You are on page 1of 32

Project : NEW RAZ AL KHAIR PROJECT

Number : RM
Project Number :
Building Number :
List of Drawings Construction & Facilities Management Depatrment

Item Descriptions Legend # Drawing Number No of Sheets Page # Remarks

1 Site Development Layout Master RM_-AD-SDP-01 1 of 1 1


2 Boundary Wall-Steel Wire Fence 1&2 BF-ST-01 1 of 1 2
3 Batching Plant and Silo Foundation # 01 (AL KIFAH)
Batching Plant, Silo, Raw Material and Ground Hooper 8 BPF-ST-01 1 of 2 3
Batching Plant, Silo, Raw Material and Ground Hooper 8 BPF-ST-01 2 of 2 4
4 Batching Plant and Silo Foundation # 02 (SIMEM)
Batching Plant, Silo, Raw Material and Ground Hooper 10 BPF-ST-01 1 of 3 5
Batching Plant, Silo, Raw Material and Ground Hooper 10 BPF-ST-01 2 of 3 6
Batching Plant, Silo, Raw Material and Ground Hooper 10 BPF-ST-01 3 of 3 7
5 Control Service Foundation #01 and #02
Control Service Foundation #01and #02 9 CSF-ST-01 1 of 2 8
Control Service Foundation #01and #02 9 CSF-ST-01 2 of 2 9
6 EDS Room Fabricated
EDS Room Fabricated 9 EDS-AD-01 1 of 1 10
7 Admixture Tanks - Foundation & Cover
Admixture Tanks - Foundation & Cover 8 & 10 ADT-AR-ST-01 1 of 1 11
8 Mud Settling Tank
Mud Settling Tank 8 & 10 MST-ST-01 1 of 1 12
9 Aggregate Stock Bays
Aggregate Stock Bays 11 ASB-01 1 of 3 13
Aggregate Stock Bays 11 ASB-03 2 of 3 14
Aggregate Stock Bays 11 ASB-03 3 of 3 15
10 Truck Washing and Dumping Tanks
Truck Washing and Dumping Tanks 12 TWD-ST-01 1 of 1 16
11 Septic Tank
Septic Tank (8m x 3m) 7 &19 SPT3-ST-01 1 of 1 17
12 Workshop Building
Workshop Building 15 WSB-01 1 of 3 18
Workshop Building 15 WSB-02 2 of 3 19
Workshop Building 15 WSB-03 3 of 3 20
13 Aggregate Washing Plant
Aggregate Washing Plant 15 ADT-ST-01 1 0f 1 21
14 Weighbridge
Weighbridge 6 WB-ST-01 1 0f 1 22
15 Concrete Waste Tank
Slab on-Grade and Asphalt on Grade 5 CWT-ST-01 1 0f 1 23
16 Diesel Filling Area
Diesel Filling Area 20 DFA-ST-01 1 0f 1 24
17 Laboratory and Curing Room
Laboratory and Curing Room 4 LCR-ST-01 1 0f 2 25
Laboratory and Curing Room 4 LCR-ST-01 2 0f 2 26
18 Drivers Room and Batch Cabin
Drivers Room and Batch Cabin 8 DRBC-ST-01 1 0f 1 27
19 Toilet Building
Toilet Building 17 TB-AR-03 1 of 3 28
Toilet Building 17 TB-AR-03 2 of 3 29
Toilet Building 17 TB-AR-03 3 of 3 30
Toilet Building 17 TB-EE-03 1 of 2 31
Toilet Building 17 TB-EE-03 2 of 2 32
Toilet Building 17 TB-AR-PL-01 1 of 1 33
Toilet Building 17 TB-AR-ST-01 1 of 1 34
20 Water/Electrical/Network/Disposal Lines
Main Electrical - Distribution-Layout Master EL-01-01 1 of 1 35
Main Electrical & Network Pipe Sleeves - Layout Master EN-01-01 1 of 1 36
Water Pipe Lines - Layout Master PL-01-01 1 of 1 37
Manhole and Trenches - MH-01-01 1 of 1 38
21 Yards Works
Slab on-Grade, Compacrted Soil & Compacted Gravel 21, 22, 23 SDP-001 1 0f 1 1
Page 1/1

PREPARED BY:

ENGR. ARCHIE SANCHEZ DE LA CRUZ


Construction and Facilities Engineer
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.

185.35 2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.

3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.

4. ALL M EASUREMENTS ARE SUBJECT FOR SIT E VERIFICATION.

45.00 87.82 51.03 1.50


5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .

THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.

15.91 10.00

PERIMETER LINE

2.00
7.15 24.00 7.50 2.35

KEY PLAN:

2.15
173.65

3.80
P ORTAB LE A CCOMM ODATI ON

14.00
3.00
WASTE
DUMPING 12

20.05
19.00
AREA

P ORTAB LE ME SHA LL
3.80

ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON

TRUE NORTH

3.00
34.48

185.35
3.80
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK

45.65
2.00
7.00 4.00

19 17

S ept ic T ank
7.50
TO ILET AND BATH

22

14.00
10
52.25

2.00

TOATAL AREA = (+/-) 32,186 M2

23 8.65
3.80

P ORTAB LE A CCOMM ODATI ON


8.55 25.25 TOTAL PERIMETER FENCE = (+/-) 718 LM
COMPACTED SOIL 17.36 10.95

ENTRANCE /
EXIT GATE
MUD
3.00

6.00
S ETT LING
TANK #02

11.60
3.80

LEGEND:

PLANT #02
P ORTAB LE A CCOMM ODATI ON

13

8.00

BATCH
1. MAIN GATE (ENTRANCE / EXIT GATE)
3.00

4.50
2. PERIMETER STEEL F ENCE
3.80

P ORTAB LE A CCOMM ODATI ON


3. GUARD HOUSE

8.00
S weet Wat er Tank
3.80

4. OFFICE PORTABLE AND LABORATORY BUILDING

BATCH
ADMI XTURE TANK 5. WASTE DUMPING AREA
CABIN

6. WEIGHBRIDGE

33.68
7. SEPTIC TANK (8M x 3M)

LINE
8. BATCH PLANT #01 – KICE PLANT

AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
18 DIESEL TANK
- BATCH PLANT FOUNDATION AND STRUCTURES
16 9
GENERATOR #0 1

- SILO FOUNDATION AND ST RUCTURES 2-300T AND 1-150T


LINE

26.00
DIESEL TANK

15.58
GENERATOR #0 2

- ADMIXT URE T ANK #01

PERIMETER
GENERATOR #0 3 - MUD SETTLING TANK #01
12.00 14.49

63.00
EDS

GROUND
HOOP ER
ROOM
9. CONTROL SERVICE AREA #01 & #02
GENERATOR #0 4

- EDS ROOM, GENERATOR 4-UNITS, ICE PLANT KTI, DIESEL TANKS 2-UNITS
21

6.00
14.50 5.00

GROUND
BATCH PLANT #03

HOOP ER
7.00
- CHIL LER PLANTS, WATER TANKS 4-UNIT S
PERIMETER

114.48
10. BATCH PLANT #02 – SIMEM PLANT

FOR FUTURE
- BATCH PLANT FOUNDATION AND STRUCTURES
5.45

9.00
WATE R TANK
- SILO FOUNDATION AND ST RUCTURES 3-300T AND 2-150T

BATCH
CABIN
173.65

173.65
GROUND
HOOP ER
28.50
CH ILLER P LANT

14
- ADMIXT URE T ANK #02

22

CONTROL SERVICE AREA 01


11 - MUD SETTLING TANK #02

11. AGGREGATE STOCKBAY 6-BAYS

27.63
12. TRUCK WASHING AND DUMPING AREA
COMPACTED SOIL 300 T
13. AGGREGATE WASHING PL ANT

24.61
300 T WATE R TANK

14. BATCH PLANT #03 FOR FUTURE

9
WA TER TA NK 15. WORK SHOP BUILDING
16. SWEET WATER TANK

S ETT LING
TANK #01
MUD
WA TER TA NK 17. TOILET PORTABLE
BATCH
CABIN
18. PORTABLE ACCOMMODATION

PLANT #01
19. SEPT IC TANK
8

BATCH
20. EQUIPMENT DIESEL TANK
21. SLAB ON GRADE

8.00
22. COMPACTED SOIL
23. COMPACTED GRAVEL
121.30

A DM IX TURE TA NK

300 T 300 T
3.00 20.00

S ILO FOUNDATIO N

DOCUMENT DISCLAIMER:
8.00
EQUIPMENT PARKING AREA
12
11
10

WEIGHBRIDGE

30.00
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020

23 6
22.12

REVISION NO.: REVISED BY.: REVISION DATE:

65.00
20
R E V I S I O N S

15 7 4 COMPACTED GRAVEL
5
WORKSHOP BUILDING
DIESEL FILLING AREA

VEHICLE PARKING
3
DIESEL TANK
15.00

WA STE

15.00
DUMP ING

CONCRETE P ORTAB LE P ORTAB LE O FFI CE


P ORTAB LE CURI NG
TE ST ING ARE A LA BORA TORY

D:\ARCHIE FILES RM RAZ AL KHAIR - SITE DEVELOPMENT PLAN – NEW LAND


ROOM
ROOM
S EP TIC TA NK

Gu ar d
3.00

Hou se
DRAWING T ITL E:

PERIMETER LINE MAIN GATE


(IN/OUT) RM NEW

49.90 20.00 13.50 36.30 4.00 24.50


RAZ AL KHAIR PLANT LAYOUT
15.11 22.00

A C C E S S R O A D 2 1 LOCATION: RAZ AL KHAIR

185.35 DRAWING TITLE:

SITE DEVELOPMENT PLAN


SCALE: 1 : 800 UNIT : METERS

SITE DEVELOPMENT PLAN


CONST RUC TION & F AC ILITIES MANAGEMENT DEPART MENT

ARCHITECTURAL & INTERIOR DESIGN WORKS:


CAD BY : DAT E:

DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019

CHECK ED BY : E NG R. M OHAM MA D ZA Y ED DAT E: 25-DEC -2019

REFERENCE FIL E L INK:


CHECK ED BY : E NG R. A SHRA F Y OUS EF DAT E: 25-DEC -2019

DRAWI NG NO. : P AGE NO. : FI NAL AP PROV AL:

MAZ
RM__-AD-SDP-01 01 Chief O pera tions Office r

DATE:
See Detail “A”
Vehicular Gate

See Detail “A”


3.00

Square Tube 100x50


Guard Steel Frame
(Corner) (Inside) House (Inside) Square Tube 100x100
every 3.00 mtr. Column

MAIN GATE
3.00 3.00 3.00 3.00 8.00 3.00 3.00 3.00 3.00

PLAN Square Tube 100x50 Corrugated Sheet


SEE DETAIL “A” SCALE NTS Steel Frame every 1.0M 0.05mm thick White Color Corrugated Sheet

1.35
See Detail B 0.05mm thick
Tension Wire with 3.00 White Color
G.I Pipe 2" dia.
Turn Buckle Main Gate
G.I Pipe 2" dia. With 3.00 mtr. total length
Horizontal brace Double door

2.70
2.70
Square Tube 100x50
SEE DETAIL – “X” Steel Frame

1.35
0.05
CORRUGATED SHEET COVER
NGL
G.I Pipe 2" dia.
ELEVATION VIEW SCALE 1 : 100 MTS

0.15
0.10

0.50
Horizontal brace SCALE 1 : 100 MTS

1.52
4-12mm dia. rebar dowel
G.I Pipe 2" dia. Full welded to GI pipe
With 3.00 mtr. total length
G.I Pipe 4" dia. / Square Tube
Plain Concrete
With 3.20 mtr. total length
Tension Wire with Turn Buckle 30x30x50cm 0.30
+ 8.95
- 4.00 m
(verify the actual length at site)
G.I. 2" dia. Or Square Tube DETAIL - X
Horizontal Bracing NOT TO SCALE
Fence Wire
1.35

2" x 2" x 3mm dia. thk.


with 2.50 mtr. Height
Fence Wire2" x 2" x 3mm dia. thk. /
Corrugated Sheet with 2.50 mtr. Height
2.70

G.I. Tie Wire #12

2.50m
6.07
Tensioner wire
1.35

G.I. 2" dia. Or Square Tube


Horizontal Bracing

RC Concrete
NGL 100x100x80cm
Eng ineerin g Division
NGL NGL
0.15

DRA WING TITLE LOCATION


0.10

0.50
1.52

4-12mm dia. rebar dowel


BOUNDARY FENCE WIRE & GATES RM

0.30
Full welded to GI pipe

0.10
NEW RAZ AL KHAIR

DESIGNED B Y : DRA WN BY : ASD


Plain Concrete 10-12mm dia. rebar dowel CHE CK ED BY : REVISION :
30x30x50cm 0.30 Full welded to GI pipe
DETAIL B
DATE : 20.02.2020 SCALE : AS SHOWN
CONTE NTS
PLAN, ELEVATION, DETAIL A & B
DETAIL A NOT TO SCALE
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
NOT TO SCALE 1 OF 1 02
BF-ST-01
Ope rations Director
SILO FOUNDATION

5500
300T 300T

150T
B

3000

500
638

2630
2250

2130
1612

CL WATER TRENCH 0.25M WIDTH


SLOPE GOING TO MUD SETTLING TANK
4500

5260
CL BATCH PLANT FOUNDATION LOADING AREA
(SEE ATTACHED DETAILS)

A A
1612

2130
2250

2630
638

500
5121 750
250 250
2450 3171 250

12550 5621 1000 7000

BASE PLATE AND HILTI ANCHOR


B BASE PLATE AND HILTI ANCHOR
(BY SRMCC)

(BY SRMCC)

BATCH PLANT FOUNDATION PLAN

LOADING AREA 400MM THICK WITH


LOADING AREA PARAPET WALL
DOUBLE WIREMESH 10MM THICK
BATCH PLANT FOUNDATION [1.0M (H) X 0.25M (T)]
200MM X 200MM O.C. SPACING
24610

1000MM THICK WITH 16MM DIA.


BARS SPACE AT 150MM O.C BOTH
WAYS
STEEL PLATE, HILTI ANCHOR BOLT
12550 6621 AND I-BEAM (BY SRMCC)
500

150

150
SLAB ON GRADE LOADING AREA SLAB ON GRADE
1000

EL +0.15 EL +0.15 EL +0.15

400
250
500

CONCRETE BLINDING 100MM CONCERETE BLINDING 100MM

COMPACTED BACKFILL

SECTION THTU - A
PROJECT TITLE

BATCH PLANT FOUNDATION CONCERETE BLINDING 100MM RM


1000MM THICK WITH 16MM DIA.
GROUND HOOPER BARS SPACE AT 150MM O.C BOTH
WAYS 4500 COMPACTED BACKFILL NEW RAZ AL KHAIR
150

Engineering Division

500 500
SL AB ON GRAD E EL SL AB ON GRAD E EL
2000

1000
+ 0. 15 + 0. 15
DRAWING TITLE LOCATION
RAMP CL BATCH PLANT FOUNDATION #01 RM
NEW RAZ ALKHAIR
4000

DESIGNED BY : DRAWN BY : ASD


CHECKED BY : REVISION :
2000

DATE : 03.FEB.2020 SCALE: As Shown

D D SECTION THTU - B CONTENTS


PLAN & SECTION & DETAILS
3000 1000 2000 2000 DRAWING NO. SHEET NO. PAGE NO. APPROVED BY
4000 4000 BPF-ST 1 OF 1 03 Operations Director
3000 5500

2750 2750

1140 1610 1610 1140 500


BASE PLATE 500X500X25MM THICK
WITH 30MM DIA. ANCHOR BOLT
GROUND HOOPER FOUNDATION (SEE ANCHOR BOLT DETAIL)
1000MM THICK WITH 16MM DIA. BARS 85 330 85
SPACE AT 150MM O.C BOTH WAYS
CONCRETE BLINDING 100MM THICK

1140
4000

85
COMPACTED BACKFILL
Base Plate 500x500x25mm thk.

150

2750
H-Beam 250x250mm HEB

500 500

500
1000

330
SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15

1610
Hole 33mm dia.
Anchor bolt 30mm dia. x 800mm long
300T

85
1610
8485
PLAN
SECTION THTU - C E E

4735

10235
1515

130
TOP SILO FOUN DATION
FINISHED EL +0.65M

1610
13485
300T

1000
GROUND HOOPER FOUNDATION
Anchor bolt 30mm dia.

1610
x 800mm long

700
1000MM THICK WITH 16MM DIA. BARS
SPACE AT 150MM O.C BOTH WAYS
BASE PLATE 50X50X25MM THICK
CONCRETE BLINDING 100MM THICK WITH HILTI ANCHOR BOLT

1140
GROUND HOOPER RAMP
(BY SRMCC)
WITH 2-LAYER 10MM DIA. BARS
SPACE AT 150MM O.C BOTH WAYS

5000
3000 4000 COMPACTED BACKFILL

2000 1000
150T
300

3250
150

500 500

1000

SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15

SECTION

ANCHOR BOLT DETAIL


SECTION THTU - D
SILO FOUNDATION DETAIL

6MM THIK. STEEL GRATINGS COVER 10MM DIA. STEEL BARS


CONCERETE BLINDING 100MM FOR ALL WATER TRENCHES
SILO 300T & 150T FOUNDATION
1000MM THICK WITH 16MM DIA. BARS
SPACE AT 150MM O.C BOTH WAYS
5500 COMPACTED BACKFILL 100 250 100
150

500 500

PROJECT TITLE
1000

SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15


150

RM
150
100

NEW RAZ AL KHAIR


Engineering Division

SECTION THTU - E DRAWING TITLE


BATCH PLANT FOUNDATION #01
LOCATION
RM

OPEN TRENCH DETAIL DESIGNED BY :


NEW RAZ ALKHAIR

DRAWN BY : ASD
CHECKED BY : REVISION :
DATE : 03.FEB.2020 SCALE: As Shown

CONTENTS
PLAN & SECTION & DETAILS
DRAWING NO. SHEET NO. PAGE NO. APPROVED BY
BPF-ST 1 OF 1 04 Operations Director
40 00
20000
12 000 40 00
NOTES:
1) Height of Plant and Ground
SILO FOUNDATION Hopper Foundation must be

4000
150/200T 200mm above Floor Level.

200
2) Height of Silos Foundation

8200
must be 400mm above Floor Level.
C B SILO
SILO

8550
4000
2810 FOUNDATION
FOUNDATION
150/200T
150/200T 14 05 14 05

430
430
2135
CONCRETE PARAPE T WALL
CL LOADING AREA 0.25M THICK AND 1.0 METE R HEIG HT

4270

5130
3410
2135
LOA DING P OINT

430
(WET B ATCH)

4300
WATER TRENCH 0.2 5M WIDTH
SLO PE GOING TO MUD SETTL ING TA NK

430
(SE E A TTACHED DETAIL S)

300
CL
LOADING AREA

5130
LOA DING P OINT
(DRY B ATCH)

8600
2700
13 50 13 50

375

25250

42450
MUD SETTLING TANK

375
26 50

13 25 13 25

10500
A

7550
2400
12 00 12 00
4600

325
D 23 00 23 00
1 860

325
1300

1350
1200
2600

2400

2700

CL CL CL
1200
1300

1350

17200
32 5 32 5
37 5 37 5
RAMP

8650
8650

10505 10700 12475

GROUND HOOPE R Eng ineerin g Division

E DRA WING TITLE LOCATION


RM
BP#02 SIMEM PLANT LAYOUT
1000

CL NEW RAZ AL KHAIR


2000

1000

1000

DESIGNED B Y : DRA WN BY : ASD


77 6 45 00 13 25
CHE CK ED BY : REVISION :
DATE : 14.07.20 SCALE : AS SHOWN
6600 CONTE NTS
FOUNDATION PLAN
33680
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
BPF-ST- 01 1 OF 3 05 Ope rations Director
Ø 14 mm Rebars@ 150 mm spacing Ø 16 mm Rebars@ 150 mm spacing
Both Ways( 2 Layers) Both Ways( 2 Layers)

8 00
2 86

4 00
177
0
7 75

F.L.
160

F.L.

0040
135
886
400

60 0
177
SECTION THRU -A
Slab on grade 300mm Thick
With 2-Layer 12mm dia. bars SECTION THRU -C
spaced @ 250mm O.C.
RC Parapet wall with 14mm dia.
250 Ø 14 mm Rebars@ 150 mm spacing Bars spaced @ 150mm O.C.
Both Ways( 2 Layers)

00 0
12661
61
8 00
26

88 0
6
886
20 0

20
F.L.
00

610
1061

1100

00
21

8 00

877
177

SECTION THRU -B

Ø 14 mm Rebars@ 150 mm spacing


Both Ways( 2 Layers)
886
200

88 0
20 6

Eng ineerin g Division


DRA WING TITLE LOCATION
F.L.
4 00
266

RM
BP#02 SIMEM PLANT LAYOUT
2 00
6 00
6

NEW RAZ AL KHAIR


177
4 005
26

177

DESIGNED B Y : DRA WN BY : ASD


CHE CK ED BY : REVISION :
DATE : 14.07.20 SCALE : AS SHOWN
CONTE NTS

SECTION THRU -D DRA WING NO .


SECTION DETAIL
SHEET NO . APP RO VED B Y
PAG E NO .
BPF-ST-01 2 OF 3 06 Ope rations Director
GROUND HOOPER FOUNDATION
1000MM THICK WITH 16MM DIA. BARS SPACE
AT 150MM O.C BOTH WAYS

GROUND HOOPER RAMP


WITH 2-LAYER 10MM DIA. BARS SPACE AT CONCRETE BLINDING 100MM THICK
150MM O.C BOTH WAYS
COMPACTED BACKFILL
4000 2600

2500 1500

600

150
SL AB ON GRAD E EL +0.15 SL AB ON GRAD E EL +0.15

200

600
400
SECTION THTU - E

6MM THIK. STEEL GRATINGS COVER 10MM DIA. STEEL BARS


FOR ALL WATER TRENCHES

100 250 100


150
150
100

Eng ineerin g Division


DRA WING TITLE LOCATION

OPEN TRENCH DETAIL BP#02 SIMEM PLANT LAYOUT


RM
NEW RAZ AL KHAIR

DESIGNED B Y : DRA WN BY : ASD


CHE CK ED BY : REVISION :
DATE : 14.07.20 SCALE : AS SHOWN
CONTE NTS
SECTION DETAIL
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
BPF-ST-01 3 OF 3 07 Ope rations Director
Ice Plant Foundation - RC concrete
0.60m(D) x 6.0m(W) x 14m(L) (SEE DETAIL)

Trench for Electrical 500mm (W) x 600mm (D)


Filled with sand after completely installation of Cable Wires
(SEE TRENCH DETAIL)

0.79 0.79
27.63
13.44 6.00 8.18 2.30 1.60 2.30 1.60 2.30 1.60 2.30
0.50 0.50 0.65
0.20 3.50 3.50 3.50 2.20 5.00 1.37 3.00 3.50 0.20 B

Gen. Set #1

Gen. Set #2

Gen. Set #3

Gen. Set #4

5.37
5.74

7.33

7.37
Cold Water Tank 02

Cold Water Tank 01


Raw Water Tank 01

Raw Water Tank 02

0.30
A

Chiller Plant

1.70
14.00

14.50
2.07
5.00

Diesel Tank

Diesel Tank
Ice Plant
EDS

VERIFY
ROOM

3.00

7.13
2.17

2.07
C
5.60
5.00 1.80 8.78
0.30
15.58

SCAF PLAN #01 SEE EDS ROOM DETAIL

Scale 1: 200 m

SCAF PLAN #02


Scale 1: 200 m

SERVICE CONTOL AREA FOUNDATION PLAN #01 and #02


Scale 1: 200 m

NOTES:
1) All backfill materials must be compacted PROJECT TITLE
not less than 95% density or approved by client.
2) Two coats of epoxy bituminous coating material RM
shall be applied to the external surface of concrete
contacting soil, excluding bottom surfaces and surfaces NEW RAZ AL KHAIR
of leveling. (Blinding) Engineeri ng Division

3) All bottom surfaces of concrete cast against and DRAW ING TITLE LOCATIO N
permanently in contact with ground shall be under laid by CONTROL SERVICE FOUNDATION KS A
polyethylene sheets (Vapour Barrier) as indicate on drawings.
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS

DRAW ING NO. SHEET NO. PAGE NO. APPROV ED BY


CSF-ST-01 1 OF 2 08
Ope rations Director
Electrical Trench 300mm(W) x 600mm(D)
With Steel Plate Cover after Installation of 14mmØ @ 150mm Spacing Bothways Compacted Selected Earthfill
Electrical Wires Ice Plant Foundation - RC concrete 600mm thk. Top & Bottom Bars
with 14mmØ @ 150mm Spacing Bars Bothways
on Top, Middle, and Bottom Electrical Trench 300mm(W) x 600mm(D)
RC concrete with 14mmØ @ 150mm 50mm thk. Blinding With Steel Plate Cover after Installation of
spacing bothways Top & Bottom Electrical Wires

8.18 6.00 13.44 14.50


5.60 0.30 5.37

0.60

0.05
0. 05

Top Foundation El ev. + 0.20 Top Foundation El ev. + 0.20

0.20
F. F. L. E lev. +0.15
0.20

0.30 F. F. L. E lev. +0.15


F. G. L. El ev. 0. 00 F. G. L. El ev. 0. 00

0.15
0.15

50mm thk. Blinding


Compacted Selected Earthfill

SECTION THRU “B”


SECTION THRU “A” Not To Scale

Not To Scale

Trench for Electrical 500mm (W) x 600mm (D)


With Steel Plate Cover after installation of Cable Wires

10cm 30cm 10cm


10mmØ Bars

EL. 0.20m

20cm
Concrete Ped estal Base EL. 0.00

60cm
DIESEL TANK
Parapet wall blocks 20,000 LTS
plastered both sides DIESEL TANK

10cm
0.60
1.00

Elev. + 0.20
F. G. L.Elev. 0.00
ELECTRICAL TRENCH DETAIL
SCALE
0.20

2.07 3.00
VERIFY 2.07 N.T.S.

SECTION “C”
Not To Sca le
PROJECT TITLE

RM
NEW RAZ AL KHAIR
Engineeri ng Division

DRAW ING TITLE LOCATIO N


CONTROL SERVICE FOUNDATION KS A

DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS

DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY


CSF-ST-01 2 OF 2 09
Ope rations Director
4.00

2.00 2.00
Lifting Eye for Anchor

0.10
Sandwich Wall Panel with Insulation 50mm thick

1.20
Rectangular Tube 100mm x 50mm

3.40
3.20
1.00
Hollow Steel Door 1.80m x 2.40m

2.48

1.00

0.10
SECTION THRU “B”
SCALE 1 : 100 m

Corrugated Steel Roofing 0.5mm thk.


with roof insulation and wire mesh
Purlins Rec tangular Tube 100mm x 50mm

I-Beam 140mm x 73 mm

4.00
A/C Unit 1.5 Tons
Steel Column I-Beam 140mm x 73 mm

PERSPECTIVE VIEW
2.00 2.00
Lifting Eye for Anchor

SCALE N. T. S.

1.20

3.20

3.30
1.00
4.00 4.00
Steel Plate 200mm x
2.00 2.00
200mm x 16mm thk. With
4-16mmØ Hilti Anchor

1.00
1.20 0.50
0.50 0.70
0.50mm thk. Corrugated
A

0.10
A/C Sheet with Roof Insulation
and Chicken Wire
0.70

Rafter 140mm x 73mm


SECTION THRU “A”
0.50

Open Trench for Wires Rectangular Tube


2.00

SCALE 1 : 100 m

4.00
Open Trench for Wires

4.00
Open Trench for Wires

Purlins 5 - 100mm x 50mm


4.00

Rectangular Pipe
I-Beam 140mm x 73 mm
Floor Joist
2.00

B Engineeri ng Division
DRAW ING TITLE LOCATIO N
Hollow Steel Door 1.80m x 2.40m Opening EDS ROOM PORTABLE RM
NEW RAZ ALKHAIR

FLOOR PLAN ROOF FRAMING PLAN DESIGNED BY : DRAW N BY : A SD


REVISION :
SCALE N. T. S. CHECKED BY :
DATE : 16.02.2020 SCALE: 1 : 75
SCALE 1 : 100 m
CONTENTS
PERSPECTIVE, FLOOR PLAN, AND SECTIONS
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
EDS-AD-01 1 OF 1 10
Ope rations Director
Box Pipe
(5cmx10cm)
Roofing Steel Sheet

4.00 4.00

Concrete Column (20 cm x 20 cm)

0.66
A 20cm thk. Concrete slab with
Square Tube 10cm x 10cm
10mmØ bar spaced @ 150mm O. C.

0.66
2.00
8.00 Steel Truss
Steel Plate ( 15 cm x 15 cm)
Concrete foundation 0.20 3.80 3.80 0.20

SL OPE
80cmx20cm thk. Roofing Line

0.66
Blocks wall parapet
0.20

4-12mmØ Bolt with nuts & washer

0.66
Silo Foundation side

SL OPE
Rectangular Tube ( 8cm x 4 cm )

0.66
2.00
4.00

Blocks wall parapet


4-12mmØ Bolt with nuts & washer
+0.65 Concrete column

0.66
20cmx 20cm Steel Plate ( 15 cm x 15 cm)
0.20

A
3.00

Roofing Line Box Pipe Box Pipe Purlins


(5cmx10cm) (4cmx8cm)

Square Tube (10 cm x 10 cm)

ROOF FRAMING PLAN

FLOOR PLAN 12mm thk. X 200mmx200mm Base Plate


w/ 4-16mmØx300 mm Anchor Bolts

Galvanized Corrugated Concrete Column (20 cm x 20 cm)


Square Tube (5 cm x 5 cm)
Metal Sheet

Square Tube ( 4 cm x 8 cm) Angle Bar (4 cm x 4 cm) 4-12Ø Vertical bars w/ 8Ø ties
1.00

spaced @ 150 mm. O. C.

Rectangular Tube (5 cm x 10 cm)


0.66 0.66 0.68 0.68 0.66 0.66

SEE DETAIL – A1
Steel Truss Stiffeners
DETAIL – A1

Corrugated Wall Sheet Square Tube (10 cm X 10 cm)


3.75
6.00

With Steel Frame (100mm x 50mm Tube)


5.00

Hollow Blocks filled with mortar and


Concrete column plastered and paint both face
20cmx 20cm 200mm thk. Concrete Finished
SEE DETAIL – A
1

PROJECT TITLE
3.00
1.05

RC concrete retaining wall


RM
+0.65 Batch Plant Foundation Floor Level
0.2 0

NEW RAZ AL KHAIR


Engineering Division
0.45

F.F.L. Elev. +0.15 F.F.L. Elev. +0.15


F.G.L. Elev.0.00 Selected Backfill F.G.L. Elev.0.00 DRAWING TITLE LOCATION
ADMIXTURE TANK FOUNDATION KSA
0.20

0.80 DESIGNED BY : DRAWN BY : ASD


CHECKED BY : REVISION :
DATE : 16.02.202 0 SCALE: 1 : 100
CONTENTS
Concrete footing PLAN, ELEVATION & SECTION DETAIL
SECTION THRU “A” DRAWING NO. SHEET NO. APPROVED BY
PAGE NO.
ADT-AR-ST-01 1 OF 1 11
Chief Operating Officer
0.30

Water Passage 10mm dia. Horizontal bars @


RC Wall 200mm 150mm spacing

0.50
0.30 F.F.L. F.F.L.
N.G.L.

0.25
N.G.L.

2.00m.
0.30

1.20
12mm dia. Vertical bars

0.95
@ 150mm spacing

200mm thk. Concrete slab With10mm dia. @


150mm Spacing bothways (2 Layers)

0.30
1.70

Water Passage A Plain concrete blinding 200mm thk. Concrete slab With10mm dia. @
150mm Spacing bothways (2 Layers)

SECTION THRU - A
5.80m.

SCALE 1:75 MTS


3.80

B 0.30

10mm dia. Horizontal bars @


RC Wall 200mm
150mm spacing Water Passage

0.30

0.50

0.25
F.F.L. F.F.L.
PLAN N.G.L. N.G.L.
2.00m.

Ramp
1.20

SCALE 1: 75 MTS

0.95
0.30

12mm dia. Vertical bars Plain concrete blinding


@ 150mm spacing

SECTION THRU - B
SCALE 1:75 MTS
Engineeri ng Division
DRAW ING TITLE LOCATIO N
MUD SETTLING TANK LAYOUT RM NEW RAZ
AL KHAIR
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.20 SCALE: 1 : 75
CONTENTS
PLAN, SECTION A & SECTION B
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
MST-ST-01 1 OF 1 12
Ope rations Director
Water T rench

62.94
0.15 0.15

0.20
2.66 2.56 2.56 2.66 2.66 2.56 2. 56 2.66 2. 66 2. 56 2.56 2. 66 2.66 2.56 2.56 2.66 2.66 2.56 2.56 2.66 2.66 2.56 2.56 2.66

2.56
Drain Pipe
A B

2.56
10.59

D
2. 56

C
2.56
0.15

FLOOR PLAN

62.94
10.44 10. 44 10.44 10.44 10.44 10.44

0.95

0.95
5.12

0.95

0.95

0.95
10. 24

10.45
0.95

0.95

0.95
5.12

0.95

0.95

0.95

Roofing Line Z - Purlins 200 x 100 12 mm Ø Sag Rod( Plain Bars) H - Beam Column200 x 200 I - Beam Rafter200 x 100

ROOF FRAMING PLAN

Eng ineerin g Division


DRA WING TITLE LOCATION
RM NEW
AGGREGATE STOCKBAY LAYOUT
RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
CONTE NTS
PLAN AND ROOF FRAMING PLAN
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
ASB - 01 1 OF 3 13
Ope rations Director
200

45 110 45
10.59

45
0.50mm thk. Corrugated
Z-PURLINS Spaced @ 1.0 m O.C. I - Beam Rafter 200 x100
Sheet Color W hite

200
110
0.50mm th k. Co rrugated Sh eet

45
5.70
Colo r White on steel framing

U-Chan nel 200mm x76mm Anchor Bolt 20mmØ with PLAN


Base Plate 16mm thk.

Precast Concrete Panel


(1m x 2.5m)

100
4.00
H-Beam 200 x 200

1.00
WATER
TRENCH
Slope F.L.
G.L.

400
TYPICAL SIDE VIEW
SCALE 1:100 M

SECTION THRU - X
I-Beam 200 x 200mm
Precast Concrete160 x 2500mm

Anchor Bolt 25mmØ with


ANCHOR BASE PLATE - FABRICATION PLAN
Base Plate 16mm thk.
NOT TO SCALE
10mmØ ties 1 @ 70mm rest @ 150mm 0.30
0.30
12mmØ Horizon tal and Vertical Bars
12mmØ Horizon tal and Vertical Bars spaced @ 200mm O.C.
spaced @ 200mm O.C.

2-10mmØ Dowel Bars


2-10mmØ Dowel Bars
1.00

Screen Wire Mesh 10mm @


1.00

Screen Wire Mesh 10mm @


200mm spacing 2-Layer
200mm spacing 2-Layer
F.L.
F.L.
0.20
0.20

G.L. Water Passage with Slope to Truck Washing Area


G.L.

10mmØ Bars
0.30
0.30

12mmØ bars spaced @ 200mm O.C.


12mmØ bars spaced @ 200mm O.C. 10cm 30cm 10cm
Both ways
Both ways

1.20 EL. 0.20m


1.20
50mm thk. blinding

20cm
50mm thk. blinding

EL. 0.00
60cm
Eng ineerin g Division
SECTION THRU - A SECTION THRU - B DRA WING TITLE LOCATION
NOT TO SCALE NOT TO SCALE RM NEW
AGGREGATE STOCKBAY LAYOUT
RAZ AL KHAIR
10cm

DESIGNED B Y : DRA WN BY : ASD


CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
CONTE NTS
PLAN AND ROOF FRAMING PLAN
WATER TRENCH
NOT TO SCALE DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y

ASB - 03 2 OF 3 14
Ope rations Director
PRECAST PANELS

Ø 10mm Wire Mesh


1 ½" Ø PVC Pipe
150mm Spacing

2500

1250 1250

160
PRECAST PANEL PLAN
SCALE: 1:20

1 ½" Ø PVC Pipe 1 ½" Ø PVC Pipe

1250 1250

350
350

1000
950
1000

650
650
50

BOTTOM PANEL ELEVATION MIDDLE AND TOP PANEL ELEVATION


SCALE: 1:20 SCALE: 1:20

Eng ineerin g Division

DRA WING TITLE LOCATION


AGGREGATE STOCKBAY LAYOUT RM NEW
RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
CONTE NTS
PLAN AND ROOF FRAMING PLAN

DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y

ASB - 03 1 OF 3 15
A
10.00
16.20

0.30 5.00 0.30 5.00 5.00 0.30

EL. +0.15 EL. +0.15

2.75
EL. 0.00 0.30 9.40 0.30

EL. +0.15 Concrete Slab 250mm thick with 12mmØ Bars


spaced @ 200mm O.C. Both ways

6.00
Retaining Wall 300mm thick with 12mmØ Bars
Ver. & Hor. spaced @ 200mm O.C. Both ways

EL. 0.00
EL. +0.15
9.40

9.70
0.30 0.30
14.00

14.00
Water Passage
B B

3.00
Water Passage
EL. 0.00 C C N.G.L. EL 0.00

4.00

0.30
0.30
Compacted Soil
Concrete Blinding
0.30

1.00

Water Trench (See Detail)


A
Concrete Slab 250mm thick with 12mmØ Bars
Water Passage spaced @ 200mm O.C. Both ways DUMPING AREA PLAN SECTION THRU-C
SCALE 100 M SCALE 100 M

TRUCK WASHING AREA PLAN


SCALE 100 M

Retaining Wall 300mm thick with 12mmØ Bars


Ver. & Hor. spaced @ 200mm O.C. Both ways
Concrete Slab 250mm thick with 12mmØ Bars Water Passage with Slope

spaced @ 200mm O.C. Both ways


10cm 30cm 10cm
10mmØ Bars

0.30 0.30 0.30


10.00 5.00 5.00 5.00
0.50

0.55

0.60

EL. 0.20m
EL +0.15 EL +0.15

20cm
EL 0.00
Water Water Water
Passage Passage Passage
EL. 0.00

60cm
0.30

Compacted Soil
2.50
Compacted Soil

10cm
Compacted Soil

Concrete Blinding

SECTION THRU - B WATER TRENCN DETAIL


SCALE N.T.S. SCALE N.T.S.

Concrete Slab 250mm thick with 12mmØ Bars


spaced @ 200mm O.C. Both ways

2.75 9.70 4.00 0.30

0.40
0.60

Retaining Wall 300mm thick with 12mmØ Bars


0.50

Ver. & Hor. spaced @ 200mm O.C. Both ways


Slab on Grade EL +0.15 EL 0.00
0.15

G.L. Water Passage


0.30

Engineering Division
2.50
1.60

DRAWING TITLE LOCATION


RM
TRUCK WASHING AND DUMPING AREA
0.25

NEW RAZ ALKHAIR

DESIGNED BY : DRAWN BY : ASD


CHECKED BY : REVISION :
Lean Concrete
50mm Thick DATE : 03.JUNE.2 019 SCALE:
CONTENTS
PLAN, SECTION AND DETAILS

SECTION THRU-A DRAWING NO. SHEET NO. PAGE NO. APPROVED BY


SCALE N. T. S. TWD-ST-01 1 OF 1 16
Operations Director
0.20
0.20
0.20 3.70

Beam Beam

60x60cm Manhole cover


0.20

1.50 1.50
4-14mm dia. main rebar

0.40
0.89
2-12mm dia.

1.40

1.40
With 8mm dia. stirrups @ 200mm pacing

Beam
3.50m.

3.10

Beam
Beam 0.40 0.60 0.40

BEAM DETAIL (B1)


60x60cm Manhole cover
A
NTS

Beam
Beam
0.20

RC Column
See detail
0.40
PLAN
SCALE 1 : 50 MTS RC Beam 4-14mm dia. main rebar

0.20
0.55
See detail 2-12mm dia.
8mm dia. ties @ 200mm spacing

COLUMN DETAIL
NTS
60x60cm Manhole cover 20cm thk. RC slab 60x60cm Manhole cover
With 12mm dia. rebar @ 200mm
0.20

spacing both ways (2 layers)

FFL FFL
0.30

0.35

6" dia. PVC pipe sch. 40


Sewer inlet

200mm thk. CHB wall


2.70m.

with 12mm dia. vertical bar @ every 800mm spacing


6" dia. PVC pipe
2.50

& 12mm dia. horizontal bar @ every 3 layers of CHB

140x120mm with out concrete


filled with aggregate
0.30

30cm thk. Raft foundation


with 200x200x10mm dia. wire mesh Eng ineerin g Division
1.50 2.40 1.50 (2 layers) DRA WING TITLE LOCATION
SEPTIC TANK LAYOUT (8.00x3.00 mtrs.) RM NEW RAZ
AL KHAIR
8.40
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :

SECTION A DATE : 17.02.202 0 SCALE : 1 : 50


CONTE NTS
SCALE 1 : 50 MTS PLAN, SECTION & DETAILS
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
SPT3-ST - 01 1 OF 1 17
Ope rations Director
B
20.00
6.55 6.50 6.55
6.75 6.50 6.75

H - Beam Column 200 x 200

1.00
1.90

1.00
C
5.00

1.00
4.80

1.00
I - Beam Rafter 200 x 100

1.00
1.00
1.00
10.00
15.00

5.00

1.00
5.00

Roofing Line

1.00
See Detail A1
Concrete Column

1.00
1.00
1.00
4.80

1.00
5.00

1.00
2.80

1.00
2.10 Z - Purlins 200 x 100 12mm Ø Sag Rod (Plain Bars)

FLOOR PLAN ROOF FRAMING PLAN

Eng ineerin g Division


DRA WING TITLE LOCATION
WORKSHOP BUILDING LAYOUT RM NEW
RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
CONTE NTS
FLOOR PLAN AND ROOF FRAMING PLAN
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
WSB - 01 1 OF 2 18
Ope rations Director
H - Beam Co lumn 2 00 x 2 00 1.50

0.55 0.40 0.55

Concrete Column 400mm Concrete Hollow Blo cks


2.10 1.00

Concrete Column 400m m

2.0 0
Angle Bar 50 x 50
With 12-16mm d ia. Vertical Bars

0.55
Rail For Moving Plot F orm
Grade Beam B

3.0 0
300 X 200 (SEE DETAIL)
Service L ight

1.50

0.40
Finish Floor Slab

0.55
0. 50 H - Beam C olumn 200 x 200

1.00

1.2 0
0.50

0.2 0
Fo oting Be am 0.50 x 1.50 x 1.50

Fo oting Bea m
Lean C oncrete 1.00
C
0.20 0.20

1.40

DETAIL THRU A1
SECTION THRU - A

0.20
6 – 16mm Ø bars
Horizontal Bars

0.30
10 mmØ bars Stirrups
@ 150mm O.C. Spacing

H - Beam C olumn 200 x 200


To p Beam
200mm x 300 mm
GRADE BEAM DETAIL (GB)
H - Beam C olumn 200 x 200
Anchor Base Plate 300 x 300
Concrete Column 400m m
Anchor Bolt 20mm Ø x 600mm
Concrete Column 400m m

Grade Bea m 12 - 16mmØ Vertical Ba rs


Screen Wire M esh 200mm x 300 mm
10mmØ @ 1 50mm Spacing
2.0 0

12 - 16mm Ø Vertical Ba rs
2.0 0

10mmØ @ 2 00mm Spacin g


3.0 0

10mmØ @ 2 00mm Spacing Concrete Hollow Blo cks with


Slab on Grade
3.0 0

200mm Thick 10mm Ø @ 1 000mm Spacing


Filled with Concrete
Finish Floor Slab 8mm Ø @ 2 00mm Spacin g
0. 50
0. 50

4-14mmØ Horizontal Bars

10mmØ Ties @ 1 50mm Spacing


0.50

10mmØ Ties @ 15 0mm Spacing


0.50

Lean C oncrete
Lean C oncrete
Eng ineerin g Division
14-16mmØ Main Bars DRA WING TITLE LOCATION
14-16mmØ Main Bars
WORKSHOP BUILDING LAYOUT RM NEW
10mmØ Dow el Bars
10mmØ Dow el Bars RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
SECTION THRU - B SECTION THRU - C CONTE NTS
SECTION AND DETAILS
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
WSB - 02 1 OF 2 19
Ope rations Director
20.00
6.75 6.50 6.75

GB GB GB
FT/CL FT/CL FT/CL FT/CL Z - Purlins 200 x 100 Corrugated Roof Sheet
I - Beam Rafter 200 x 100
5.00

GB

GB
GB
GB

Corrugated Wall Sheet


With Steel Framing
FT/CL FT/CL FT/CL FT/CL (100mm x 50mm Tube)
H - Beam Column

5.00
200 x 200

7. 50
7.0 0
Concrete Column

GB

GB
15.00
5.00

GB
GB

400mm
Concrete Hollow Blocks
200mm Thickness

FT/CL FT/CL FT/CL FT/CL

2. 00
FFL
5.00

GB

GB
GB
GB

FT/CL FT/CL FT/CL FT/CL TYPICAL SIDE ELEVATION PLAN


GB GB GB

FOUNDATION PLAN

Eng ineerin g Division


DRA WING TITLE LOCATION
WORKSHOP BUILDING LAYOUT RM NEW
RAZ AL KHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 16.02.20 SCALE : AS SHOWN
CONTE NTS
FOUNDATION PLAND AND ELEVATION
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y
WSB - 03 1 OF 3 20
Ope rations Director
3.50
A
CL

1.75
AGGREGATE STOCKBAY

1.75
4 3 2 1

Ver ify A fter


00
Ver ify A fter In stallation 00 In stallation
Ver ify A fter 00
Installa tion 2.50

10.00
To b e
Ver ify
1.00 1.50 1.50

To b e Con cre te after


To b e Con cre te after Installa tion of Co nve yor
Installa tion of Co nve yor B
To b e Con cre te after
Installa tion of Co nve yor

1.20

3.00
CL

4.00
B

BOUNDARY FENCE LINE

AGGREGATE WASHING PLANT FOUNDATION PLAN

RC Conveyor Fo undation with 12mmØ bars spa ce d RC Conveyor Fo undation with 12mmØ bars spa ce d
@ 150 mm O.C. both ways (2 layers) @ 150 mm O.C. both ways (2 layers)

Lea n Concrete 50mm thk. Lea n Concrete 50mm thk.

0.10 0.10
0.10 0.10

0.20

Compacte d S oil
0.20

Compacte d S oil
0.40
0.40

Engineering Division
DRAWING TITLE LOCATION
AGGREGATE WASHING PLANT RAZ AL KHAIR

DESIGNED BY : DRAWN BY : ASD


SECTION THRU “A” SECTION THRU “B” CHECKED BY : REVISION :
DATE : 16.02.202 0 SCALE: 1 : 100
CONTENTS
PLAN AND SECTION DETAIL
DRAWING NO. SHEET NO. PAGE NO. APPROVED BY
ADT-ST-01 1 OF 1 21
Operations Director
4.00
B

1.50
RC FOUNDATION 10mmØ Bars 2-layer spaced
@ 200mm O.C. Both Ways

4.00 1.00 18.05


STEEL RAILINGS PLAN 100 x 100 x 5mm Thick
Angle Bar at Corner Edge
1.00 4.00 14 - 16mm ø Horizontal Bars 4.00 1.00
1.50 10mm ø Stirrups spaced
@ 200mm O.C

0.10
A

0.70
Slab on Grade Elevation Slab on Grade Elevation

4.00
4.00

0.15

0.60
0.35
NOTE: TO BE CONCRETED AFTER
ISTALLATION OF WEIGHBRIDGE STRUCTURE

WEIGHBRIDGE PLAN RC RAMP DETAIL


SECTION - B

STEEL RAILINGS 2-½” PIPE


RC FOUNDATION DETAIL
WITH COLOR YELLOW AND BLACK

R.C. RAMP (SEE DETAIL) WEIGHBRIDGE STRUCTURE


With 10mmø Bars 2-Layer INSTALLED BY WEIGHBRIDGE SUPPLIER R.C. RAMP (SEE DETAIL)
Spaced @ 200mm O.C. R.C. SLAB ON GRADE
With 10mmø Bars 2-Layer
NOTE: TO BE CONCRETED AFTER R. C. FOUNDATION (SEE DETAIL) 0.15M Thick
Spaced @ 200mm O.C.
ISTALLATION OF WEIGHBRIDGE STRUCTURE 5M (L) X 1.5M (W) X 0.80M (H) With Steel Wire Mesh
NOTE: TO BE CONCRETED AFTER
ISTALLATION OF WEIGHBRIDGE STRUCTURE
5.00 18.05 5.00
0.10

0.10
4.00 1.00 5.95 5.95 5.95 1.00 4.00
0.45

0.45

Slab on Grade Elevation 0.10 Slab on Grade Elevation

0.60

0.60
0.60

0.15
0.35

1.50 1.50 1.50 1.50


COMPACTED SOIL
COMPACTED SOIL COMPACTED SOIL

SECTION THRU-A

Engineering Division

PROJECT TITLE LOCATION


RM
WEIGHBRIDGE FOUNDATION AND RAMP NEW RAZ ALKHAIR

DESIGNED BY : DRAWN BY : ASD


CHECKED BY : REVISION :
DATE : 22-JUN-2020 SCALE: 1 : 200 M
CONTENTS
PLAN & SECTION & DETAILS

DRAWING NO. SHEET NO. PAGE NO. APPROVED BY

WB-ST-01 1 OF 1 22
Operations Director
0.30

10mm dia. Horizontal bars @


150mm spacing

0.20
0.30 F.F.L. F.F.L.
N.G.L. N.G.L.

1.30
0.30

0.80
12mm dia. Vertical bars
@ 150mm spacing

300mm thk. Concrete slab With10mm dia. @


150mm Spacing bothways (2 Layers)

0.30
1.00

A Plain concrete blinding 200mm thk. Concrete slab With10mm dia. @


150mm Spacing bothways (2 Layers)

SECTION THRU - A
4.30

SCALE 1:75 MTS


3.00

B 0.30

10mm dia. Horizontal bars @


150mm spacing

0.20
F.F.L. F.F.L.
PLAN N.G.L.
Ramp
N.G.L.
1.30

SCALE 1: 75 MTS
0.80
0.30

12mm dia. Vertical bars Plain concrete blinding


@ 150mm spacing

SECTION THRU - B
SCALE 1:75 MTS Engineeri ng Division
DRAW ING TITLE LOCATIO N
RM
CONCRETE WASTE TANK
NEW RAZ AL KHAIR
DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.JUN.19 SCALE: 1 : 75
CONTENTS
PLAN, SECTION A & SECTION B
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
CWT-ST-01 1 OF 1 23
Ope rations Director
Concrete Ped estal Base
5.00

DIESEL TANK
Parapet wall blocks plas tered both sides 20,000 LTS

DIESEL TANK

0.60

1.00
Diesel Tank
7.50

Elev. + 0.20

F. G. L.Elev. 0.00

0.20
2.50 3.00
VERIFY 2.50

A
SECTION “A”
Not To Sca le
DIESEL FILLING AREA PLAN
Not To Sca le

PROJECT TITLE

RM
NEW RAZ AL KHAIR
Engineeri ng Division

DRAW ING TITLE LOCATIO N


DIESEL FILLING AREA KS A

DESIGNED BY : DRAW N BY : A SD
CHECKED BY : REVISION :
DATE : 16.02.2 0 SCALE: 1 : 200 M
CONTENTS
PLAN, DETAILS AND SECTIONS
DRAW ING NO. SHEET NO. PAGE NO. APPROVED BY
DFA-ST-01 1 OF 1 24
Ope rations Director
24.00

1.60 8.40 2.00 2.00 10.00 4.00

1.00

1.00
AC AC AC AC AC
EF W1

CONC.

1.50
CURING TANK CURING TANK PAD

2.50
CURING TANK
TOILET

4.00

4.00
PORTABLE LABORATORY ROOM B

1.00
PORTABLE CURING ROOM W1
TESTING AREA
B D1 B
SHADED

1.50
CURING TANK CURING TANK
D1

W1 W1 D1 W1 W1 D1
1.00

1.00
A

LABORATORY AND CRING ROOM PLAN

ROOF SHEET 0.50MM THICK ALUMINUM FLUSH DOOR


ALLUMINUM SLIDING WINDOW FIRE RATED WALL
WITH ROOF INSULATIONAND CHICKEN WIREMESH

24.00 4.00
RECTAGULAR TUBE 100X50MM

0.30 0.30
2.00 1.50 2.50 1.50 2.50 1.00 0.70 2.50 1.50 2.50 1.50 1.00 SQUARE TUBE 100MM
2.33

0.20

3.53
2.10
1.20

1.00

1.00
CONCRETE RE TA INING WA LL
CURING TANK I NSI DE P ORTA BLE

F. F.L.
RAM P FI NIS HE D S LAB O N GRA DE

0.20
0.20

0.20
ELEVATION TRHU-A

ROOF SHEET 0.50MM THICK


WITH ROOF INSULATIONAND CHICKEN WIREMESH

FIRE RATED WALL RECTAGULAR TUBE 100X50MM

4.00
ALLUMINUM SLIDING WINDOW
1.00 1.00 1.00 1.00

SQUARE TUBE 100MM

Eng ineerin g Division


3.53

3.40

DRA WING TITLE LOCATION

LABORATORY AND CURING ROOM LAYOUT RM


KFFA MAJMAA
1.00

DESIGNED B Y : DRA WN BY : ASD


F. F.L.
CHE CK ED BY : REVISION :
FI NIS HE D S LAB O N GRA DE

DATE : 20.JULY.2 0 SCALE : 1 : 75


0.20

CONTE NTS
PLAN AND SECTION
ELEVATION TRHU-B
DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y

LCR-ST-01 1 OF 2 25
Ope rations Director
ROOF SHEET 0.50MM THICK
FIRE RATED WALL WITH ROOF INSULATIONAND CHICKEN WIREMESH

RECTAGULAR TUBE 100X50MM


GYPSUM CEILING ON STEEL FRAMING
4.00

1.00 1.00 1.00 1.00

0.53
RAFTER IPE 120X64
CEIL INGHEIGHT ELEVATION

1.50 1.00 1.50

3.53

3.40
3.00
CONCRETE

1.00
RET AI NING WALL
CURING TANK

F. F.L.
FI NIS HE D S LAB O N GRA DE

0.20
SECTION TRHU-A

ROOF SHEET 0.50MM THICK


WITH ROOF INSULATIONAND CHICKEN WIREMESH CONCRTE PAD 1.0M X 1.0M X 0.60M
ALUMINUM FLUSH DOOR ALLUMINUM SLIDING WINDOW WINDOW TYPE A/C 2.0 TONS
GYPSUM CEILING ON STEEL FRAMING

24.00 4.00
RECTAGULAR TUBE 100X50MM

12.00 2.00 1.50 4.00 SQUARE TUBE 100MM

CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION CEIL INGHEIGHT ELEVATION
0.70
2.53

3.53
1.30

FIRE RATED WALL


FIRE RATED WALL FIRE RATED WALL

2.10

1.00
1.00

CONCRETE RE TA INING WA LL
CURING TANK

F. F.L.
RAM P FI NIS HE D S LAB O N GRA DE
0.20

0.20
SECTION TRHU-B

Eng ineerin g Division


DRA WING TITLE LOCATION

LABORATORY AND CURING ROOM LAYOUT RM


KFFA MAJMAA
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
DATE : 20.JULY.2 0 SCALE : 1 : 75

CONTE NTS
PLAN AND SECTION

DRA WING NO . SHEET NO . PAG E NO . APP RO VED B Y

LCR-ST-02 2 OF 2
26
Ope rations Director
Steel Rafter
IPE 200x100

Steel Column

1.00
HEB 200x200 Portable Cabin
Fire Rated

AC

DRIVERS ROOM

3.00m.
Fixed Window on
UP
Aluminum Frame
Aluminum Flash Door
1.50m x 1.0m
2.10m x 1.0m
D
Sandwich Wall Panel with
1 Insulation 75mm thick Fire
Rated On Steel Framing
Stair structure as per

3.00
1.00
actual positioning
4.10m.
A

1.00
GROUND FLOOR PLAN
SCALE 1:50 MTS F.F.L.
N.G.L.

0.15
1.30m. 1.50m. 1.30m.
4.10m.
D
DN
1 ELEVATION THRU - A
SCALE 1:50 MTS
AC
3.00m.

PORTABLE BATCH CABIN

Eng ineerin g Division

COMPUTER TABLE DRA WING TITLE LOCATION


RM NEW
DRIVERS ROOM AND BATCH CABIN RAZ ALKHAIR
DESIGNED B Y : DRA WN BY : ASD
CHE CK ED BY : REVISION :
4.10m. DATE : 04.JUNE.2019 SCALE : 1 : 50
CONTE NTS
SECOND FLOOR PLAN PLAN AND ELEVATION
APP RO VED B Y
SCALE 1:50 MTS DRA WING NO . SHEET NO . PAG E NO .
DRBC-ST - 01 1 OF 1 27
Ope rations Director
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.

2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.

3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.

4. ALL M EASUREMENTS ARE SUBJECT FOR SIT E VERIFICATION.

185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .

THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.

KEY PLAN:

173.65
P ORTAB LE A CCOMM ODATI ON

WASTE
DUMPING
AREA

P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON

TRUE NORTH

185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK

S ept ic T ank
TO ILET AND BATH

TOATAL AREA = (+/-) 32,186 M2


MP8
P ORTAB LE A CCOMM ODATI ON 1 Set – 4 x 16mm² CU/XLPE/SWA/PVC TOTAL PERIMETER FENCE = (+/-) 718 LM
E E

ENTRANCE /
EXIT GATE
MUD

MH15 S ETT LING


TANK #02
1 Set – 4 x 16mm² CU/XLPE/SWA/PVC

10.70
PLANT #02
P ORTAB LE A CCOMM ODATI ON

BATCH
MH12 E
P ORTAB LE A CCOMM ODATI ON

CB2 MSB2 17.18


MP5
S weet Wat er Tank E E E ADMIXTURE TANK 1 Set – 3 x 70mm² + 35mm² CU/XLPE/SWA/PVC
MP2 MH11
37.45

BATCH
CABIN
MH2

FOR BP2 Batch Control Panel


2 Sets – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC

AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
FOR MSB2 GENERATOR #0 1
DIESEL TANK

1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC DIESEL TANK

57.90 60.00 GENERATOR #0 2

MH1 GENERATOR #0 3

EDS

GROUND
MH14 MH13

HOOP ER
ROOM

6 Sets – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC


GENERATOR #0 4

17.50
2 Sets – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC

GROUND
BATCH PLANT #03

HOOP ER
FOR FUTURE
CHILLED WAT ER TANK
FOR ICE PLANT
2 Sets – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC

BATCH
CABIN
FOR ACCOMMODATION MP4 FOR CHILLER PLANT

173.65
173.65

GROUND
HOOP ER
2 Sets – 4 x 120mm² CU/XLPE/SWA/PVC MH3 E CH ILLER P LANT

2 Sets – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC

CONTROL SERVICE AREA 01


E
MP3

22.00
FOR BP1 Batch Control Panel
1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC 300 T
300 T RAW WATER TANK

FOR BP1 Mixer Panel


1 Set – 3 x 95mm² + 35mm² CU/XLPE/SWA/PVC RAW WATER TANK

FOR BP1 Plant Panel


MP1 E

S ETT LING
TANK #01
1 Set – 3 x 70mm² + 35mm² CU/XLPE/SWA/PVC 27.00

MUD
CHILLED WAT ER TANK
FOR MSB1 BATCH
CABIN
MH5
1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC

PLANT #01
MH4

BATCH
MSB1E
1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC
1 Set – 4 x 16mm² CU/XLPE/SWA/PVC A DM IX TURE TA NK

300 T 300 T 1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC

32.75
S ILO FOUNDATIO N
E CB1

DOCUMENT DISCLAIMER:
12
11
10

WEIGHBRIDGE
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
REVISION NO.: REVISED BY.: REVISION DATE:
MH6 R E V I S I O N S

WORKSHOP BUILDING
DIESEL FILLING AREA

28.70

VEHICLE PARKING
DIESEL TANK

WA STE
DUMP ING

CONCRETE P ORTAB LE P ORTAB LE O FFI CE


P ORTAB LE CURI NG
TE ST ING ARE A LA BORA TORY

D:\ARCHIE FILES RM RAZ AL KHAIR - SITE DEVELOPMENT PLAN – NEW LAND


ROOM
ROOM
S EP TIC TA NK

E E E Gu ar d
MP7 MP6 Hou se
DRAWING T ITL E:

MH10 MH9 MH8 MH7 MAIN GATE


(IN/OUT) RM NEW
32.00 26.50 24.50

RAZ AL KHAIR PLANT LAYOUT

A C C E S S R O A D LOCATION: RAZ AL KHAIR

185.35 DRAWING TITLE:

MAIN ELECTRICAL DISTRIBUTION LAYOUT


SCALE: 1 : 800 UNIT : METERS

FOR WORKSHOP CONST RUC TION & F AC ILITIES MANAGEMENT DEPART MENT
1 Set – 3 x 120mm² + 70mm² CU/XLPE/SWA/PVC 1 Set – 3 x 25mm² + 16mm² CU/XLPE/SWA/PVC
ARCHITECTURAL & INTERIOR DESIGN WORKS:
FOR OFFICE & LABORATORY CAD BY : DAT E:

1 Set – 3 x 150mm² + 70mm² CU/XLPE/SWA/PVC DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019

CHECK ED BY : E NG R. M OHAM MA D ZA Y ED DAT E: 25-DEC -2019

REFERENCE FIL E L INK:


CHECK ED BY : E NG R. A SHRA F Y OUS EF DAT E: 25-DEC -2019

DRAWI NG NO. : P AGE NO. : FI NAL AP PROV AL:

MAZ
RM__-AD-SDP-01 35 Chief O pera tions Office r

DATE:
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.

2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.

3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.

4. ALL M EASUREMENTS ARE SUBJECT FOR SIT E VERIFICATION.

185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .

THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.

KEY PLAN:

173.65
P ORTAB LE A CCOMM ODATI ON

WASTE
DUMPING
AREA

P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON

TRUE NORTH

185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK

S ept ic T ank
TO ILET AND BATH

TOATAL AREA = (+/-) 32,186 M2


MP8
P ORTAB LE A CCOMM ODATI ON TOTAL PERIMETER FENCE = (+/-) 718 LM

ENTRANCE /
EXIT GATE
MUD

MH15 S ETT LING


TANK #02
1 Set – 4"Ø SCH40 PVC Conduit

10.70
PLANT #02
P ORTAB LE A CCOMM ODATI ON

BATCH
MH12
P ORTAB LE A CCOMM ODATI ON

CB2 MSB2 17.18


MP5
S weet Wat er Tank
1 Set – 4"Ø SCH40 PVC Conduit
MP2 MH11
37.45

ADMI XTURE TANK


BATCH
CABIN
MH2
FOR BP2
1 Set – 6"Ø SCH40 PVC Conduit

AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
2 Sets – 4"Ø SCH40 PVC Conduit DIESEL TANK

1 Set – 4"Ø SCH40 PVC Conduit


GENERATOR #0 1

1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING)


DIESEL TANK

57.90 60.00 GENERATOR #0 2

MH1 GENERATOR #0 3

EDS

GROUND
MH14 MH13

HOOP ER
ROOM

GENERATOR #0 4 1 Set – 6"Ø SCH40 PVC Conduit


2 Set – 4"Ø SCH40 PVC Conduit

17.50

GROUND
BATCH PLANT #03

HOOP ER
1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING)

FOR FUTURE
CHILLE D WA TER
TA NK

BATCH
CABIN
1 Set – 4"Ø SCH40 PVC Conduit MP4
173.65

173.65
GROUND
HOOP ER
MH3 CH ILLER P LANT

CONTROL SERVICE AREA 01


MP3

22.00
300 T
300 T RAW WA TER TANK

FOR BP1
1 Set – 6"Ø SCH40 PVC Conduit RAW WA TER TANK

2 Sets – 4"Ø SCH40 PVC Conduit

S ETT LING
TANK #01
MP1 27.00

MUD
1 Set – 2"Ø SCH40 PVC Conduit(NETWORKING) BATCH
CHILLE D WA TER
TA NK
CABIN
MH5

PLANT #01
MH4

BATCH
MSB1
A DM IX TURE TA NK 1 Set – 6"Ø SCH40 PVC Conduit
300 T 300 T 1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING)

32.75
S ILO FOUNDATIO N
CB1

DOCUMENT DISCLAIMER:
12
11
10
1 Set – 6"Ø SCH40 PVC Conduit

WEIGHBRIDGE
10.80 9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING) REVISION NO.: REVISED BY.: REVISION DATE:
MH6 R E V I S I O N S
1 Set – 4" SCH40 PVC Conduit
1 Set – 2" SCH40 PVC Conduit (NETWORKING)
1 Set – 2" SCH40 PVC Conduit (NETWORKING)
WORKSHOP BUILDING
DIESEL FILLING AREA

28.70

VEHICLE PARKING
DIESEL TANK

WA STE
DUMP ING

CONCRETE P ORTAB LE P ORTAB LE O FFI CE


P ORTAB LE CURI NG
TE ST ING ARE A LA BORA TORY

D:\ARCHIE FILES RM RAZ AL KHAIR - SITE DEVELOPMENT PLAN – NEW LAND


ROOM
ROOM
S EP TIC TA NK

MP7 MP6 Gu ar d
Hou se
DRAWING T ITL E:

MH10 MH9 MH8 MH7 MAIN GATE


(IN/OUT) RM NEW
32.00 26.50 24.50 4.00

RAZ AL KHAIR PLANT LAYOUT

A C C E S S R O A D LOCATION: RAZ AL KHAIR

185.35 DRAWING TITLE:

MAIN NETWORK & ELECTRICAL PIPE


SLEEVE LAYOUT
1 Set – 4" SCH40 PVC Conduit SCALE: 1 : 800 UNIT : METERS
1 Set – 2" SCH40 PVC Conduit (NETWORKING) CONST RUC TION & F AC ILITIES MANAGEMENT DEPART MENT

ARCHITECTURAL & INTERIOR DESIGN WORKS:


1 Set – 6"Ø SCH40 PVC Conduit CAD BY : DAT E:

1 Set – 2"Ø SCH40 PVC Conduit (NETWORKING) DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019

CHECK ED BY : E NG R. M OHAM MA D ZA Y ED DAT E: 25-DEC -2019

REFERENCE FIL E L INK:


CHECK ED BY : E NG R. A SHRA F Y OUS EF DAT E: 25-DEC -2019

DRAWI NG NO. : P AGE NO. : FI NAL AP PROV AL:

MAZ
RM__-AD-SDP-01 36 Chief O pera tions Office r

DATE:
GENERAL NOTES:
1. ALL SITE DIM ENSIONS ARE MEASURED IN MIL LIMETERS UNL ESS ST ATED OTHERWI SE.

2. INDIVIDUAL BUILDING DI MENSIONS & DET AI LS ARE MEASURED IN MILL IMETERS UNL ESS ST AT ED OT HERWISE.

3. ALL ELEVAT ION DIMENSIO NS AND LEVELS ARE M EASURED IN M ILLIM ET ERS UNLESS STATED OT HERWISE.

4. ALL M EASUREMENTS ARE SUBJECT FOR SIT E VERIFICATION.

185.35 5. ALL F ACIL ITIES SHOWN IN T HIS PLAN ARE IN COM PL IANCE TO THE REQUIREMENT O F T HE PRODUCT ION DEPARTM ENT .

THI S DO CUM ENT CONTA INS CONFI DE NTI AL AND P ROPRI ET ARY INF ORMA TION THAT CA NNOT B E REP RODUCE D OR DIV ULG ED, IN WHOLE OR I N P ART, W IT HOUT WRI TTE N A UTHORIZA TI ON FROM T HE CONS TRUCTIO N & FA CILI TIE S MA NAGE ME NT DE P ARTM ENT OF SA UDI RE ADY MI X CONCRE TE CO. LTD.
ANY CHANGES OR REVISIO NS SHOULD BE DONE BY THE ISSUING DEPARTM ENT WI TH THE APPROPRIAT E REM ARKS AND NOT ES
FROM THE RESPECT IVE APPROVING COMM ITT EE. REVISIO NS ARE TO BE DONE ONL Y AFT ER REMARKS ARE RECEIVED.

KEY PLAN:

173.65
P ORTAB LE A CCOMM ODATI ON

WASTE
DUMPING
AREA

P ORTAB LE ME SHA LL
ACCOMMODATION AREA
P ORTAB LE A CCOMM ODATI ON

TRUE NORTH

185.35
P ORTAB LE A CCOMM ODATI ON
TRUCK WASHING AND SETTLING TANK

S ept ic T ank
TO ILET AND BATH

1-2" Ø GI Pipe
TOATAL AREA = (+/-) 32,186 M2

P ORTAB LE A CCOMM ODATI ON TOTAL PERIMETER FENCE = (+/-) 718 LM

ENTRANCE /
EXIT GATE
MUD
S ETT LING
TANK #02 1-3" Ø GI Pipe

PLANT #02
P ORTAB LE A CCOMM ODATI ON

1-2" Ø GI Pipe 1-3" Ø GI Pipe

BATCH
P ORTAB LE A CCOMM ODATI ON
1-2" Ø GI Pipe
1-4" Ø GI Pipe
S weet Wat er Tank

ADMI XTURE TANK


BATCH
CABIN

AGGREGATE STOCKBAY
CONTROL SERVICE AREA 02
DIESEL TANK
GENERATOR #0 1

DIESEL TANK

GENERATOR #0 2

1-3" Ø GI Pipe
GENERATOR #0 3

EDS

GROUND
HOOP ER
ROOM

GENERATOR #0 4

GROUND
BATCH PLANT #03

HOOP ER
1-2" Ø GI Pipe

FOR FUTURE
1-4" Ø GI Pipe CHILLE D WA TER
TA NK
1-3" Ø GI Pipe

BATCH
CABIN
173.65

173.65
GROUND
HOOP ER
1-6" Ø PVC Pipe CH ILLER P LANT
1-6" Ø PVC Pipe

CONTROL SERVICE AREA 01


1-3" Ø GI Pipe
1-2" Ø GI Pipe 1-3" Ø GI Pipe
300 T
300 T RAW WA TER TANK

1-3" Ø GI Pipe 1-3" Ø GI Pipe


RAW WA TER TANK

1-3" Ø GI Pipe

S ETT LING
TANK #01
MUD
CHILLE D WA TER
BATCH TA NK
CABIN
1-4" Ø GI Pipe

PLANT #01
1-3" Ø GI Pipe 1-3" Ø GI Pipe

BATCH
A DM IX TURE TA NK

300 T 300 T

S ILO FOUNDATIO N

DOCUMENT DISCLAIMER:
12
11
10

WEIGHBRIDGE
9 ENGR. ARCHIE SANCHEZ DELACRUZ 22-JULY-2020
REVISION NO.: REVISED BY.: REVISION DATE:
R E V I S I O N S

1-3" Ø GI Pipe

WORKSHOP BUILDING
DIESEL FILLING AREA

VEHICLE PARKING
DIESEL TANK

WA STE
DUMP ING

CONCRETE P ORTAB LE P ORTAB LE O FFI CE


P ORTAB LE CURI NG
TE ST ING ARE A LA BORA TORY

D:\ARCHIE FILES RM RAZ AL KHAIR - SITE DEVELOPMENT PLAN – NEW LAND


ROOM
ROOM
S EP TIC TA NK

Gu ar d
Hou se
DRAWING T ITL E:

MAIN GATE
(IN/OUT) RM NEW
185.35 RAZ AL KHAIR PLANT LAYOUT

A C C E S S R O A D LOCATION: RAZ AL KHAIR


DRAWING TITLE:

WATER PIPE LINE LAYOUT


SCALE: 1 : 800 UNIT : METERS

CONST RUC TION & F AC ILITIES MANAGEMENT DEPART MENT

ARCHITECTURAL & INTERIOR DESIGN WORKS:


CAD BY : DAT E:
1-2" Ø GI Pipe 1-2" Ø GI Pipe 1-2" Ø GI Pipe 1-2" Ø GI Pipe DES IG NE D B Y: E NG R. A RCHI E S ANCHEZ DELA CRUZ DAT E: 25-DEC -2019

CHECK ED BY : E NG R. M OHAM MA D ZA Y ED DAT E: 25-DEC -2019

REFERENCE FIL E L INK:


CHECK ED BY : E NG R. A SHRA F Y OUS EF DAT E: 25-DEC -2019

DRAWI NG NO. : P AGE NO. : FI NAL AP PROV AL:

MAZ
RM__-AD-SDP-01 37 Chief O pera tions Office r

DATE:
Heavy duty Manhole cover

0.20 0.80 0.20


Finished Slab on Grade level

0.60
PVC Conduit pipe sleeve Concrete Hollow Blocks 200mm thk.,
filled with mortar, with 8-10mm dia. vert.
dowel and 4-10mm dia. Ring and

0.80
Plastered Inside Wall
A

0.80
1.20

Concrete Base
PVC Conduit pipe sleeve

0.12
Heavy duty Manhole cover
Filled with fined Sand
0.30
Concrete Manhole Wall

SECTION “A”
MANHOLE DETAIL (MH) NTS

SCALE NTS

Trench for Electrical 500mm (W) x 600mm (D)


Covered by 6mm thick Steel Plate with Angle Bar Framing
0.15m

F.F.L.
10m mØ Bars
10cm 50cm 10cm

F.F.L.
0.60 m.

Underground Electrical Wires


20cm
Or Water Lines
EL. 0.00
60cm
10cm

SECTION
NTS

PROJECT TITLE:

ELICTRICAL LINE DETAIL RM


(EXCAVATION AND BACKFILL) OPEN TRENCH DETAIL NEW RAZ AL KHAIR

SCALE NTS SCALE N.T.S. Engineering Division LOCATION: MARJAN GAS PROJECT

DRAWING TITLE : MAIN ELECTRICAL AND NETWORK MANHOLE

ARCHITECH :
CIVIL ENGINEER : ENGR. ARCHIE DELACRUZ DATE : 01.07.20

ELECTRICAL ENGINEER : SCALE 1 : 800 M

DRAWING NO. : MH-01-01 SHEET NO . : 1 O F 1 PAGE NO : 3 8 DATE : 01.07.20

You might also like