Sl No. Document Title: FP Comments FP reply to RE4 25.09.23


1 Please submit the document "TJ-02/T/06013/3" Already submitted
2 1.2 - Please submit the transfomer data sheet with technical detail Already submitted
3 The capcity of the oil pit should be 150% opf the transformer oil volume. For common oil collecting pit is not required.
4
BURNT OIL PIT DESIGN - R0