You are on page 1of 1

B2

A B C A B C
6.0000 4.0000 6.0000 4.0000
7.0496
2.9504

10.0000
10.0000
1

1
1.1
1.2

ICT, Automation, FCD FCD


Server Room
ELECTRICAL DEPARTMENT OF BUILDING
ROOM
OFFICIAL OFFICE ROOM
Security and Surveillance PLUMBING & MECHANICAL
Room ROOM
JP
2
UNDERGROUND WATER TANK
TOTAL CAPACITY: 40 CU. M.
5.9721 FP
1
DIMENSIONS: 300MM X 200MM 5.9721
5.3491 RISER RISER
4.9597
CAFETERIA JP
2

MEN'S TOILET MEN'S TOILET


WOMEN'S TOILET

WOMEN'S TOILET
2

2
JANITOR'S JANITOR'S TO 2ND FLOOR JANITOR'S JANITOR'S TO 3RD FLOOR
LOUNGE LOUNGE LOUNGE LOUNGE
B.I. PIPE SCH. (100MM) B.I. PIPE SCH. (100MM)

COFFEE
AREA COFFEE AREA
4.3058

0.2000

6.5000
19.0000 1900
FIRE EXIT FIRE EXIT 18.0000
3

3
18.4006
MAIN
STAIRS STAIRS
ELEVATOR ELEVATOR
MECHANISM 8 MECHANISM 8
7 9 7 9
6 10 6 10
5 11 5 11
ELEVATOR 12 ELEVATOR 12
4 4
3 13 3 13
2 14 2 14
1 15 1 15
16 16

8.6942

HEAD
OFFICE LOUNGE OFFICE ROOM
ROOM AREA
6.5000

LOBBY/ RECEPTION
LOBBY/ RECEPTION
AREA AREA
4

4
GROUND FLOOR SPRINKLER LAYOUT SECOND FLOOR SPRINKLER LAYOUT
SCALE 1:100 MTS SCALE 1:100 MTS

NAME PROJECT-TITLE SHEET CONTENT SHEET NO.

ABREA, GERMIE ANN A. 5-STOREY CIVIC CENTER BUILDING


GROUND FLOOR SPRINKLER LAYOUT M2
SCHOOL SUBJECT-SECTION PROFESSOR DATE SECOND FLOOR SPRINKLER LAYOUT
NEW ERA UNIVERSITY BTECH 3 - 3AR2 AR. MARK DELFIN DEC. 16, 2023 1 of 1

You might also like