-Business and Mercantile
Division 1 -
Division 2 -
garages
·
GROUP F Industrial Section 708
. Minimum Requirements for Group A
dwellings
↳ ice
plants , power plants ,
etc. 1 )
.
·
Dwelling Location
GROUP and Hazardous than 90 % of
G-storage ↳ not lot
·
more a corner
an
Division 2 -
Assembly Other
Than Group I ↳ at least one sanitary toilet & adequate
Division and drainage
1
assembly building with a washing facilities
-
Post
Division 4 -
200 Kg/m2
amusement park not included :
2nd floor -
150 kg/m2
in Group / or Dir 4-3 .
7)
. Roof
·
GROUP I -
·
GROUP J-
Accessory rise : 200 mm
Division 1 -
Philippine
Section . Mixed
703 Occupancy 11) Mechanical Requirements
Types of Occupancy Separation ↳ Mechanical systems and /or equipment installations >
Philippine
-
.
3
a .
Separation"
"One-Hour Fire-Resistive Occupancy Mechanical
Engineering Code
↳ not less than
1 hour
.
b "Two-Hour Fire-Resistive Occupancy separation" RULE VILL-LIGHT AND VENTILATION
↳ not less than 2 hour
.
c "Three-Hour Fire-Resistive Occupancy Separation" Section . Measurement of
802 Site
Occupancy
↳ not less than 3 hour ·
Courts
exceeding
3
not
d .
"Four-Hour Fire-Resistive Occupancy Separation"
·
Yards 1 20 meters
.
in width
↳ not less than 4 hour light wells
·
Section 707 .
Maximum Height of Buildings Section 803
. Percentage of Site Occupancy
·
Average car parking slot · PSO -
↳ Parallel :
2 15 m by 6
) Open Spaces
m :
3
.
↳ 3 6 . m by 18m
b) Total Open Spaces within Lot (TOSL)
·
Jeepney or shuttle park
9
↳ 3 0m.
by m
SECTION 804 ·
Sizes and Dimensions ofCourts
4 .
7 · PSO -
Maximum Allowable Percent age ·
Minimum horizontal dimension (courts & yards)
of site
Occupancy ↳ not less than 2 0 m .
·
ISA -
·
MACA- Maximum Allowable Construction ·
Buildings of more than two (2) storey in height
Area width
↳ :
300 mm
·
USA -
Maximum Unpared surface
Area SECTION 805
·
Ceiling Heights
·
TOSL
-
Second storey
↳ : 2 . 40 meters
↳
succeeding stories : 2 10 meters
.
SECTION 806
. Sizes and Dimensions of Rooms
b .
Requirements in Determining
the size of Rooms
per #
b .
Workshop Factories. & Offices , 12 m per &
c .
Habitable Rooms 14 m per &
Rooms
↳ 10 % of Floor Area
·
Eaves , Canopies , Awnings (media agual
* windows : not less than 750mm from the side/property line
·
In case of emergency :
↳ min clear .
m//m of height
* NO vent shaft have least dimension less than 600 mm 1105
Section .
Walkway
Air Ducts 1 20m wide
Temporary Walkway :
· · .
not less than 300 above street surface section . Pedestrian Protection
1106
openings : mm
·
Railings : at least Im height
RULEIX-SAMITATION ·
Fences : not <2 40m above grade .
Canopies
· : 2 .
40m above railway
section 90e Water supply system 22-600kg/m2
:
SECTION 1002
. Projection into Alleys Street
or to 1 vertical
(center to center)
· outmost edge & curbline : not be less than 300 mm
2 . Roof Trusses
SECTION 1007 ·
Doors , Windows .
3 Attics
· not <2 40 m above .
750m2 w)
> Fire Extinguishing system
-
Section 1207 .
Stairs . Exits , & Occupant Loads ·
Landings
.
2 Exits * not exceed 1 20m when
.
stairs has straight
# of exits
·
: run
·
Arrangement of exits :
12
. Aisles
~ 2 exits : not less than 15 apart · Width
·
Distance to exits < 800mm (one side)
> 45 . 00 m ↳ > 1 00m
.
(both side)
.
3 Doors 13 .
Seats
Width & Height seat Spacing
· ·
> clear width not less than 700 mm Rows of 35 seats or less :
500 mm
·
Door Leaf Width Rows of 45 seats or less : 525 mm
Change in
·
Floor Level at Doors Width : > 450 mm
> Floor
Landing : not more than 50 mm
.
5 Stairways
Width
·
Rise : (200 mm
run : 250 mm
·
winding stairways
Run :
< 300 mm
·
circular stairways
Run : > 250 mm
Ancillary Permits duly signed an sealed by the a Location and Site Plans
.
c Notes
- ↑
Electrical Permit .
Design Analysis
· f
.
g
Permit
Sanitary ) Mechanical Documents
·
7 .
10 ) .
Electronics Documents
*
Accessory Permit 11 ).
Geodetic Documents
Exemption From BuildinI Permits 12) Clearance From
·
Agencies Other
·
Minor construction DPWH Department of
-
·
Repair Works ATO Air Transportation Office
-
. -
Department of Tourism
2) Applicant is the registered owner of the lot : DENR -
· - -
·
Duly notarized copy of the contract of Lease ,
PHIVOLCS -
Philippine Institute of Volcanology and Seismology
or Deed of Absolute sale LLDA Laguna Lake Development AuthoritY
sets of documents MWSS Manila waterworks and Sewerage system
3) 5
-
Agrarian Reforms
Department of
e .
) Seismic Analysis
7) Other Related Docs