You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

<>
02 DD LS1GPP2 S01 CABINET AP17CAB ARCH 1:100

REV. SHEET NO. PHASE ZONE NO. SITE CODE PROJECT NO. SCALE ORIGINATOR
<>
FOR CONTINUATION REF

FOR CONTINUATION REF

FOR CONTINUATION REF

FOR CONTINUATION REF


TO SHEET AE1LGZ4

TO SHEET AE1LGZ4

TO SHEET AE1LGZ4

TO SHEET AE1LGZ4
MATCH LINE

MATCH LINE

MATCH LINE

MATCH LINE
R
X:\18_006-CCC&COC\2.0_DRAWINGS\LANDSCAPE\6- CURRENT PRODUCTION\SHEETSET\ARCH-2423-03A-04A-G01-L-S-1-GP-P2-DD-01

Q
Q

LANDSCAPE CONSULTANT
ARCHIMID ARCHITECTS
GLENN PATTEN ASMAA EL GOWENI
Gr. Floor, 12 Tunis Street, New Maadi, Cairo, Egypt
Tel: + (202) 27538310 Fax: + (202) 27538091
Email: info@archimid.com Website: www.archimid.com

STRUCTURE CONSULTANT

EL. 301.87
N GRD F.F.L. N

MEP CONSULTANT
SHAKER CONSULTANCY GROUP
Meerag City, Cairo Ring Road, buildings 2075-2078, Maadi,
Cairo, Egypt
Tel: + (202) - 5204500 - Fax: + (202) - 5204505
E-mail: info@shakeregypt.com

GENERAL NOTES
- ALL DIMENSIONS TO BE VERIFIED ON SITE AND APPROVED BY
THE ENGINEER.
- CONTRACTOR TO CHECK AND COORDINATE ALL ARCHITECTURAL,
M STRUCTURAL AND ELECTROMECHANICAL WORKS AND SUBMIT M
WORKSHOP DRAWINGS FOR APPROVAL BEFORE CONSTRUCTION.
- THE DRAWING SHOULD BE READ IN CONJUNCTION WITH OTHER
RELEVANT ARCHITECTURAL, INTERIOR, STRUCTURAL, MECHANICAL,
ELECTRICAL AND SPECIAL SYSTEMS DRAWINGS AND ALL RELEVANT
SECTIONS OF THE SPECIFICATIONS.
- THE CONTRACTOR WILL BE RESPONSIBLE FOR INTERPRETATION OF
THE DESIGN SHOWN ON THIS DOCUMENT OR REASONABLY IMPLIED
R
FROM IT. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL ALL
NECESSARY INTERPRETATION, DEVELOPMENT, FABRICATION AND
SHOP DRAWINGS TOGETHER WITH SAMPLES AND ASSEMBLIES, AS
L
REQUIRED BY THE ARCHITECT, TO DEMONSTRATE UNDERSTANDING
OF THE DESIGN INTENT AND THE MEANS TO EXECUTE THE WORK TO
ACHIEVE IT. THIS SHALL BE PART OF THE CONTRACTORS GENERAL
OBLIGATIONS AND SHALL BE DEEMED INCLUDED AND APPLICABLE TO
ALL SUB-CONTRACTORS AND SUPPLIERS DIRECTLY ENGAGED OR
NOMINATED.
- THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATION WITH ALL
TELECOMMUNICATION AND AUDIO VISUAL EQUIPMENTS DURING SHOP
K
DRAWINGS PREPARATION AND BEFORE SITE EXECUTING AND THE
DRAWINGS SHALL BE APPROVED FROM THE CONCERNED PARTIES.
K - REFER TO STRUCTURE DRAWINGS FOR ANY CONCRETE OR STEEL
DIMENSIONS.
EL. 302.750 EL. 301.250
GRD F.F.L. GRD F.F.L. NOTES
F

J J

H H

G G

KEY PLAN
Sunday, December 23, 2018 3:36:10 PM

1.3 23.1 1-1 24.4


CCC CCC coc coc

A-1 A-1
coc coc

PART 01 PART 02

PART 02 PART 03
E B
-

+301.00
T.O.S

A
-

PART 04 PART 05 PART 06


N 812188.273
E 686881.438

Q Q
coc coc
Sheet size - ISO A0 (841* 1189 mm)

1.3 23.1 1-1 24.4


CCC CCC coc coc

2
LI002XX
D D

02 23-12-2018 ---- M.N. M.N. R.A. H.B.


01 13-12-2018 ---- M.N. M.N. R.A. H.B.
C 00 2-12-2018 ---- M.N. M.N. R.A. H.B.
REV C
DATE ISSUED FOR DRW CHK TL PM
100 mm

PROJECT DATA:

NEW CAPITAL-GOVERNMENTAL DISTRICT


CCC AND COC BUILDINGS
DISCIPLINE
B LANDSCAPE
50 mm

B
SHEET TYPE
GENERAL PLANS
EL. 302.750 EL. 301.250
Scanning scale

GRD F.F.L. GRD F.F.L. SHEET TITLE


GRADING PLAN PART 2
.
SCALE ORIGINATOR PROJECT NO. SITE CODE BUILDING NO. SHEET NO. PHASE REV.
10 mm

A A GRADING PLAN PART 2 . 1:100 ARCH 2423 03A_04A S01 LS1GPP2 DD 02


LS1GPP2
1:100 A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

You might also like