Doc. No.

:-VMIPL/F/MAINT/02
Issue date -20-12-2020
UTILITY PM PLAN 2021-22 Rev. No./Rev Date:-01/11.11.2021

PM check sheet
S.NO. MACHINE NAME M/C NO. DURATION APR.21 MAY.21 JUN.21 JUL.21 AUG.21 SEP.21 OCT.21 NOV.21 DEC.21 JAN.22 FEB.22 MAR.22 REMARKS
attachment

1 DG SET UT/DG-01

Plant shutdown Due to


Covid-19
2 AIR COMPRESSOR UT/COMP-01

3 COOLING TOWER UT/CL-01 VC

4 RO PLANT
VC
UT/RO-01

Plant shutdown Due to


Covid-19

5 STRAPPING MACHINE-1 UT/STAP-01 VC

Plant shutdown Due to


Covid-19

6 STRAPPING MACHINE-2 UT/STAP-02 VC

7 WRAPPING MACHINE-1
VC
UT/WRAP-01

8
VC
WRAPPING MACHINE-2 UT/WRAP02

9 STRAPPING MACHINE-3 UT/STAP-03

10 WRAPPING MACHINE-2 UT/WRAP03

11 EOT CRANE 10 T UT/ER-01

12 EOT CRANE 5T UT/ER-02

13 EOT CRANE 2T UT/ER-03

14 EOT CRANE 2T UT/ER-04 QUATERLY

15 STACKER UT/STK-01

16 LT PANEL UT/LT-01

17 HAND PALLET LIFTER -1 UT/HPL-01

18 HAND PALLET LIFTER -2 UT/HPL-02

19 HAND PALLET LIFTER -3 UT/HPL-03

20 MOP MACHINE UT/MM-01

TOOL ROOM APR.21 MAY.21 JUN.21 JUL.21 AUG.21 SEP.21 OCT.21 NOV.21 DEC.21 JAN.22 FEB.22 MAR.22 REMARKS

20 EDM TR/EDM-02

21 LATHE TR/EDM-03
22 MILLING MACHINE TR/EDM-04

23 MANUAL SURFACE GRIDER TR/EDM-05

24 RADIAL DRILL MACHINE TR/EDM-06

Note:- PM Frequency quaterly.

LEGENDS:- PLAN ACTUAL POSTPONE VC

Rev. No:- Rev. Date:- Rev. Details:-

1 11.11.2021 Utility & tool room plan PM plan merge.

Prepared By:- Approved By:-