Project : PROPOSED DESIGN AND INSTALLATION OF 12kW PVC SOLAR HYBRID SYSTEM
Location :
Owner :
DIRECT COST
A TOOLS AND EQUIPMENT (RENTAL) 1 LOT 9,800.00 9,800.00 9,800.00
(Grinder, Drill, Ladder, Scaffolding, etc)
Sub-Total 567,333.00
NOTE/REMARKS
1.0 Net Metering application is not included in the estimate.
2.0 Additional cost in the application of net metering will be based on the requirement by utility provider.
Prepared by :