You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12

SHEET 32

A A

NOTE: KEY PLAN


GENERAL NOTES:
3
B B
A- LEVELS OF MH1 FOR EACH PLOTS ARE PROPOSED LEVELS WITH STAGE
1(TYPE-D) & STAGE 2(TYPE-A/B/C) HOUSE CONNECTIONS .
B- DETAILS OF HOUSE CONNECTION ARE ALSO ATTACHED ALONG WITH THIS
SHOP DRAWINGS AS A TABLE.
3 B- THIS SHOP DRAWING IS FOR PROPOSED FS LINE AND HOUSE
“ ”

CONNECTIONS RELATED TO IT ALONG LATEST ROAD LAYOUT.


“ ”
3 D- ALL COVER LEVELS AS PER LATEST REVISED ROAD PROFILES.
3 3
C C- THIS SHOP DRAWING IS FOR COVERING ROAD E499/ E500/ E501/ E502/ C

E503/ E504/ E505/ E506/ E507 & 508. LEGEND:

D- NO CHANGES MADE FOR MANHOLES OR HOUSE CONNECTIONS AT ROAD

4 # E499/E500 & E507, WHICH ARE ALREADY BEEN APPROVED BY GEC AS


REV 00, VIA TRANSMITTAL # DN099-P02-KEO-QBC-TRN-1335

5
3 6
D D

3 3

01 02AUG22 UPDATED FOR RD E501/502/503/504/505/506 & 507SR PE MT

3 00 26JUN22 SUBMIT FOR APPROVAL SR PE MT


E E
Rev. Date Revision Details Drawn Chkd. Appd.

Design Consultant : Supervision Consultant :


HYDER CONSULTING
Middle East Limited
P.O. Box 1854
Doha, Qatar

3 2 Tel: +974 4424 5000


Fax: +974 4424 5001 P.O. Box 18108, Doha Qatar, F
F www.hyderconsulting.com C-Ring Road at Al-Mana Intersection,
Doha , Qatar
Tel: (974) 4626400, Fax:(974)4626500
web: http://www.keoic.com
email: info@keoic.com

Main Contractor :
3
Qatar Building Co.
P.O. Box: 1985, Doha, Qatar
Tel: (+974) 44625555/44625556
Fax: (+974) 44625522/44625544
Website: www.qbc.qa

Project Name:
1
ROADS & INFRASTRUCTURE
IN AL EBB & LEABAIB,
PACKAGE 02
G G

Project Code:
IA 2019 C 053 G
Status:
SHOP DRAWING
Drawing Title:

FOUL SEWER LAYOUT PLAN


ROAD E499/E500/E501/E502/E503
E504/ E505/ E506/ E507 & E508
Sheet 32
H Drawn:
SACHITTRA,R
Checked:
PRAKASH, E H

Designed: Approved:
- M.TALEB
Date: Scale:
OCTOBER 2020 1:1000 on A1
Drawing Number: Revision:

DN099-P02-QBC-SH-FS-1332 01
1 2 3 4 5 6 7 8 9 10 11 12
V1

You might also like