Number : RM
Project Number :
Building Number :
List of Drawings Construction & Facilities Management Depatrment
PREPARED BY:
185.35 2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.
3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.
THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.
15.91 10.00
PERIMETER LINE
2.00
7.15 24.00 7.50 2.35
KEY PLAN:
2.15
173.65
3.80
P ORTAB LE A CCOMM ODATI ON
14.00
3.00
WASTE
DUMPING 12
20.05
19.00
AREA
P ORTAB LE ME SHA LL
3.80
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON
TRUE NORTH
3.00
34.48
185.35
3.80
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK
45.65
2.00
7.00 4.00
19 17
S ept ic T ank
7.50
TO ILET AND BATH
22
14.00
10
52.25
2.00
23 8.65
3.80
ENTRANCE /
EXIT GATE
MUD
3.00
6.00
S ETT LING
TANK #02
11.60
3.80
LEGEND:
PLANT #02
P ORTAB LE A CCOMM ODATI ON
13
8.00
BATCH
1. MAIN GATE (ENTRANCE / EXIT GATE)
3.00
4.50
2. PERIMETER STEEL F ENCE
3.80
8.00
S weet Wat er Tank
3.80
BATCH
ADMI XTURE TANK 5. WASTE DUMPING AREA
CABIN
6. WEIGHBRIDGE
33.68
7. SEPTIC TANK (8M x 3M)
LINE
8. BATCH PLANT #01 – KICE PLANT
AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
18 DIESEL TANK
- BATCH PLANT FOUNDATION AND STRUCTURES
16 9
GENERATOR #0 1
26.00
DIESEL TANK
15.58
GENERATOR #0 2
PERIMETER
GENERATOR #0 3 - MUD SETTLING TANK #01
12.00 14.49
63.00
EDS
GROUND
HOOP ER
ROOM
9. CONTROL SERVICE AREA #01 & #02
GENERATOR #0 4
- EDS ROOM, GENERATOR 4-UNITS, ICE PLANT KTI, DIESEL TANKS 2-UNITS
21
6.00
14.50 5.00
GROUND
BATCH PLANT #03
HOOP ER
7.00
- CHIL LER PLANTS, WATER TANKS 4-UNIT S
PERIMETER
114.48
10. BATCH PLANT #02 – SIMEM PLANT
FOR FUTURE
- BATCH PLANT FOUNDATION AND STRUCTURES
5.45
9.00
WATE R TANK
- SILO FOUNDATION AND ST RUCTURES 3-300T AND 2-150T
BATCH
CABIN
173.65
173.65
GROUND
HOOP ER
28.50
CH ILLER P LANT
14
- ADMIXT URE T ANK #02
22
27.63
12. TRUCK WASHING AND DUMPING AREA
COMPACTED SOIL 300 T
13. AGGREGATE WASHING PL ANT
24.61
300 T WATE R TANK
9
WA TER TA NK 15. WORK SHOP BUILDING
16. SWEET WATER TANK
S ETT LING
TANK #01
MUD
WA TER TA NK 17. TOILET PORTABLE
BATCH
CABIN
18. PORTABLE ACCOMMODATION
PLANT #01
19. SEPT IC TANK
8
BATCH
20. EQUIPMENT DIESEL TANK
21. SLAB ON GRADE
8.00
22. COMPACTED SOIL
23. COMPACTED GRAVEL
121.30
A DM IX TURE TA NK
300 T 300 T
3.00 20.00
S ILO FOUNDATIO N
DOCUMENT DISCLAIMER:
8.00
EQUIPMENT PARKING AREA
12
11
10
WEIGHBRIDGE
30.00
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
23 6
22.12
65.00
20
R E V I S I O N S
15 7 4 COMPACTED GRAVEL
5
WORKSHOP BUILDING
DIESEL FILLING AREA
VEHICLE PARKING
3
DIESEL TANK
15.00
WA STE
15.00
DUMP ING
Gu ar d
3.00
Hou se
DRAWING T ITL E:
MAZ
RM__-AD-SDP-01 01 Chief O pera tions Office r
DATE:
See Detail “A”
Vehicular Gate
MAIN GATE
3.00 3.00 3.00 3.00 8.00 3.00 3.00 3.00 3.00
1.35
See Detail B 0.05mm thick
Tension Wire with 3.00 White Color
G.I Pipe 2" dia.
Turn Buckle Main Gate
G.I Pipe 2" dia. With 3.00 mtr. total length
Horizontal brace Double door
2.70
2.70
Square Tube 100x50
SEE DETAIL – “X” Steel Frame
1.35
0.05
CORRUGATED SHEET COVER
NGL
G.I Pipe 2" dia.
ELEVATION VIEW SCALE 1 : 100 MTS
0.15
0.10
0.50
Horizontal brace SCALE 1 : 100 MTS
1.52
4-12mm dia. rebar dowel
G.I Pipe 2" dia. Full welded to GI pipe
With 3.00 mtr. total length
G.I Pipe 4" dia. / Square Tube
Plain Concrete
With 3.20 mtr. total length
Tension Wire with Turn Buckle 30x30x50cm 0.30
+ 8.95
- 4.00 m
(verify the actual length at site)
G.I. 2" dia. Or Square Tube DETAIL - X
Horizontal Bracing NOT TO SCALE
Fence Wire
1.35
2.50m
6.07
Tensioner wire
1.35
RC Concrete
NGL 100x100x80cm
Eng ineerin g Division
NGL NGL
0.15
0.50
1.52
0.30
Full welded to GI pipe
0.10
NEW RAZ AL KHAIR
5500
300T 300T
150T
B
3000
500
638
2630
2250
2130
1612
5260
CL BATCH PLANT FOUNDATION LOADING AREA
(SEE ATTACHED DETAILS)
A A
1612
2130
2250
2630
638
500
5121 750
250 250
2450 3171 250
(BY SRMCC)
150
150
SLAB ON GRADE LOADING AREA SLAB ON GRADE
1000
400
250
500
COMPACTED BACKFILL
SECTION THTU - A
PROJECT TITLE
Engineering Division
500 500
SL AB ON GRAD E EL SL AB ON GRAD E EL
2000
1000
+ 0. 15 + 0. 15
DRAWING TITLE LOCATION
RAMP CL BATCH PLANT FOUNDATION #01 RM
NEW RAZ ALKHAIR
4000
2750 2750
1140
4000
85
COMPACTED BACKFILL
Base Plate 500x500x25mm thk.
150
2750
H-Beam 250x250mm HEB
500 500
500
1000
330
SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15
1610
Hole 33mm dia.
Anchor bolt 30mm dia. x 800mm long
300T
85
1610
8485
PLAN
SECTION THTU - C E E
4735
10235
1515
130
TOP SILO FOUN DATION
FINISHED EL +0.65M
1610
13485
300T
1000
GROUND HOOPER FOUNDATION
Anchor bolt 30mm dia.
1610
x 800mm long
700
1000MM THICK WITH 16MM DIA. BARS
SPACE AT 150MM O.C BOTH WAYS
BASE PLATE 50X50X25MM THICK
CONCRETE BLINDING 100MM THICK WITH HILTI ANCHOR BOLT
1140
GROUND HOOPER RAMP
(BY SRMCC)
WITH 2-LAYER 10MM DIA. BARS
SPACE AT 150MM O.C BOTH WAYS
5000
3000 4000 COMPACTED BACKFILL
2000 1000
150T
300
3250
150
500 500
1000
SECTION
500 500
PROJECT TITLE
1000
RM
150
100
DRAWN BY : ASD
CHECKED BY : REVISION :
DATE : 03.FEB.2020 SCALE: As Shown
CONTENTS
PLAN & SECTION & DETAILS
DRAWING NO. SHEET NO. PAGE NO. APPROVED BY
BPF-ST 1 OF 1 04 Operations Director
40 00
20000
12 000 40 00
NOTES:
1) Height of Plant and Ground
SILO FOUNDATION Hopper Foundation must be
4000
150/200T 200mm above Floor Level.
200
2) Height of Silos Foundation
8200
must be 400mm above Floor Level.
C B SILO
SILO
8550
4000
2810 FOUNDATION
FOUNDATION
150/200T
150/200T 14 05 14 05
430
430
2135
CONCRETE PARAPE T WALL
CL LOADING AREA 0.25M THICK AND 1.0 METE R HEIG HT
4270
5130
3410
2135
LOA DING P OINT
430
(WET B ATCH)
4300
WATER TRENCH 0.2 5M WIDTH
SLO PE GOING TO MUD SETTL ING TA NK
430
(SE E A TTACHED DETAIL S)
300
CL
LOADING AREA
5130
LOA DING P OINT
(DRY B ATCH)
8600
2700
13 50 13 50
375
25250
42450
MUD SETTLING TANK
375
26 50
13 25 13 25
10500
A
7550
2400
12 00 12 00
4600
325
D 23 00 23 00
1 860
325
1300
1350
1200
2600
2400
2700
CL CL CL
1200
1300
1350
17200
32 5 32 5
37 5 37 5
RAMP
8650
8650
1000
1000
8 00
2 86
4 00
177
0
7 75
F.L.
160
F.L.
0040
135
886
400
60 0
177
SECTION THRU -A
Slab on grade 300mm Thick
With 2-Layer 12mm dia. bars SECTION THRU -C
spaced @ 250mm O.C.
RC Parapet wall with 14mm dia.
250 Ø 14 mm Rebars@ 150 mm spacing Bars spaced @ 150mm O.C.
Both Ways( 2 Layers)
00 0
12661
61
8 00
26
88 0
6
886
20 0
20
F.L.
00
610
1061
1100
00
21
8 00
877
177
SECTION THRU -B
88 0
20 6
RM
BP#02 SIMEM PLANT LAYOUT
2 00
6 00
6
177
2500 1500
600
150
SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15
200
600
400
SECTION THTU - E
0.79 0.79
27.63
13.44 6.00 8.18 2.30 1.60 2.30 1.60 2.30 1.60 2.30
0.50 0.50 0.65
0.20 3.50 3.50 3.50 2.20 5.00 1.37 3.00 3.50 0.20 B
Gen. Set #1
Gen. Set #2
Gen. Set #3
Gen. Set #4
5.37
5.74
7.33
7.37
Cold Water Tank 02
0.30
A
Chiller Plant
1.70
14.00
14.50
2.07
5.00
Diesel Tank
Diesel Tank
Ice Plant
EDS
VERIFY
ROOM
3.00
7.13
2.17
2.07
C
5.60
5.00 1.80 8.78
0.30
15.58
Scale 1: 200 m
NOTES:
1) All backfill materials must be compacted PROJECT TITLE
not less than 95% density or approved by client.
2) Two coats of epoxy bituminous coating material RM
shall be applied to the external surface of concrete
contacting soil, excluding bottom surfaces and surfaces NEW RAZ AL KHAIR
of leveling. (Blinding) Engineeri ng Division
3) All bottom surfaces of concrete cast against and DRAW ING TITLE LOCATIO N
permanently in contact with ground shall be under laid by CONTROL SERVICE FOUNDATION KS A
polyethylene sheets (Vapour Barrier) as indicate on drawings.
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS
0.60
0.05
0. 05
0.20
F. F. L. E lev. +0.15
0.20
0.15
0.15
Not To Scale
EL. 0.20m
20cm
Concrete Ped estal Base EL. 0.00
60cm
DIESEL TANK
Parapet wall blocks 20,000 LTS
plastered both sides DIESEL TANK
10cm
0.60
1.00
Elev. + 0.20
F. G. L.Elev. 0.00
ELECTRICAL TRENCH DETAIL
SCALE
0.20
2.07 3.00
VERIFY 2.07 N.T.S.
SECTION “C”
Not To Sca le
PROJECT TITLE
RM
NEW RAZ AL KHAIR
Engineeri ng Division
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS
2.00 2.00
Lifting Eye for Anchor
0.10
Sandwich Wall Panel with Insulation 50mm thick
1.20
Rectangular Tube 100mm x 50mm
3.40
3.20
1.00
Hollow Steel Door 1.80m x 2.40m
2.48
1.00
0.10
SECTION THRU “B”
SCALE 1 : 100 m
I-Beam 140mm x 73 mm
4.00
A/C Unit 1.5 Tons
Steel Column I-Beam 140mm x 73 mm
PERSPECTIVE VIEW
2.00 2.00
Lifting Eye for Anchor
SCALE N. T. S.
1.20
3.20
3.30
1.00
4.00 4.00
Steel Plate 200mm x
2.00 2.00
200mm x 16mm thk. With
4-16mmØ Hilti Anchor
1.00
1.20 0.50
0.50 0.70
0.50mm thk. Corrugated
A
0.10
A/C Sheet with Roof Insulation
and Chicken Wire
0.70
SCALE 1 : 100 m
4.00
Open Trench for Wires
4.00
Open Trench for Wires
Rectangular Pipe
I-Beam 140mm x 73 mm
Floor Joist
2.00
B Engineeri ng Division
DRAW ING TITLE LOCATIO N
Hollow Steel Door 1.80m x 2.40m Opening EDS ROOM PORTABLE RM
NEW RAZ ALKHAIR
4.00 4.00
0.66
A 20cm thk. Concrete slab with
Square Tube 10cm x 10cm
10mmØ bar spaced @ 150mm O. C.
0.66
2.00
8.00 Steel Truss
Steel Plate ( 15 cm x 15 cm)
Concrete foundation 0.20 3.80 3.80 0.20
SL OPE
80cmx20cm thk. Roofing Line
0.66
Blocks wall parapet
0.20
0.66
Silo Foundation side
SL OPE
Rectangular Tube ( 8cm x 4 cm )
0.66
2.00
4.00
0.66
20cmx 20cm Steel Plate ( 15 cm x 15 cm)
0.20
A
3.00
Square Tube ( 4 cm x 8 cm) Angle Bar (4 cm x 4 cm) 4-12Ø Vertical bars w/ 8Ø ties
1.00
SEE DETAIL – A1
Steel Truss Stiffeners
DETAIL – A1
PROJECT TITLE
3.00
1.05
0.50
0.30 F.F.L. F.F.L.
N.G.L.
0.25
N.G.L.
2.00m.
0.30
1.20
12mm dia. Vertical bars
0.95
@ 150mm spacing
0.30
1.70
Water Passage A Plain concrete blinding 200mm thk. Concrete slab With10mm dia. @
150mm Spacing bothways (2 Layers)
SECTION THRU - A
5.80m.
B 0.30
0.30
0.50
0.25
F.F.L. F.F.L.
PLAN N.G.L. N.G.L.
2.00m.
Ramp
1.20
SCALE 1: 75 MTS
0.95
0.30
SECTION THRU - B
SCALE 1:75 MTS
Engineeri ng Division
DRAW ING TITLE LOCATIO N
MUD SETTLING TANK LAYOUT RM NEW RAZ
AL KHAIR
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 75
CONTENTS
PLAN, SECTION A & SECTION B
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
MST-ST-01 1 OF 1 12
Ope rations Director
Water T rench
62.94
0.15 0.15
0.20
2.66 2.56 2.56 2.66 2.66 2.56 2. 56 2.66 2. 66 2. 56 2.56 2. 66 2.66 2.56 2.56 2.66 2.66 2.56 2.56 2.66 2.66 2.56 2.56 2.66
2.56
Drain Pipe
A B
2.56
10.59
D
2. 56
C
2.56
0.15
FLOOR PLAN
62.94
10.44 10. 44 10.44 10.44 10.44 10.44
0.95
0.95
5.12
0.95
0.95
0.95
10. 24
10.45
0.95
0.95
0.95
5.12
0.95
0.95
0.95
Roofing Line Z - Purlins 200 x 100 12 mm Ø Sag Rod( Plain Bars) H - Beam Column200 x 200 I - Beam Rafter200 x 100
45 110 45
10.59
45
0.50mm thk. Corrugated
Z-PURLINS Spaced @ 1.0 m O.C. I - Beam Rafter 200 x100
Sheet Color W hite
200
110
0.50mm th k. Co rrugated Sh eet
45
5.70
Colo r White on steel framing
100
4.00
H-Beam 200 x 200
1.00
WATER
TRENCH
Slope F.L.
G.L.
400
TYPICAL SIDE VIEW
SCALE 1:100 M
SECTION THRU - X
I-Beam 200 x 200mm
Precast Concrete160 x 2500mm
10mmØ Bars
0.30
0.30
20cm
50mm thk. blinding
EL. 0.00
60cm
Eng ineerin g Division
SECTION THRU - A SECTION THRU - B DRA WING TITLE LOCATION
NOT TO SCALE NOT TO SCALE RM NEW
AGGREGATE STOCKBAY LAYOUT
RAZ AL KHAIR
10cm
ASB - 03 2 OF 3 14
Ope rations Director
PRECAST PANELS
2500
1250 1250
160
PRECAST PANEL PLAN
SCALE: 1:20
1250 1250
350
350
1000
950
1000
650
650
50
ASB - 03 1 OF 3 15
A
10.00
16.20
2.75
EL. 0.00 0.30 9.40 0.30
6.00
Retaining Wall 300mm thick with 12mmØ Bars
Ver. & Hor. spaced @ 200mm O.C. Both ways
EL. 0.00
EL. +0.15
9.40
9.70
0.30 0.30
14.00
14.00
Water Passage
B B
3.00
Water Passage
EL. 0.00 C C N.G.L. EL 0.00
4.00
0.30
0.30
Compacted Soil
Concrete Blinding
0.30
1.00
0.55
0.60
EL. 0.20m
EL +0.15 EL +0.15
20cm
EL 0.00
Water Water Water
Passage Passage Passage
EL. 0.00
60cm
0.30
Compacted Soil
2.50
Compacted Soil
10cm
Compacted Soil
Concrete Blinding
0.40
0.60
Engineering Division
2.50
1.60
Beam Beam
1.50 1.50
4-14mm dia. main rebar
0.40
0.89
2-12mm dia.
1.40
1.40
With 8mm dia. stirrups @ 200mm pacing
Beam
3.50m.
3.10
Beam
Beam 0.40 0.60 0.40
Beam
Beam
0.20
RC Column
See detail
0.40
PLAN
SCALE 1 : 50 MTS RC Beam 4-14mm dia. main rebar
0.20
0.55
See detail 2-12mm dia.
8mm dia. ties @ 200mm spacing
COLUMN DETAIL
NTS
60x60cm Manhole cover 20cm thk. RC slab 60x60cm Manhole cover
With 12mm dia. rebar @ 200mm
0.20
FFL FFL
0.30
0.35
1.00
1.90
1.00
C
5.00
1.00
4.80
1.00
I - Beam Rafter 200 x 100
1.00
1.00
1.00
10.00
15.00
5.00
1.00
5.00
Roofing Line
1.00
See Detail A1
Concrete Column
1.00
1.00
1.00
4.80
1.00
5.00
1.00
2.80
1.00
2.10 Z - Purlins 200 x 100 12mm Ø Sag Rod (Plain Bars)
2.0 0
Angle Bar 50 x 50
With 12-16mm d ia. Vertical Bars
0.55
Rail For Moving Plot F orm
Grade Beam B
3.0 0
300 X 200 (SEE DETAIL)
Service L ight
1.50
0.40
Finish Floor Slab
0.55
0. 50 H - Beam C olumn 200 x 200
1.00
1.2 0
0.50
0.2 0
Fo oting Be am 0.50 x 1.50 x 1.50
Fo oting Bea m
Lean C oncrete 1.00
C
0.20 0.20
1.40
DETAIL THRU A1
SECTION THRU - A
0.20
6 – 16mm Ø bars
Horizontal Bars
0.30
10 mmØ bars Stirrups
@ 150mm O.C. Spacing
12 - 16mm Ø Vertical Ba rs
2.0 0
Lean C oncrete
Lean C oncrete
Eng ineerin g Division
14-16mmØ Main Bars DRA WING TITLE LOCATION
14-16mmØ Main Bars
WORKSHOP BUILDING LAYOUT RM NEW
10mmØ Dow el Bars
10mmØ Dow el Bars RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
SECTION THRU - B SECTION THRU - C CONTE NTS
SECTION AND DETAILS
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
WSB - 02 1 OF 2 19
Ope rations Director
20.00
6.75 6.50 6.75
GB GB GB
FT/CL FT/CL FT/CL FT/CL Z - Purlins 200 x 100 Corrugated Roof Sheet
I - Beam Rafter 200 x 100
5.00
GB
GB
GB
GB
5.00
200 x 200
7. 50
7.0 0
Concrete Column
GB
GB
15.00
5.00
GB
GB
400mm
Concrete Hollow Blocks
200mm Thickness
2. 00
FFL
5.00
GB
GB
GB
GB
FOUNDATION PLAN
1.75
AGGREGATE STOCKBAY
1.75
4 3 2 1
10.00
To b e
Ver ify
1.00 1.50 1.50
1.20
3.00
CL
4.00
B
RC Conveyor Fo undation with 12mmØ bars spa ce d RC Conveyor Fo undation with 12mmØ bars spa ce d
@ 150 mm O.C. both ways (2 layers) @ 150 mm O.C. both ways (2 layers)
0.10 0.10
0.10 0.10
0.20
Compacte d S oil
0.20
Compacte d S oil
0.40
0.40
Engineering Division
DRAWING TITLE LOCATION
AGGREGATE WASHING PLANT RAZ AL KHAIR
1.50
RC FOUNDATION 10mmØ Bars 2-layer spaced
@ 200mm O.C. Both Ways
0.10
A
0.70
Slab on Grade Elevation Slab on Grade Elevation
4.00
4.00
0.15
0.60
0.35
NOTE: TO BE CONCRETED AFTER
ISTALLATION OF WEIGHBRIDGE STRUCTURE
0.10
4.00 1.00 5.95 5.95 5.95 1.00 4.00
0.45
0.45
0.60
0.60
0.60
0.15
0.35
SECTION THRU-A
Engineering Division
WB-ST-01 1 OF 1 22
Operations Director
0.30
0.20
0.30 F.F.L. F.F.L.
N.G.L. N.G.L.
1.30
0.30
0.80
12mm dia. Vertical bars
@ 150mm spacing
0.30
1.00
SECTION THRU - A
4.30
B 0.30
0.20
F.F.L. F.F.L.
PLAN N.G.L.
Ramp
N.G.L.
1.30
SCALE 1: 75 MTS
0.80
0.30
SECTION THRU - B
SCALE 1:75 MTS Engineeri ng Division
DRAW ING TITLE LOCATIO N
RM
CONCRETE WASTE TANK
NEW RAZ AL KHAIR
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.JUN.19 SCALE: 1 : 75
CONTENTS
PLAN, SECTION A & SECTION B
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
CWT-ST-01 1 OF 1 23
Ope rations Director
Concrete Ped estal Base
5.00
DIESEL TANK
Parapet wall blocks plas tered both sides 20,000 LTS
DIESEL TANK
0.60
1.00
Diesel Tank
7.50
Elev. + 0.20
F. G. L.Elev. 0.00
0.20
2.50 3.00
VERIFY 2.50
A
SECTION “A”
Not To Sca le
DIESEL FILLING AREA PLAN
Not To Sca le
PROJECT TITLE
RM
NEW RAZ AL KHAIR
Engineeri ng Division
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.2 0 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
DFA-ST-01 1 OF 1 24
Ope rations Director
24.00
1.00
1.00
AC AC AC AC AC
EF W1
CONC.
1.50
CURING TANK CURING TANK PAD
2.50
CURING TANK
TOILET
4.00
4.00
PORTABLE LABORATORY ROOM B
1.00
PORTABLE CURING ROOM W1
TESTING AREA
B D1 B
SHADED
1.50
CURING TANK CURING TANK
D1
W1 W1 D1 W1 W1 D1
1.00
1.00
A
24.00 4.00
RECTAGULAR TUBE 100X50MM
0.30 0.30
2.00 1.50 2.50 1.50 2.50 1.00 0.70 2.50 1.50 2.50 1.50 1.00 SQUARE TUBE 100MM
2.33
0.20
3.53
2.10
1.20
1.00
1.00
CONCRETE RE TA INING WA LL
CURING TANK I NSI DE P ORTA BLE
F. F.L.
RAM P FI NIS HE D S LAB O N GRA DE
0.20
0.20
0.20
ELEVATION TRHU-A
4.00
ALLUMINUM SLIDING WINDOW
1.00 1.00 1.00 1.00
3.40
CONTE NTS
PLAN AND SECTION
ELEVATION TRHU-B
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
LCR-ST-01 1 OF 2 25
Ope rations Director
ROOF SHEET 0.50MM THICK
FIRE RATED WALL WITH ROOF INSULATIONAND CHICKEN WIREMESH
0.53
RAFTER IPE 120X64
CEIL INGHEIGHT ELEVATION
3.53
3.40
3.00
CONCRETE
1.00
RET AI NING WALL
CURING TANK
F. F.L.
FI NIS HE D S LAB O N GRA DE
0.20
SECTION TRHU-A
24.00 4.00
RECTAGULAR TUBE 100X50MM
CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION
0.70
2.53
3.53
1.30
2.10
1.00
1.00
CONCRETE RE TA INING WA LL
CURING TANK
F. F.L.
RAM P FI NIS HE D S LAB O N GRA DE
0.20
0.20
SECTION TRHU-B
CONTE NTS
PLAN AND SECTION
LCR-ST-02 2 OF 2
26
Ope rations Director
Steel Rafter
IPE 200x100
Steel Column
1.00
HEB 200x200 Portable Cabin
Fire Rated
AC
DRIVERS ROOM
3.00m.
Fixed Window on
UP
Aluminum Frame
Aluminum Flash Door
1.50m x 1.0m
2.10m x 1.0m
D
Sandwich Wall Panel with
1 Insulation 75mm thick Fire
Rated On Steel Framing
Stair structure as per
3.00
1.00
actual positioning
4.10m.
A
1.00
GROUND FLOOR PLAN
SCALE 1:50 MTS F.F.L.
N.G.L.
0.15
1.30m. 1.50m. 1.30m.
4.10m.
D
DN
1 ELEVATION THRU - A
SCALE 1:50 MTS
AC
3.00m.
2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.
3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.
185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .
THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.
KEY PLAN:
173.65
P ORTAB LE A CCOMM ODATI ON
WASTE
DUMPING
AREA
P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON
TRUE NORTH
185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK
S ept ic T ank
TO ILET AND BATH
ENTRANCE /
EXIT GATE
MUD
10.70
PLANT #02
P ORTAB LE A CCOMM ODATI ON
BATCH
MH12 E
P ORTAB LE A CCOMM ODATI ON
BATCH
CABIN
MH2
AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
FOR MSB2 GENERATOR #0 1
DIESEL TANK
MH1 GENERATOR #0 3
EDS
GROUND
MH14 MH13
HOOP ER
ROOM
17.50
2 Sets – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC
GROUND
BATCH PLANT #03
HOOP ER
FOR FUTURE
CHILLED WAT ER TANK
FOR ICE PLANT
2 Sets – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC
BATCH
CABIN
FOR ACCOMMODATION MP4 FOR CHILLER PLANT
173.65
173.65
GROUND
HOOP ER
2 Sets – 4 x 120mm² CU/XLPE/SWA/PVC MH3 E CH ILLER P LANT
22.00
FOR BP1 Batch Control Panel
1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC 300 T
300 T RAW WATER TANK
S ETT LING
TANK #01
1 Set – 3 x 70mm² + 35mm² CU/XLPE/SWA/PVC 27.00
MUD
CHILLED WAT ER TANK
FOR MSB1 BATCH
CABIN
MH5
1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC
PLANT #01
MH4
BATCH
MSB1E
1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC
1 Set – 4 x 16mm² CU/XLPE/SWA/PVC A DM IX TURE TA NK
32.75
S ILO FOUNDATIO N
E CB1
DOCUMENT DISCLAIMER:
12
11
10
WEIGHBRIDGE
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
REVISION NO.: REVISED BY.: REVISION DATE:
MH6 R E V I S I O N S
WORKSHOP BUILDING
DIESEL FILLING AREA
28.70
VEHICLE PARKING
DIESEL TANK
WA STE
DUMP ING
E E E Gu ar d
MP7 MP6 Hou se
DRAWING T ITL E:
FOR WORKSHOP CONST RUC TION & F AC ILITIES MANAGEMENT DEPART MENT
1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC 1 Set – 3 x 25mm² + 16mm² CU/XLPE/SWA/PVC
ARCHITECTURAL & INTERIOR DESIGN WORKS:
FOR OFFICE & LABORATORY CAD BY : DAT E:
1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019
MAZ
RM__-AD-SDP-01 35 Chief O pera tions Office r
DATE:
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.
2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.
3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.
185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .
THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.
KEY PLAN:
173.65
P ORTAB LE A CCOMM ODATI ON
WASTE
DUMPING
AREA
P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON
TRUE NORTH
185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK
S ept ic T ank
TO ILET AND BATH
ENTRANCE /
EXIT GATE
MUD
10.70
PLANT #02
P ORTAB LE A CCOMM ODATI ON
BATCH
MH12
P ORTAB LE A CCOMM ODATI ON
AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
2 Sets – 4"Ø SCH40 PVC Conduit DIESEL TANK
MH1 GENERATOR #0 3
EDS
GROUND
MH14 MH13
HOOP ER
ROOM
17.50
GROUND
BATCH PLANT #03
HOOP ER
1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING)
FOR FUTURE
CHILLE D WA TER
TA NK
BATCH
CABIN
1 Set – 4"Ø SCH40 PVC Conduit MP4
173.65
173.65
GROUND
HOOP ER
MH3 CH ILLER P LANT
22.00
300 T
300 T RAW WA TER TANK
FOR BP1
1 Set – 6"Ø SCH40 PVC Conduit RAW WA TER TANK
S ETT LING
TANK #01
MP1 27.00
MUD
1 Set – 2"Ø SCH40 PVC Conduit(NETWORKING) BATCH
CHILLE D WA TER
TA NK
CABIN
MH5
PLANT #01
MH4
BATCH
MSB1
A DM IX TURE TA NK 1 Set – 6"Ø SCH40 PVC Conduit
300 T 300 T 1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING)
32.75
S ILO FOUNDATIO N
CB1
DOCUMENT DISCLAIMER:
12
11
10
1 Set – 6"Ø SCH40 PVC Conduit
WEIGHBRIDGE
10.80 9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING) REVISION NO.: REVISED BY.: REVISION DATE:
MH6 R E V I S I O N S
1 Set – 4" SCH40 PVC Conduit
1 Set – 2" SCH40 PVC Conduit (NETWORKING)
1 Set – 2" SCH40 PVC Conduit (NETWORKING)
WORKSHOP BUILDING
DIESEL FILLING AREA
28.70
VEHICLE PARKING
DIESEL TANK
WA STE
DUMP ING
MP7 MP6 Gu ar d
Hou se
DRAWING T ITL E:
1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING) DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019
MAZ
RM__-AD-SDP-01 36 Chief O pera tions Office r
DATE:
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.
2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.
3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.
185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .
THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.
KEY PLAN:
173.65
P ORTAB LE A CCOMM ODATI ON
WASTE
DUMPING
AREA
P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON
TRUE NORTH
185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK
S ept ic T ank
TO ILET AND BATH
1-2" Ø GI Pipe
TOATAL AREA = (+/-) 32,186 M2
ENTRANCE /
EXIT GATE
MUD
S ETT LING
TANK #02 1-3" Ø GI Pipe
PLANT #02
P ORTAB LE A CCOMM ODATI ON
BATCH
P ORTAB LE A CCOMM ODATI ON
1-2" Ø GI Pipe
1-4" Ø GI Pipe
S weet Wat er Tank
AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
DIESEL TANK
GENERATOR #0 1
DIESEL TANK
GENERATOR #0 2
1-3" Ø GI Pipe
GENERATOR #0 3
EDS
GROUND
HOOP ER
ROOM
GENERATOR #0 4
GROUND
BATCH PLANT #03
HOOP ER
1-2" Ø GI Pipe
FOR FUTURE
1-4" Ø GI Pipe CHILLE D WA TER
TA NK
1-3" Ø GI Pipe
BATCH
CABIN
173.65
173.65
GROUND
HOOP ER
1-6" Ø PVC Pipe CH ILLER P LANT
1-6" Ø PVC Pipe
1-3" Ø GI Pipe
S ETT LING
TANK #01
MUD
CHILLE D WA TER
BATCH TA NK
CABIN
1-4" Ø GI Pipe
PLANT #01
1-3" Ø GI Pipe 1-3" Ø GI Pipe
BATCH
A DM IX TURE TA NK
300 T 300 T
S ILO FOUNDATIO N
DOCUMENT DISCLAIMER:
12
11
10
WEIGHBRIDGE
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
REVISION NO.: REVISED BY.: REVISION DATE:
R E V I S I O N S
1-3" Ø GI Pipe
WORKSHOP BUILDING
DIESEL FILLING AREA
VEHICLE PARKING
DIESEL TANK
WA STE
DUMP ING
Gu ar d
Hou se
DRAWING T ITL E:
MAIN GATE
(IN/OUT) RM NEW
185.35 RAZ AL KHAIR PLANT LAYOUT
MAZ
RM__-AD-SDP-01 37 Chief O pera tions Office r
DATE:
Heavy duty Manhole cover
0.60
PVC Conduit pipe sleeve Concrete Hollow Blocks 200mm thk.,
filled with mortar, with 8-10mm dia. vert.
dowel and 4-10mm dia. Ring and
0.80
Plastered Inside Wall
A
0.80
1.20
Concrete Base
PVC Conduit pipe sleeve
0.12
Heavy duty Manhole cover
Filled with fined Sand
0.30
Concrete Manhole Wall
SECTION “A”
MANHOLE DETAIL (MH) NTS
SCALE NTS
F.F.L.
10m mØ Bars
10cm 50cm 10cm
F.F.L.
0.60 m.
SECTION
NTS
PROJECT TITLE:
SCALE NTS SCALE N.T.S. Engineering Division LOCATION: MARJAN GAS PROJECT
ARCHITECH :
CIVIL ENGINEER : ENGR. ARCHIE DELACRUZ DATE : 01.07.20