Professional Documents
Culture Documents
Calibration Encoder
Calibration Encoder
07 calibration of encoder
IMPORTANT !!!
4 – DCM module
calibration of encoder
- after the card has rebooted it indicates with flashing of SF1 (“on”, “off”)
readiness for calibration operation
- in between the first 10 sec it needs 2 short 24 VDC pulses to its terminal 17
(DI 1.0) ATTENTION: if necessary first remove connected wires on terminal
17!!!
- for the pulses create a link with a short wire between terminal 9 and pulse two
times on terminal 17 SF1 is lit (calibration of all connected encoders active)
!!“parameter
application is
finished when SF1
starts flashing
again”!!
2 pulses
YOUR PROPULSION EXPERTS
CALIBRATION-ENCODER
- after the calibration is finished (indicated by the flashing SF1) uninstall the
module (following the first steps)
- switch off DILL switch “S3.8”
- reinstall the module, reconnect the terminal plugs (finish with terminal block
25-28)
- after reconnecting module is starting up and is ready for operation