QUANTITY

SURVERING
Week 5
Conf irming the names of the
presenters last meeting
GROUP HOMEWORK #1:
No submissions:
▪ Abustan, Jayzel
▪ Casulla, Mel Xavie
▪ Llagas, James Ric
▪ Mercardo, Leeann Antonette

▪ Teammates, please con rm their pa icipation and they


will be allowed to submit through bb message.
INDIVIDUAL HOMEWORK #1:
No submissions:
▪ Casulla, Mel Xavie
▪ Llagas, James Ric
▪ Mercardo, Leeann Antonette

▪ Are the following individuals still going to submit their


outputs?
INDIVIDUAL HOMEWORK #2:
No submissions:
▪ Casulla, Mel Xavie
▪ Llagas, James Ric

▪ Are the following individuals still going to submit their


outputs?
FLOW OF DISCUSSION:
▪ Quiz No. 1
▪ Discussion of Homework and Recap of previous
discussion
▪ Discussion of Plate No. 1
▪ Seatwork
▪ Continuation of discussion of the following topic
▪ Discussion of Plate No. 2
QUIZ NO. 1
▪ 30 minutes only
▪ Place your bags and phones in front.
▪ Clear your desks. Black ball pen only.
HOMEWORK #1
▪ General Requirements
▪ Pro t
▪ Taxes
▪ Contingencies
▪ Allowances
G e n e r a l r e q u i r e m e n t s
or general conditions refer to a
variety of operations, procedures, and
indirect costs that are not directly linked
to construction, but are still essential for
successfully executing the project.
T he se conditions — which include
project management, temporar ysite
facilities, safety compliance, and waste
removal, among many other things —
are outlined in the construction contract
and project speci cations.
https://www.procore.com/librar
construction y
/ general-conditions-
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
https://www.dpwh.gov.ph/dpwh/sites/default/ les/issuances/DO_197_s2016.pdf
ADDITIONAL GUIDANCE ON THE
PLATES:
▪ Both Project Owner and Contractor should create their
company prof il e, to include company name and
organizational structure.
▪ For Project Owner, include in the project brief the
reason for selecting the project, to include its purpose
and impact to the community should the project is to
realized.
COMPILATION INSTRUCTIONS:
▪ Coverage Page
▪ Uploaded through bb
▪ By now, each team should have completed the following:
▪ Company prof il e (par ti al, with company name and
organizational cha )
▪ Project Brief (1 pager only)
▪ Parametric Estimate
▪ WBS
DISCUSSION OF PLATE #1
SEATWORK
▪ Prepare the General Requirements of your respective
projects.
▪ Since the Direct Cost is yet to be determined, establish
f irst the formula and provide justif ic ation for its
inclusion under General Requirements.
▪ You are given 1 hour to complete this task.
▪ Presentation per group will follow.
TOPIC NO. 3
COMMON
CONSTRUCTION
WORK PACKAGE
Week 5
STRUCTURAL WORK PACKAGES
▪ Site Preparation
▪ Formworks and Sca oldings
▪ Rebar Works
▪ Concrete Works
▪ Mason Works
▪ Waterproo ng Works
COMMON 
ARCHITECTURAL WORK PACKAGES
▪ Ceiling Works
▪ Wall and Baseboard Works
▪ Metal and Glass Works
▪ Painting Works
VIDEO PRESENTATION
https://www.youtube.com/watch?v=SPSWfSyIhV4
PLATE NO. 2
1. Research the dif ferent Construction Methodologies
for work packages aligned to the WBS previously
prepared.
2. Deadline: Next meeting (March 8, 2024)
3. A4, 12, Palatino Linotype, 1.5 spacing, peer grading
INDIVIDUAL HOMEWORK
1. No individual homework
NEXT MEETING
1. Prelimina Exam
REFERENCE MATERIALS:
AACE International, Chapter 9, Estimating, Lar R. Dyse
h t t p s :
//www.dpwh.gov.ph/dpwh/sites/default/f iles/webform/civil_works/bid_bulletin/
23kc0044_-_boq.pdf
h t t p s :
//www.dpwh.gov.ph/dpwh/sites/default/f iles/webform/pow/POW%2019J00114.
pdf
https://www.adroitprojectconsultants.com/wp-content/uploads/2017/04/An-
Example-Deliverable-Oriented-Work-Breakdown-Structure-WBS-for-a-
Residential-Project.jpg
FUTURE ADDTL NOTES:
For Electrical and Mechanical, students are to
canvass for subcontracting of the scope.
Pa of the plates: