You are on page 1of 1

KEY PLAN

G GENERAL
D8 DESIGN WATER LEVEL= +/- 0.000m DMD C9 ALL CONCRETE SHALL CONTAIN AN APPROVED WATER REDUCING AND PLASTICIZING ADMIXTURE. APPROVED HIGH-RANGE WATER REDUCING ADMIXTURE
G1 STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, DOCUMENTS, SPECIFICATIONS, ETC. AS MAY BE MAY BE UTILIZED AT THE CONTRACTOR’S OPTION. ALL CONCRETE PERMANENTLY EXPOSED TO WEATHER SHALL ALSO CONTAIN AN APPROVED AIR
ISSUED DURING THE COURSE OF THE CONTRACT. ALL DISCREPANCIES SHALL BE REFERRED TO THE DESIGN CONSULTANT BEFORE PROCEEDING. D9 DESIGN VALUES FOR WATERSTOPS AT EXPANSION JOINTS:
ENTRAINING ADMIXTURE TO PROVIDE PERCENTAGE OF AIR REQUIRED FOR SEVERE EXPOSURE AS PER ACI 318.
G2 THE STRUCTURAL DRAWINGS ARE TO BE REFERRED FOR STRUCTURAL MEMBERS, SIZES AND REINFORCEMENT ARRANGEMENT, EXACT LOCATION / - DEFLECTIONS IN EXPANSION JOINTS: C10 MAXIMUM PERCENTAGE (BY WEIGHT) OF SALT CONTENTS PERMISSIBLE IN AGGREGATES USED FOR CONCRETE, HOLLOW BLOCKS AND HOURDI BLOCKS,
ORIENTATION AND DETAILS AS PER ARCHITECTURAL DRAWINGS. IN CASE OF DISCREPANCIES REFER TO THE ENGINEER FOR CLARIFICATION PRIOR TO EXPANSION JOINT ETC. SHALL BE AS FOLLOWS:
START OF RELATED WORK.
G3 ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING DRAWINGS. ALL STRUCTURAL FLOOR LEVEL DEFLECTION - ACID SOLUBLE CHLORIDES IN AGGREGATE - (FINE 0.03%, COURSE 0.02%)
VX
MEMBERS ARE CENTRAL ABOUT GRID LINES UNLESS SHOWN OTHERWISE. ONLY WRITTEN DIMENSIONS ARE TO BE FOLLOWED. BASEMENT 1 Vx= ± 15mm Vy= ± 15mm VR= ± 20mm - ACID SOLUBLE SULPHATE IN AGGREGATE - (FINE 0.30%, COURSE 0.20%)
G4 ALL LEVELS SHOWN ARE IN METERS WITH REFERENCE TO DUBAI MUNICIPALITY DATUM (DMD) UNLESS NOTED OTHERWISE. VR
VY
G5 FOR MAIN SETTING OUT LINES AND LEVELS REFER TO ARCHITECTURAL DRAWINGS. ALL DIMENSIONS AND CONDITIONS MUST BE VERIFIED ON SITE AND NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE.
D10 LOADS FROM CONSTRUCTION METHODOLOGY:
ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING WITH THE PORTION OF WORK INVOLVED.
C11 THE FOLLOWING CLEAR MINIMUM CONCRETE COVER TO PRIMARY REINFORCEMENT (INCLUDING LINKS) ACCORDING TO ACI 318-08 / CHAPTER 7.7.1 AND
G6 IN CASE OF DISCREPANCIES IN DETAILS OR MISSING DETAILS THE ENGINEER MUST BE APPROACHED PRIOR TO START RELATED WORKS. ENGINEER'S - LOAD AREA FOR CONSTRUCTION TRAFFIC ON GROUND FLOOR SLABS ACCORDING TO DRAWINGS 7.7.2 AND CIRIA C577 "GUIDE TO THE CONSTRUCTION OF REINFORCED CONCRETE IN THE ARABIAN PENINSULA" SHALL BE PROVIDED, UNLESS LARGER
DECISION IN SUCH MATTERS SHALL BE FINAL WITHOUT ANY EXTRA CLAIM. "CONSTRUCTION METHODOLOGY: STRENGTHENED SLABS" (ACCORDING TO BASIC DESIGN CRITERIA "ALL") COVER IS NOTED, IN THE STRUCTURAL ANALYSIS AND ON THE DRAWINGS:
GENERAL NOTES:
G7 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER SETTING OUT OF WORKS, FOR CORRECTNESS OF POSITION, LEVELS AND ALIGNMENTS OF ALL
PARTS OF THE WORKS, FOR QUALITY AND FINAL FINISHES. IF AT ANY TIME DURING THE PROGRESS OF WORKS ANY ERROR IS DETECTED AT ANY PART MINIMUM CLEAR NOMINAL CONCRETE COVER TO PRIMARY REINFORCEMENT (MM):
THE CONTRACTOR SHALL RECTIFY THE SAME AT HIS OWN EXPENSE. THE CHECKING/APPROVAL BY THE ENGINEER SHALL NOT IN ANY WAY RELIEVE THE
CONTRACTOR FROM HIS RESPONSIBILITY FOR THE CORRECTNESS OF THE ABOVE.
C REINFORCED CONCRETE CAST-IN-PLACE CONCRETE (NONPRESTRESSED) (ACCORDING TO ACI 318-08/ CHAPTER 7.7.1 / 7.7.3)

C1 CONCRETE DESIGN, SPECIFICATION AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH RELEVANT AMERICAN STANDARDS AND CIRIA C577 CONCRETE CAST CONCRETE NOT
G8 THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THE SAFETY OF CONSTRUCTION AT ALL TIMES AND SHALL ENSURE THAT NO PART OF CONCRETE EXPOSED
"GUIDE TO THE CONSTRUCTION OF REINFORCED CONCRETE IN THE ARABIAN PENINSULA". ELEMENT AGAINST OR EXPOSED WEATHER/
INTERMEDIATE COMPLETED CONSTRUCTION IS HAZARDOUS (FOR EXAMPLE: SIDES OF EXCAVATION, STARTER BARS ETC.). TO EARTH/WEATHER
EXPOSED TO EARTH CONTACT WITH EARTH
G9 ANY TEST REQUIRED BY THE ENGINEER ON MATERIALS, SOIL, STRATA, WORKMANSHIP OR ON COMPLETE WORKS SHALL BE CARRIED OUT BY THE C2 ALL CAST-IN-SITU CONCRETE SHALL HAVE MINIMUM 28 DAY CYLINDER COMPRESSIVE STRENGTH FOR VARIOUS ELEMENTS AS GIVEN IN THE
CONCRETE MATERIAL SCHEDULE . ALL CONCRETE SHALL BE NORMAL WEIGHT CONCRETE MINIMUM DENSITY OF 2400 KG/M³ AND SHALL HAVE FOUNDATION 75 40
CONTRACTOR AS INSTRUCTED BY THE ENGINEER AS PER CONTRACT. ALL EQUIPMENT REQUIRED FOR SUCH TEST SHALL BE SUPPLIED BY THE CONTRACTOR 50 / 40
ON DEMAND BY THE ENGINEER. MAXIMUM SIZE OF COURSE AGGREGATES OF 20 MM UNLESS NOTED OTHERWISE (CONCRETE C16/20: AGGREGATE SIZE 10 MM). PILES 75 -
-
G10 THE CONTRACTOR SHALL PROVIDE TEMPORARY BRACING AND SHORING AGAINST LATERAL FORCES AND ALL CONSTRUCTION LOADS THROUGHOUT THE FREE WATER/CEMENT RATIO IS INCLUSIVE OF ALL CEMENTITIOUS MATERIAL INCLUDING SILICA FUME AND GGBFS AND IS SUBJECT TO PILE CAPS 75 40
50 / 40
CONSTRUCTION PROCESS. SATISFACTORY COMPLETION OF STRENGTH AND DURABILITY TESTS. THE CONSULTANT MAY GIVE APPROVAL TO REDUCING THE CEMENTITIOUS 40
MATERIAL. COLUMNS - 50 / 40
G11 ALL DESIGN, WORKMANSHIP AND MATERIAL SHALL BE IN ACCORDANCE WITH THE CURRENT ACI, UBC, IBC, AISC, BS, LOCAL AUTHORITY STANDARDS WALLS, SHELLS - 40/20
50 / 40

MAX RAPID CHLORIDE PERMEABILITY


AND PROJECT DESIGN CRITERIA UNLESS NOTED OTHERWISE.

MAX. INITIAL SURFACE ABSORPTION


QUAY/PROTECTION WALL & SLAB, -

TO BS 1881PART 208 (ml/m2/s)


-

TO AASHTO 1277 (COULOMBS)


50 / 40

AGGREGATE SIZE MAX. mm


G12 LOADS ON STRUCTURE SHALL BE IN ACCORDANCE WITH THE FOLLOWING STANDARDS: BRIDGE COLUMNS & PONTOON PILES

30 min WATER ABSORPTION

MAX. DRYING SHRINKAGE


TO BS 1881 PART 122(%)

TR BS 812 PART 120 (%)


MAX. WATER PERMEABILITY
CLASS OF CONCRETE
- ASCE 7-05 - FOR DEAD, IMPOSED, WIND AND IMPOSED ROOF LOADS 40
EXPOSURE BEAMS - 50 / 40
- UBC 97 FOR SEISMIC LOADS

TO DIN 1048 (mm)


METHOD

CONTENT (kg/m3)
CONDITIONS SLABS - 50 / 40 40/20
GRADE COMPOSITION

MIN. CEMENT
OF

CEMENT RATIO
G13 ALL ELEMENTS OF THE STRUCTURE DESIGNED BY THE CONTRACTOR SHALL BE SUBMITTED TO DESIGN CONSULTANT FOR REVIEW. THE SHOP DRAWINGS

MAX. WATER/
TO BS 8110

REMARKS
PURPOSE PLACING CONCRETE MIX OPTIONS PARAPETS,UPSTANDS - 40/20
SHALL SHOW ALL REQUIREMENTS FOR SERVICES, PENETRATIONS ETC. FOR THE ENGINEER'S APPROVAL. MODIFICATIONS NECESSITATED BY DETAILED PART 1 50 / 40
PLANT INFORMATION SHALL BE SUBJECT TO THE ENGINEER'S APPROVAL. TABLES 3.2 & WATER TANKS 40/20
50 / 40
G14 FOR ALL BUILDERS WORK INFORMATION (OPENINGS IN STRUCTURAL ELEMENTS, LIGHTING POINTS, GULLIES, CAST-IN PIPES, SLEEVES, ELECTRICAL 6.1
PRECAST ELEMENTS AS PER ACI 318-08 7.7.3
TRENCHES, MANHOLES ETC) REFER TO MEP DRAWINGS FOR LOCATION. THE CONTRACTOR SHALL PREPARE COORDINATED SERVICES DRAWINGS
IDENTIFYING STRUCTURAL, MEP AND ARCHITECTURAL ELEMENTS/DETAILS FOR CONSULTANT`S REVIEW BEFORE COMMENCEMENT OF CONSTRUCTION IN
THE AREA CONCERNED.
EXTERNAL IN CRANE MINIMUM CLEAR NOMINAL CONCRETE COVER TO PRIMARY REINFORCEMENT (MM):
G15 THE DESIGN CONSULTANTS REVIEW PROCESS FOR ALL SUBMITTALS, DRAWINGS, METHOD STATEMENTS AND DOCUMENTS IS ONLY COMPLETE ONCE A 1 SRPC + (66%~80%) GGBS
A BLINDING CONTACT WITH 20 OR C20/30 * * * * * 250 0.45 CAST-IN-PLACE CONCRETE (NONPRESTRESSED) (ACCORDING TO ACI 318-08/ CHAPTER 7.7.2 / 7.7.3)
STATUS OF NO OBJECTION IS REACHED. THE SUBMITTAL SHALL BE REVIEWED BY THE DESIGN CONSULTANT FOR COMPLIANCE WITH THE DESIGN 2 SRPC + (36%~55%) FLY ASH
GROUND PUMPING CONCRETE CAST CONCRETE NOT
INTENT.THIS DOES NOT RELIEVE THE CONTRACTOR FROM HIS CONTRACTUAL RESPONSIBILITIES. CONCRETE EXPOSED
1 OPC+(66%~80%)GGBS ELEMENT AGAINST OR EXPOSED WEATHER/
G16 THE CONTRACTOR SHALL SUBMIT RECORD DRAWINGS OF THE AS-BUILT WORKS FOR THE ENGINEERS APPROVAL. VERY SEVERE : TO EARTH/WEATHER
CRANE +MS+WP EXPOSED TO EARTH CONTACT WITH EARTH
B SLAB ON EXTERNAL IN 20 C30/40 0.04
OR 1000 10 0.15 1.0 380 0.38
G17 ALL ASTERISKED DIMENSIONS (INDICATED THUS: 98*) ARE CONFIRMED ON SITE AND REPORTED TO THE CONSULTANT OF CONSIDERATION. GRADE CONTACT WITH OPC+ (36%~55%) FLY ASH POST-TENSION SLABS 20
PUMPING 2 75 25
GROUND & WATER + MS + WP 20
G18 ALL DRAINAGE MANHOLES SHALL BE EXECUTED WITH REINFORCED CONCRETE.. POST-TENSION WALLS - 25
CONC.BELOW VERY SEVERE : 40/25
G19 ALL SHUTTERING MATERIAL SHALL BE NEW AND UNUSED. 1 OPC+ (66%~80%) GGBS POST-TENSION BEAMS - 40
GROUND EXTERNAL IN CRANE C40/50 +MS + WP 0.04 PRECAST ELEMENTS
G20 ALL BLOCKWORK CONSTRUCTED AGAINST SHORING OR TO BE USED AS FORMWORK IN SUBSTRUCTURE SHALL BE DESIGNED AND DETAILED BY THE C INCLUDING CONTACT 20 1000 10 0.15 1.0 400 0.38 AS PER ACI 318-08 7.7.3
BASEMENT, OR
CONTRACTOR. THE CONTRACTOR SHALL PROVIDE DESIGNED TEMPORARY BRACING AND SUPPORT AGAINST LATERAL FORCES AND ALL CONSTRUCTION WITH GROUND & OPC+ (36%~55%) FLYASH
FOUNDATION, PUMPING 2 * CLEAR COVER SHALL NOT BE LESS THEN ONE BAR DIAMETER
LOADS ALL THROUGH THE CONSTRUCTION PROCESS. WATER + MS + WP
SLAB & DECK
G21 AT THE TIME OF TAKING OVER THE SITE AND PRIOR TO COMMENCEMENT OF CONSTRUCTION, THE CONTRACTOR SHALL SATISFY HIMSELF OF THE PUMP CHAMBER & C12 AGGREGATE FOR CONCRETE SHALL BE FROM APPROVED SOURCE AND SHALL COMPLYINGS: WITH THE SPECIFICATION REQUIREMENTS.
SHORING, EXCAVATION, DEWATERING AND PILING WORKS EXECUTED BY OTHERS WITH REGARD TO SETTING OUT, LEVELS, ALIGNMENT AND THE OTHER ELEMENTS VERY SEVERE : OPC+ (66%~80%) GGBS

WATERPROOFING ADMIXTURE
1

AS SPECIFIED TO BE ADDED
ADEQUACY OF THE DEWATERING SYSTEM. THE CONTRACTOR SHALL REPORT TO THE ENGINEER ANY DISCREPANCY OR, IN HIS OPINION, ANY DEFECT D IN CONTACT WITH C13 ALL CONCRETE SHALL BE COMPACTED USING ONLY MECHANICAL VIBRATION PROCESS, SELF COMPACTING CONCRETE SHALL BE APPROVED
EXTERNAL IN 20 CRANE C40/50 +MS + WP
WITHIN REASONABLE TIME SUCH THAT NO DELAY IS INCURRED ON THE PROGRAM OF WORKS CONSENTED BY THE ENGINEER. FAILING TO DO SO, THE THE GROUND & BY THE ENGINEER.
CONTACT OR 1000 10 0.15 1.0 0.04 400 0.36
CONTRACTOR WILL BE SOLELY RESPONSIBLE OF ANY DELAY. WATER C14 ALL CONCRETE SHALL BE CURED IN ACCORDANCE WITH THE SPECIFICATIONS FOR AT LEAST SEVEN CONSECUTIVE DAYS.
WITH GROUND PUMPING
INCLUDING OPC+ (36%~55%) FLY ASH
& WATER 2 C15 MINIMUM SIX NUMBERS OF CONCRETE CYLINDERS SHALL BE TAKEN FROM EACH DAY'S CONCRETING OR EACH 100 M³ CONCRETE AS DECIDED BY THE
G22 ANY STRUCTURAL REQUIREMENTS SPECIFIED BY RELEVANT AUTHORITIES F. E. DUBAI MUNICIPALITIES, JAFZA,ETC. WHICH ARE NOT COVERED IN RETAINING +MS + WP
NOTES AND SPECIFICATIONS ARE ASSUMED TO BE FULLY CONSIDERED BY THE CONTRACTOR. ENGINEER.CYLINDER TEST RESULTS MUST BE SUBMITTED TO THE ENGINEER IMMEDIATELY AFTER TESTING.
WALLS
SUPERSTRUCTURE MODERATE : 1 OPC+ (66%~80%) GGBS C16 CLEAN AND WASHED SAND TO BE USED FOR ALL CONCRETE WORKS AND SHALL HAVE DUBAI MUNICIPALITY APPROVED CERTIFICATE.
E CRANE C40/50
D DESIGN NOTES COLUMNS, WALLS,
TRANSFER BEAM &
INTERNAL
CONTROLLED
20
OR 2 OPC+ (36%~55%) FLY ASH
1000 10 0.15 1.0 0.04 400 0.38
C17 THE CONTRACTOR SHALL SUBMIT FOR APPROVAL THE CONCRETING PLAN SHOWING BAY NUMBERS AND THE SUCCESSION OF CONCRETING AT LEAST
D1 DESIGN AND CONSTRUCTION OF REINFORCED CONCRETE STRUCTURAL MEMBERS, STRUCTURAL STEEL MEMBERS AND THE STRUCTURE AS A WHOLE SHALL PEDESTALS PUMPING 3 OPC+ (36%~65%) GGBS TWO WEEKS IN ADVANCE OF THE CONCRETING DATE.
ENVIRONMENT
BE IN ACCORDANCE WITH UBC 1997, IBC 2006, ACI 318-08 AND BRITISH STANDARD.
1 OPC+ (66%~80%) GGBS C18 CONCRETE COVER BLOCK - MINIMUM CRUSHING STRENGTH 5 N/MM².
SUPERSTRUCTURE SEVERE : CRANE
D2 GRAVITY LOADS SHALL CONFORM TO ASCE 7-05, BASIC DESIGN CRITERIA AND LOCAL AUTHORITY REGULATIONS WHICH EVER IS MORE STRINGENT. F COLUMNS, WALLS, 20 C40/50 0.04
EXTERNAL OR 2 OPC+ (36%~55%) FLY ASH 1000 10 0.15 1.0 400 0.38 C19 BASEMENT WALLS SHALL BE CAST IN SECTIONS OF NOT MORE THAN 8.0 M LONG. SEQUENCE OF POURS SHALL BE PLANNED TO MINIMIZE THE EFFECTS
TRANSFER BEAM & EXPOSURE PUMPING OF CONCRETE SHRINKAGE TO THE APPROVAL OF THE ENGINEER. ALTERNATIVELY CONTROL JOINTS ACCORDING TO STANDARD DETAIL DRAWING CAN BE
D3 SUPER DEAD, PARTITION WALL, LIVE, MEP, FACADE, LANDSCAPING, TRAFFIC, FIRE TRUCK, OTHER LOADS:
PEDESTALS 3 OPC+ (36%~65%) GGBS EXECUTED AFTER APPROVAL OF THE ENGINEER.
- AREA REDUCTION FACTORS FOR BEAMS AND STOREY REDUCTION FACTORS FOR COLUMNS/WALLS SHALL BE TAKEN DESIGN AS PRESCRIBED BY IBC 2006. SUPERSTRUCTURE MODERATE : 1 OPC+ (66%~80%) GGBS
G C20 THE MAXIMUM SIZE OF A CONCRETE AREA TO BE POURED IN ONE STEP SHALL NOT EXCEED 1000 m². THE CONCRETE PORTIONS HAVE TO BE SEPARATED
- FIRE TRUCK AND TRUCK DRIVEWAYS AND PARKING/ STOPPING AREAS SEE ARCHITECTURAL, TRAFFIC AND CIVIL DEFENSE DRAWINGS. SLABS & BEAMS INTERNAL 20 PUMPING C40/50 0.04
2 OPC+ (36%~55%) FLY ASH 1000 10 0.15 1.0 400 0.38 BY CONSTRUCTION JOINTS. IN CASE THE CONTRACTOR PROPOSES CONCRETE PORTIONS BIGGER THAN 1000 M², THEN A DETAILED METHOD STATEMENT
- LANDSCAPE ARRANGEMENT SEE LANDSCAPING AND ARCHITECTURAL DRAWINGS. CONTROLLED
HAS TO BE SUBMITTED TO THE ENGINEER FOR APPROVAL.
- LOADING FROM LIFT ACCORDING TO MEP-REQUIREMENTS. ENVIRONMENT 3 OPC+ (36%~65%) GGBS

D4 SEISMIC LOAD PARAMETERS AS PER UBC 1997: 1 OPC+ (66%~80%) GGBS C21 HORIZONTAL CONSTRUCTION JOINTS SHALL NOT BE MADE IN BEAMS UNLESS SHOWN OR REVIEWED BY THE DESIGN CONSULTANT. VERTICAL
SUPERSTRUCTURE SEVERE : CONSTRUCTION JOINTS MAY BE MADE IN A LOCATION OF 1/3 (ONE THIRD) OF THE SPAN OF BEAMS OR SLABS HAVING NO POINT LOADS AT CENTER OF
H SLABS & BEAMS EXTERNAL 20 PUMPING C40/50 2 OPC+ (36%~55%) FLY ASH 1000 10 0.15 1.0 0.04 400 0.38
- ZONE - 2B EXPOSURE
SPAN, UNLESS OTHERWISE NOTED OR SHOWN OR DIRECTED BY THE DESIGN CONSULTANT.
TENDER
- SEISMIC ZONE FACTOR Z - 0.20 3 OPC+ (36%~65%) GGBS
C22 25X25 MM CHAMFERS TO CONCRETE CORNERS AND EDGES SHALL BE PROVIDED IN ACCORDANCE WITH SPECIFICATIONS AND AS DIRECTED BY THE
- SOIL PROFILE - SD
ABBREVIATIONS ENGINEER. FOR CLARITY, CHAMFERS ARE NOT SHOWN : REFER TO STANDARD DETAILS. PURPOSE OF ISSUE
- OCCUPANCY CATEGORY - 3
- DUCTLITY - R=4.5 OPC : ORDINARY PORTLAND CEMENT C23 CONTRACTOR SHALL SUBMIT DETAILS OF ALL ADDITIVES, PLASTICIZERS, MICRO SILICA, CURING COMPOUNDS, WATERPROOFING AGENTS ETC.
- SEISMIC COEFFICIENT - Ca=0.28 GGBS : GROUND GRANULATED BLAST FURNACE SLAG MAX.60% APPLICATION SHOULD FOLLOW STRICTLY THE MANUFACTURER'S RECOMMENDATION. IT IS CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT ALL
- SEISMIC COEFFICIENT - Cv=0.40 MS : MICRO SILICA MIM. 5% CONSTITUENTS OF CONCRETE ARE COMPATIBLE TO EACH OTHER.
SRC : SULPHADE RESISTING PORTLAND CEMENT
D5 FIRE RESISTANCE REQUIREMENT FOR THE STRUCTURE ARE: MSRPC : MODERATE SULPHADE RESISTING PORTLAND CEMENT C24 THE SUBSTRUCTURE ELEMENTS LIKE WATERTANKS, SERVICES PITS, LUBE PITS, DOCK LEVELER, ETC. SHOULD BE PROVIDED WITH 5% MICROSILICA IN
WP : WATERPROOFING ADMIXTURE CONCRETE. THE CONTRACTOR SHOULD SUBMIT A COMPATIBILITY CERTIFICATE FOR MICROSILICA AND CORROSION INHINITOR AS PER ITEM CP1. 00 TENDER SUBMISSION 26/08/2022
- LOAD BEARING WALLS AND COLUMNS - 3 HRS. CONCRETE GRADE: REV REVISION DETAILS DATE
- SHAFTS, STAIR AND RETAINING WALLS - 3 HRS. C25 THE JOINT FILLER TO BE COMPRESSIBLE, NON EXTRUDING, PREFORMED BITUMEN BONDED CORK JOINT FILLER BOARD. THE JOINT SEALANT TO BE MULTI-
- THE GRADE OF CONCRETE IS GIVEN ABOVE AS C ( fck,cyl ) / ( fck,cube ) WHERE
- FLOOR CONSTRUCTION INCLUDING BEAM - 2 HRS. COMPONENT, POLYSULPHIDE SEALANT ( GUN AND POURING GRADE ). ALL APPLICATIONS ARE TO BE CARRIED OUT STRICTLY IN ACCORDANCE WITH THE CLIENT:

- CORBELS,BEARINGS - 2 HRS. MANUFACTURER'S INSTRUCTIONS AND THE CONTRACT SPECIFICATIONS.


- ( fck,cyl ) IS THE CHARACTERISTIC COMPRESSIVE STRENGTH AT 28 DAYS OF 150 MM DIA x 300 MM HIGH CYLINDER.
D6 WIND LOAD PARAMETERS ACCORDING TO ASCE 7-05 ( FOR FACADE, ANTENNAS,...): C26 THE SLABS ON GRADE SHALL BE PROTECTED WITH 1 LAYER OF POLYTHENE SHEETS, MIN. GAUGE THICKNESS 1200 MICRONS, TO BE LAID UNDER
- ( fck,cube ) IS THE CHARACTERISTIC COMPRESSIVE STRENGTH AT 28 DAYS OF 150 MM CUBE. BLINDING PRIOR TO REINFORCEMENT ERECTION. THE ADJOINING SHEETS S SHALL BE LAPPED MIN. 50 MM AND SECURED WITH ADHESIVE TAPE TO CLIENT:

- DESIGN WIND SPEED (45 m/s) Vs = 101.0 mph (PEAK GUST VALUE) PREVENT DISPLACEMENT AFTER LAYING.
- NOTE 1 : FOR FURTHER RECOMMENDATIONS AND REGULATIONS REFER TO THE SOIL REPORT AND KC'S SPECIFICATIONS.
- EXPOSURE TYPE =C
C27 SLEEVES SHALL BE PROVIDED AT LOCATIONS INDICATED ON DRAWINGS OR AS DIRECTED BY THE ENGINEER, ADDITIONAL REINFORCEMENT SHALL BE
- IMPORTANCE FACTOR = 1.0
- NOTE 2 : WATERPROOF CONCRETE PROVIDED AROUND OPENINGS AS REQUIRED BY THE ENGINEER.
- GUST FACTOR G = 0.85 .... 1.06 ( TO BE DEFINED) CONSULTANT: BURO KLING
- DIRECTIONALITY FACTOR K = 1.00 33rd Floor C(C6-C8) I-Rise Tower,
- NOTE 3 : MINIMUM THICKNESS OF BLINDING CONCRETE : 75 MM U.N.O. Barsha Heights
- WINDWARD COEFFICIENT C = 0.80 E EXCAVATION AND DEWATERING P.O. Box 120082 Dubai, U.A.E.
Tel: +971 4 554 0035 /
- LEEWARD COEFFICIENT C = 0.50 Fax: +971 4 554 0034

- NOTE 4 : FOR EXTERIOR EXPOSED ELEMENTS CEMENT ASTM II: MSRPC TO BE USED. info@burokling.com /
www.burokling.com
PW E1 WATER TABLE IS -0.900M TO 1.000M DMD AS PER SOIL INVESTIGATION REPORT.BUT DUE TO SEASONAL VARIATION TO BE CONSIDERED +/-0.000M DMD. MAIN CONTRACTOR:
PL
SPECIFICATION FOR CONCRETE RESISTING CHEMICAL ATTACK ACCORDING TO SOIL INVESTIGATION REPORT OR KC`S SPECIFICATION (WHICHEVER IS MORE
E2 THE CONTRACTOR SHALL CHECK THAT THE DEWATERING CONTRACTOR MAINTAINS SURFACE DRAINAGE CHANNELS AND SUMPS AND SUMP PUMPS TO
D7 THE FOLLOWING EXPOSURE CONDITIONS WHICHEVER IS MORE STRINGENT SHALL BE USED FOR ALL DESIGN PURPOSES: STRINGENT)
PROTECT ALL EXCAVATIONS FROM FLOODING. FLOODING OF ANY EXCAVATION AFTER APPROVAL OF SUBGRADE WILL BE CAUSE FOR COMPLETE RE-
PREPARATION AND APPROVAL OF THE SUBGRADE. MEP CONSULTANT:
C3 THE CONTRACTOR SHALL SUBMIT DETAILED REINFORCEMENT DRAWINGS AND BAR BENDING SCHEDULES SHOWING BAR SIZES, SPACING, PLACEMENT
EXPOSURE CONDITIONS E3 THE CONTRACTOR SHALL CHECK THAT THE DEWATERING CONTRACTOR MAINTAINS POSITIVE PROTECTION (MAT/SHEET COVERING) FOR ALL EXCAVATED
AND SUPPORT DETAILS, DOWELS AT EXPANSION JOINTS AND LAPS ETC. FOR REVIEW AND ACCEPTANCE OF THE DESIGN CONSULTANT. WORK SHALL NOT
CIRIA GUIDE C577 SLOPES TO PROTECT SLOPES FROM INSTABILITY AN DETERIORATION DUE TO ENVIRONMENTAL CONDITIONS.
ACI 318-08 TABLE 4.3.1: COMMENCE UNTIL THE SHOP DRAWINGS ARE REVIEWED AND ACCEPTED. REVIEW OF SHOP DRAWINGS DOES NOT ALLEVIATE THE CONTRACTOR’S
TABLE 5.1:
SULFATE EXPOSURE RESPONSIBILITY TO COORDINATE THE INPUT OF ALL TRADES ON THE SHOP DRAWINGS. E4 THE CONTRACTOR SHALL CHECK THAT THE DEWATERING CONTRACTOR MAINTAINS CONTINUOUSLY SURVEY OF VERTICAL AND HORIZONTAL MOVEMENTS
EXPOSURE CONDITIONS PROJECT
OF THE TOP OF THE SOIL RETENTION SYSTEM. G+5TYP+R HOTEL APARTMENTS
INTERNAL BUILDING SURFACES GENERALLY - S0 a C4 REFER TO SPECIFICATIONS FOR QUALITY AND PERFORMANCE REQUIREMENTS OF CONCRETE.
EXTERNAL BUILDING SURFACES MODERATE (S1) b E5 THE CONTRACTOR SHALL CHECK THAT THE DEWATERING SHALL BE CARRIED OUT SUCH THAT THE WATER LEVEL IS MAINTAINED AT MINIMUM 500mm DUBAI POLICE OFFICER'S CLUB
C5 THE CONTRACTOR SHALL PERFORM AND SUBMIT FOR REVIEW INSTRUMENT SURVEYS OF FINISHED CONCRETE SLAB SURFACES BOTH BEFORE AND AFTER BELOW THE DEEPEST EXCAVATION LEVEL.
CONCRETE EXPOSED ABOVE GROUND MODERATE (S1) b PLOT NO. 3260580 - DUBAI , UAE
REMOVAL OF FORMWORK AND/OR SHORING SYSTEM TO VERIFY AS-BUILT TOLERANCES.
CONCRETE IN CONTACT WITH GROUND E6 THE CONTRACTOR SHALL CHECK THAT THE DEWATERING SYSTEM SHALL BE MAINTAINED UNTIL FOLLOWING CONSTRUCTION STAGES DRAWING TITLE
SEVERE (S2) d C6 REFER TO SPECIFICATIONS FOR REQUIREMENTS OF CONCRETE SURFACE FINISH AND CASTING TOLERANCE.
( DEWATERING SHALL NOT BE DISCOUNTINUED WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER ):
MARINE STRUCTURES SEVERE (S2) e A) STOP OF DEWATERING ONLY, AFTER PERIMETER WALLS AND WATERPROOFING ARE INSTALLED AND THE PERMANENT BUILDING DRAINAGE SYSTEM IS
GENERAL NOTES (SHEET 1 OF 3)
C7 PROVIDE UPWARD CAMBER TO SLABS AND BEAMS AS NOTED ON STRUCTURAL DRAWINGS AND/OR SPECIFICATIONS. CAMBER BOTH UNDERSIDE AND TOP
OF CONCRETE TO MAINTAIN THE SLAB AND BEAM DEPTH SHOWN ON THE DRAWINGS UNLESS NOTED OTHERWISE. FULLY OPERATIONAL;

8/26/2022 4:59:56 PM
WATER-RETAINING STRUCTURES MODERATE (S1) f
B) RETAIN DEWATERING AFTER UPLIFT APPROVAL OF THE ENGINEER.
C8 BEAMS, SLABS, COLUMNS, WALLS AND FOUNDATION ELEMENTS SHALL NOT BE SLEEVED OR BOXED-OUT OR HAVE THE REINFORCEMENT INTERRUPTED
E7 THE CONTRACTOR SHALL TAKE ADEQUATE CARE TO ENSURE THE CONTINUATION OF THE DEWATERING PROCESS UP TO THE COMPLETION OF ALL WORKS
EXCEPT AS INDICATED ON THE STRUCTURAL DRAWINGS. DRAWN: APPROVED YOD
UNDER THE WATER TABLE AND THE SUPERSTRUCTURE WORKS TO RESIST/ACCOUNT FOR ANY UPLIFTING TO THE SATISFACTION OF THE ENGINEER. SEL CHECKED: RAG
SCALE: 1 : 200 DATE: 26/08/22 PROJ. No:

DRAWING No. PAPER SIZE REV

S020 A1 00