You are on page 1of 966
AN INTERNATIONAL CODE 2007 ASME Boiler & Pressure Vessel Code Pa Tha OP I Part C Specifications for Welding Rods, Electrodes, and Filler Metals MATERIALS ASME Boiler and Pressure Vessel Committee Subcommittee on Materials Ce US a Mechanical Engineers Date of tess: July 1, 2000 [lnctodes ll Ader dite Js 20% and eae ‘This international code or standard was developed under procedures acre a meeting the rites for American Nato Standards and itis an American National Sudan. The Standards Comes that approved the cee oe standard as Blane 'o assure that individuals fom competent apd concemed interests have ha an epportaity& patcpat. The prose we ‘or standard was made avaiable for pubic review and coment hat provides portunity fe akties pb mp Inn Indus academia, equlaory agencies, andthe publc-at bre. |ASME does not “approve.” "ate," ee “endorse” any em. contraction, propmetary device, or acy [ASME doesnot tke any postion with respect to the vali of ny pent igs essere in connection i aay ies rmentane inthis document, apd does oe underike 10 inure anyone ulizing a Mandar apse Hey Io inking any applicable levers patent me assume any sch lisbiiy, Users of a ce or ard ae expres ane that determination fF the valty of any such patet igh. andthe Fisk of iangemen! of sich nigh, emt their wun respons Panicipation by federal agency repeesentative(st of persons aiated with sty sna oe interpre 3 ensernent or indas’y endorsement of this code or standard [ASME acceps responsibilty for oly those nterreatons ofthis document sed ina pecedares and policies, which precines the Hence of ntxpstatons by vas dance wih the eatablstod ASME ‘The foumotes in this document are pat ofthis American Nations Sided ASME collctixe membership mark The above ASME st (NI (t] fi 1 15, Patent Office bare registred in the ASME" isthe uademark ofthe Amencin Society uf Mechanical Engineers The Speitcations published and copyrighted by the American Welding Soe ue epenaced wih the Society's permis, No part ofthis document aay be erence my form, in vaherae ttt the phe wien permesien ofthe publisher Liars ot Congress Catalog Cant Number: $6303 Parte im the Unite States of Aes Adoyed hy the Couns of tae Amerson Soscty of Meshal Engineers, 1914 Revised 1940, 1941, 1943, 1p, 1989, 1952, 1953, 1986, 1959. 1962, 1968, 2968, TH. TE, 1097, 1960, 19KR, Nb 19, 19901998, 19K, 200, 240, 207 The Amencan Sovity of Mecham aginsers “Tyee Patk Avenue, New York, NY 1016-5990 Copyright © 2009 by THE AMERICAN SOCIETY OF MECHANICAL, ENGINEERS W Rights Reseront 2007 ASME BOILER AND PRESSURE VESSEL CODE SECTIONS 1 W XI Rules for Construction of Power Boilers Materials Pan A — Ferrous Material Specifications Part B — Nonferrous Material Specifications Part C — Specifications for Welding Rods, Hectrodes, and Faller Metals Part D — Properties (Customary) Part D — Properties (Meteic! Rules for Construction of Nuclear Facility Components Subsection NCA — General Requirements for Division | and Division 2 Division 1 Subsection NB — Class 1 Components Subsection NC — Class 2 Components Subsection ND — Class 3 Components Subsection NE — Class MC Components Subsection NF — Supports Subsection NG — Core Support Structures Subsection NH — Class 1 Components in Elevated Temperature Service Appendices Division 2 — Code for Concrete Containments Division 1 — Containments for Transportation and Storage of Spent Nuclear Fuel and High Level Radioactive Material and Waste Rules for Construction of Heating Boilers Nondestructive Examinatio Recommended Rules for the Care and Operation of He: Ree ninended Guidelines for the Care af Power Boilers Raley for Construction of Pressure Vessels Division 1 Division 2 — Alternative Rules Division 7 — ARernative Rules for Construction of High Pressure Vessels Welding and Brazing Qualitications Fiber Reinforced Plastic Pressure Vessels Rules for Inservice Inspection of Nuclear Power Plant Components Rules for Construction and Continued Service of Transport Tanks. ADDENDA Colored-sheet Addenda, which include additions and revisions to individual Sections of the Code, are published annually and will be sent automatically to purchasers of the applicable Sections up to the publication of the 2010 Code. The 2007 Code is available only in the loose-leat format; accordingly, the Addenda will be issued in the loose-leaf, replacement-page format. INTERPRETATIONS ASME issues written replies to inquiries concerning interpretation of technical aspects of the Code. The later- pretations for each individual Section will be published separately and will be included as part of the update service to that Section. Interpretations of Section Ill, Divisions | and 2, will be included with the update service to Subsee- tion NCA, Interpretations of the Code are distributed annually in July with the issuance of the edition and subse- quent addenda, Interpretations posted in January st weluded in the www.cstools asme.orgiinterpretations are July distribution, CODE CASES ‘The Boiler and Pressure Vessel Committee meets regu- larly to consider proposed additions and revisions to the Code and to formulate Cases to clarify the intent of existin requirements cr provide. when the necd is urgent, rules for materials or constructions not covered by existing Code rules. Those Cases that have been adopted will appear in the appropriate 2007 Code Cases book: “Boilers and Pressure Vessels” and “Nuclear Components.” Supple- ments will be sent automatically to the purchasery of the ‘Code Cases hooks up to the publication of the 2010 Code. Foreword Statements of Policy Personnel AWS Personnel Suby Preface Summary of Chan; NTS al of Technical Inquiries sine on Approval of New Material List of Changes in BC Order Specifications SEA-S.O1 SEA-5, ISFA-S.IM SEAS.2 SFA-S.SFA-S.2M SEA-54/SFA-S.4M. SEA-5.SISFA-S.5M SEAS.6 SEAS7 SFA-S.NSEA-S.4M SPA-S./SFA-S.OM SFA-5.10/SFA-S 10M SPA-S5.[/SFA-S.1IM SBA-S.IYSFA-S. 2M SEAS. SPA-S.I4/SFA-3.14M SEAS.AS SEA-S.16/SFA-S.16M SFA-S.1T/SFA-S.17M SPA-S.18/SFA-5.18M SFA-5.20/SFA-5.20M SPA-S21 SFAS.22 SEA-S.28SEA-5.23M SFA-5.24SFA-$.24M SEA-5.25/SFA-5.25M SEA-5.20/SFA-5.26M SFA-5.28/SFA-5.28M SFA-S.29/SFA.5.29M SEA-5.30) Filler Metal Procurement Guidelines Carbon Steel Electrodes for Shielded Metal Ane Weldinu Carbon and Low -Mlloy Steel Rods for Oxyfucl Gas Welding Alumiaum and Aluminum-Alloy Electrodes tor Shielded Metal Arc Welding Stainless Steel Electrodes tor Shielded Metal Are Welding Low-Alloy Steel Blectrodes for Shielded Metal Are Welding Covered Copper and Copper Alloy Are Welding Electrodes Copper and Copper Alloy Bure Welding Rods and Electrodes Filler Me ui Brae Welding. Bare Sti Electrodes and Rods. ectrodey and Rods. Tungsten and Tunyster-alloy Electrodes tor Are Welding and Cutting Surfacing Electrodes for Shielded Metal Are Welding Nickel and Nickel-Alloy Bare Welding Electrodes and Rods Welding Electrodes and) Reds for Cast trom Titanium and Titanivm-Alloy Welding Electrodes and Rody Carbon Steel Electrodes and Fluxes for Submerged Are Welding Carbon Steel Flectrodes and Rods for Gas Shielded Ate Welding Carbon Steel Electrodes tor Flux Cored Are Welding Bare Electrodes and Rods tor Surfacing aintess Stec\ Electrodes tor Flux Cored Arc Welding and Stainless Stee! Flux Cored Rods for Gas Tun, Low-Alloy Steel Flectrodes and Zirconium and Zirconiun-Abloy Welding Electrode Carbon and Low-Alloy Sicel Electrodes and Pluxes for Electreslag Welding Carbon und Low-Alloy Steel Electrodes for Electrogay Welding Low-Alloy Stee! Electrodes and Rods for Gas Shielded Are Welding Low-Alloy Steet Electrodes for Flux Cored Are Welding Consumable Inserts avs ” 78 sos 185 15 bss 2h 237 263 wr 308 M5 363 408 a7 461 485 321 565 589) Ory ob 6st SFAS31 SFA-5.32/SFA-5.32M MANDATORY APPENDIX. Appendix I Fluxes for Brazing and Braze Welding Welding Shielding Gases: Standard Units for Use in Equations oy 709 FOREWORD ware boilers and wxher pres sure vessels, This committee is now called the Boiler and Pressure Vesse] Committ ‘committee in 191 for the parpose of formulating St hes fi th The Committee’s function is to establish rules of safety only to pressure integrity. governing the construc tion! of boilers, pressure vessels, transport tanks and nuclear components, and inservice inspection for pressure fy of nuclear components and transport tanks. snd expret these rules when questions arise regarding the ‘This code does not address other safety issues relat. iit to the construction al boilets, pressure vessels, transport tanks and nuclear components, and the inservice inspection fof nuclear components and transport tanks. The user of the Code should refer other pertinent codes, standards, Jess, regulations. oF other relevant documents, With few texveplions, the rules do not of practical necessity, reflect the likelihood snd consequences of deterioration in service related to specific service fuidls or external operating envi- ronments. R ng this, he Committee has approved auvwide variety of eonsteuction rules inthis Section to allow the user or his designee to select those which will provide ‘a pressure vessel having a margin for deterior vice so as to give a reasonably long. sate per Iusiness, Accordingly. it is not intended that this Section housed asadesign handhook: rather, engine judgment must he employed in the selection of those sets of Code rules suitable 10 any specitic service or need latory: requirements, specific prohibitions, and nonmandatory guidance for construction activities, The Code dies not address all aspects of these tctivities and those aspects which are not specitically addressed should not be considered prohibited, The Code is nora handbook and cannot replace education, expeti- cence, and the use of engineering judgment, The phrase ‘engineering judgment refers to technical judgments made by knowledgeable designers experienced in the appli fof the Code. Engineering judgments must be cor with Code philosophy and such judgments must seve he used « overrule mandatory requirements. oF specific prohibitions of the Cod This Code contains ma tion ‘Comiraston ss wsed inthis Foreword 6 a al toh ey proving mitra desig Tbs eivaton, and pressure rel, Inspection, esi The Committee recognizes that tools and techniques used for design and analysis change as technology prog ood judgment in the application of these tools, The designer is responsible for ‘complying with Code gules and demonstrating compliance swith Code equations when such equations are mandatory: ‘Tae Code neither requires nor prohibits the use of compat ces for the design or analysis of components constructed nts of the Code. However, designers and ~ using computer programs for de are cautioned that th esses and expects engineers 10 ase to the requir gn or analysis ¥y are reyponsible tor all technical iplions inherent an the progsams they use and they sponsible for the application wf these programs 10 their design The Crde does not fully address tolerances, When dimensions, sizes. or other parameters are not speeitied wees the values ot these AV and allowable toleranees or local variances may he considered seceptable when based on engineering judgment and standard practices as determined by the designer The Boiler and Pressure Vesse! Committ the care rameters are consid deals with od inspection of boilers and pressure vesse service only to the extent of providing suggested mules of good practive as an aid Ws ovwmers and their inspectors, The rules established by the Committee ure not to be interpreted us approving, recommending. or endors proprictary or specitic design of as limiting in amy way the Imanufueturer’s freedom te choose any method of design orany form of construction that conforms to the Coxle rules, The Boiler und Pressure Vessel Committee meets re larly to consider revisions of the rules, ew rules as dictated by technological development, Code Cases. and requests for interpretations, Only the Boiler and Pressure Vewset ‘Committee has the authority to provide offic tions of this Code. Requests for tevisions. new rules. Code Cases. or interpretations shall be addressed (0 the Secretary in writing and shall give full particulars in order to receive consideration and aetion «see Mandatory Appendix cov- preparation of technical inyuiries). Proposed revi Sion to the Code resulting trom inquiries will be presented to the Ma xe action, The action ain Commitee becomes effective only after con. Firmation by letter ballot of the Committee and approval by ASME Proposed revisions tothe Code approved by the Commit tee are submitted to the Americun National Standards Insti tute and published at hitp://stools.asme.org/esconnect! public/index.cfm?PublicReview = Revisions to invite com. ‘ments from all interested persons. After the alloted time for public review and final approval by ASME, revisions ate published annually in Addenda to the Code Code Cases may be used inthe construction of compo- nents to be stamped with the ASME Code symbol begin- ning with the date of their approval by ASME. After Code revisions are approved by ASME, they may be used beginning with the date of issuance shown on the Addenda, Revisions, except for revisions to material specifications in Section Ul, Parts A and B. become manda- tory six months after such date of issuance, except for boilers or pressure vessels contracted for prior to the era of the six-month period. Revisions to material specific tions are originated by the American Society for Testn and Materials (ASTM) and other recognized national or intemational organizations, and are usually adopted by ASME, However, those revisions may or may not have any effect onthe suitability of material, produced to earlier editions of specifications, for use in ASME construction, ASME material specifications approved for use in cach construction Code are listed in the Guidelines for Accept able ASTM Editions in Section Il, Parts A and B. These Guidelines list, for each specification, the latest edition adopted by ASME, and earlier and later editions vonsidered by ASME to be identical for ASME construction The Boller and Pressure Vessel Committee in the formu lation of its rules and in the establishment of maximum design and operating pressures considers materials, con- struction, methods of fabrication, inspection, and safety devices, ‘The Code Commitee does not rule on whether a compo: nent shall or shall not be constructed to the provisions of the Code, The Scope ofeach Section has been established to identify the components and parameters considered by the Commitee in formulating the Code rules. Questions or issues regarding compliance of a specie component with the Code rules are to be directed to the ASME Certificate Holder (Manufacturer). Inquiries con- ceming the interpretation of the Code are to be directed to the ASME Boiler and Pressure Vessel Committee ASME is to be notified should questions arise concerning improper use of an ASME Code symbol, ‘The specifications for materials given in Section IT are identical with or similar to those of specifications published by ASTM, AWS, and other recognized national or interna tional organizations. When reference is made in an ASME. ‘material specification to a non-ASME specification for which a companion ASME specification exists, the refer ence shall be interpreted as applying to the ASME. material specification. Not all materials included in the materi specitications in Section I have been adopted for Code use. Usage is limited t0 those materials and grades adopted bby atleast one ofthe other Sections of the Code tor applic tion under rules of that Section, All materials allowed by these various Sections and used for construction within the scope of their rules shall be furnished in accordance with material specifications contained in Section Ilor referenced in the Guidelines for Acceptable ASTM Editions in Section I, Parts A and B, except where otherwise provided in Code Cases or in the applicable Section of the Code, Materials covered hy these specifications are acceptable for use in items covered by the Code Sections only the degree indicated in the applicable Section. Materials for Code use should preferably be ordered, produced, and documented ‘on this basis: Guideline for Acceptable ASTM Editions in Section Il, Part A and Guideline for Acceptable ASTM Editions in Section Il, Part B list editions of ASME and year dates of specifications that meet ASME requirements ‘and which may be used in Code construction, Material produced to un acceptable specification with requirements different from the requirements ofthe corresponding spect fications listed in the Guideline for Acceptable ASTM. Editions in Part A or Part B may also be used in acvordane, ‘with the above, provided the material manufacturer or ves sel manufacturer certifies with evidence acceptable t0 the Authorized Inspector that the corresponding requirements ‘of specifications listed in the Guideline for Acceptable ASTM Faitions in Part A or Part B have been met. Material produced 10 an acceptable material specification is. not limited as to country of origin. When required by context in this Section. the singular shall be interpreted as the plural. and vice-versa: and the feminine, masculine, or neuter gender shall be treated as such other gender as appropriate STATEMENT OF POLICY ON THE USE OF CODE SYMBOLS AND CODE AUTHORIZATION IN ADVERTISING ASME has established procedures to authorize qualitied ‘organizations to perform various activities in accordance nh the requirements of the ASME Boiler and Pressure ‘Vessel Code. Itis the ain ofthe Society to provide recogni sion of organizations so authorized. An organization hid ing authorization t perform various activities. in accordance with the requirements of the Code anay state ity in its advertising literature. ations that are authorized use Code Symbols Jor marking items or constructions that have been con= stnucted and inspected in compliance with the ASME Boiler and Pressute Vessel Code are issued Certificates of Autho- ication, It isthe aim of the Society to maintain the standi bof the Code Symbols for the benetit of the users. the enforcement jurisdictions, and the holders of the xgmbols who comply with all requi Based an these objectives, the following policy has been established on the usage in advertising of facsimiles of the symbols, Certificates of Authorization, and reference 1 Code construction, The American Society of Mechanical Engineers does not “approve.” “certify.” “endorse” any item, ‘and there shall bbe no statements or implications that might so indicate. Aw canization holding a Code Symbol and/or a Cerificate of Authorization may’ state in axivertising literature that items, ‘eonstructions, oF aeWsities “are built (produced or per formed) or activities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code.” or “meet the requirements of the ASME Boiler and Pressure Vessel Code.” The ASME Symbol shall he used only for stumping and plates as specifically provided in the Code. However, tagsimiles may be used for the purpose of fostering. the tuse of such gonstructinn, Such usage may be by an associa tion oF a society. or by a holder of a Code Syinbol whe may also use the facsimile in advertising «© show that eins will eaery the symbol. General usage ited only when all uf a manufacturer's items are ceonsteucted under the rules The ASME loge. which is the cloverleat with the letters ASME within, shall not be used by any onanization other than SME struction. oF activin STATEMENT OF POLICY ON THE USE OF ASME MARKING TO IDENTIFY MANUFACTURED ITEMS “The ASME Boiler and Pressure Vessel Code provides «for the construction of boilers, pressure vessels. and ‘components, This includes requirements for ante rials, design, fabrication, examination, inspection, and stamping. Items constructed in accordance with all ot the plicable rules of the Code are identified with the official nJe Symbol Stamp deseribed in the governing Section of the Code. Markings such as "ASME, fotner marking including ASME Stand! \SME" or the various. Code Symbols shall not be used on any item that 3s not con structed im accordance with all of the applicable require ments of the Code. ems shall not be described on ASME Data Report Forms nor on similar forms referring to ASME that tend to imply that all Code requirements have been met when, in fact, they have not been, Data Report Forms covering, stems not faly complying with ASME requirements should not reter to ASME of they’ should clearly identify sllexcep tions to the ASME requirements PERSONNEL ASME Boiler and Pressure Vessel Committee Subcommittees, Subgroups, and Working Groups MAIN COMMITTEE 6G. aches, Cnr Uk Miler VG Teldstern Vice Choir PLA. Motiv Sonomabiwies, Sweety C.€. Newly 8 W. Bares WE Nas # Basie GC Pa how TP Pastor nt MD. Rone MON. fever BW Roberts DA Canon FoI Sehasl Ie WP Doubler A sela DA. Deuin RW. Saayne Carpe DF Tanner Gold S.V. Vourhees Tb Hansen FA Kovacs. Altona (L Mostmann ROA. soon Honora 1. F. Linders wemine WM Lund 1. Tahara, Dela 1K sae kas EXECUTIVE COMMITTEE (MAIN COMMITTEE) 1G beldsein, Chair T.P Pastor 6G hareher Vice Chae A Selz 1S Gerusehwwiez, Secretary D.C Tanner kW Marne B.A Canonico, E-Otti DA Berger Member Go IM. Kath, P-Oficie Meri HONORARY MEMBERS (MAIN COMMITTEE) fron At HL Jawad 0. Konner Af ttn X Henna EL. Kemmier KL coplach WG. kowecht LL Choke bet 1M Callen 1G MCs Ww. D Dow GC Milman 18 Farr HT Revel GE Feige W. Somers KC Gato Kx Tom 0. Hexlden TP Zick Ie EL Hemey 20 HONORS AND AWARDS COMMITTEE 18 Sakis, Chair Wo Haag, Av Gell, Vice he Sh Hates, je G-Man, Seeretar RA Hesse RI Bast Wo Lama elle 1 Batey TPs Dot Renu a Sie 16 Fel RR Ste FF Gor [MARINE CONFERENCE GROUP HLS. Pad Chae LW Daath RI Petow CONFERENCE COMMITTEE 1A Destin Minas Cate DU, Cook Calternia R10. Ret — North Dakota R.A Coomes — Kentucky Vice Ct D Cavan Nesieunclind Db Tanner be se Cabra seen G1 thever — Lean Ry Al F- Michgin Es Fueret Geta Ts. Aclau = Calera [xt Given d= Noth AE Adkins = Went Vigna Cantina Po hackord = Uta 4 FA Andsson Minos RL Handy» Kerth FR aan = Cregeen [OB Harlan = Orlane HP. Amony — Rhus and M4. 1. Holloway — Oxlahoma RD Ain Colona Hynes — Princ Edwarl W.Bavheller Nunavut, land, Canada Cana DT lagger — Ohio Ao Me Birber = Siehigan BL Tenens — Kansas RW Hasler Anzona Shite — Beitsh Columbo, FP, Barta — Ving Cina Bishops — British M1 Kath — CQuedes ‘Colum, Cana Ko EoLau Alben Canads WK drgham New NLA. Maloh = Flee Hamyainie CoP Manke! — Nevada DE. Sunss — Nebraska Ro1) Mawr Washingion Lh Burpee = Sane W. Sault sania CL Castle Nea Set, onda omit HOT MEBs Sts pp Pear Conkn = New Sori ‘CONFERENCE COMMITTEE (CONT'D) RD. Mile — Ontario, Canada RS. Parok — Wisconsin MF Mociney — D.. Ross ~- New Brunsiick, ‘Massachusets Canada GR Myrick — Arkansas I. Surtoos — Saskatchewan, Y¥. Nagpaut — Hawa ‘Canad W.R Owens — Louisiana MR, Toth ~ Tennessee TM Parks — Texos MJ. Verhagen — Wisconsio RP. Pate — Alabama M1. Washington — New lercy J.D. Payton — Pennsylvania RB. West — lowa MR Peterson — Alaska MI. Wheel — Vermont H.D. Plat —South Dakota 0. J Wills — Indiana 1. Pratt — Missour D.C. Price — Yukon Teeitory, Canada Zarate — arizona [BPV PROJECT TEAM ON HYDROGEN TANKS. M.D. Rana, Chair RC. Biel, Conesporsting GM. Bsenbert Secretary Member FL Brown J. Cameron, Conesponding B.A Canomce Member .€. Cook M. Duncan, Corresponding 1. W. Felbaum Member Joseph DLR Frikken, Corresponstiny LM. Lacy Member NL Newhouse LE Hayden. te C.B. Rawls, I. Comesponnding Momsber 1 Sims, J KT Lay, Covresponding NN Sirosh Member 1H Smith K Osamada, Coresponding 5, Staniscenskt Member Tahara CoH. Rivkin, Comespunding ©.W. Treadwell Member EUpits © San Marchi, Coresponding CTL Webster Member Hi Barthelemy, Corresponding B. Someday, Corresponding Member Member INTERNATIONAL INTEREST REVIEW GROUP V. Felix ¥, Pak 5. H. Leong Williamson W. tin Y. Kim, Delegate CMinu SUBCOMMITTEE ON POWER BOWERS (C1 1. Berges, Chair BW. Roberts, Vice Chair U. DUrso, Secretary WL tomy 1 Mackay T.€, McGough DA. Cananicw RE Mecaughlin KK Coleman PLA. Biol P.D. Edwards ¥ Osh 1G. Feldstein 1. Pill I. Haieswoatn KD. Schueler 4 TF Hansen PP Sewers. Ie 1S. Harwer Mt Tanze! CF leerings R.V, Welgencina 1 tibbrechy DA. wat Honorary Members (SC 1) O.N. French BL. Wills Wot Somers Subgroup on Design (SC 1) PLA. Mabie, Chir 1. blest G.L Miler, Seectay 1. ght ML Coats B.W, Move 1D. Fshbuen RD. Scholes, IP. Glaspie 1 Seige CF leerngs| LP. Swezy. G.B, Komora 58. V. “onkilekon Subgroup on Fabrication and Examination (SC 1 1.7 Pillow, Che TE Hansen LL Arno 1G. Mein DA. Berger RE McLaughlin SW Cameron ¥. Oh G.W. Galanes RV iclgonrincs |. Hansen Subgroup on General Requirements (SC 1 RE Metaughin. Choie 1.6. MeGinugh LE Hnswonh, Sever 11 Pillow Conk D. Tompkins PD. Een S.V. Torkikbon 1 Hansen BV, edgar WL. tery DL walls F,Massi Subgroup on Materials (SC 1 5 Kober, Chive LE Henn FS. Hunter, Secreta 1 Line ti D-A, Caponice 1 Mackay KK. Coleman F. Masuyama GW. Galanes FM Tanaent KU tlaves Subgroup on Piping (SC 1 T.£ Mansen, Chive Fass DL. Retger 1G MeGingh .D. Eewards D.Toriphins GW. Galanes FA White Wil tony Heat Recovery Steam Generators Task Group (SC 1) TF. Hansen, Chair Fst Oniman, Secretary RW. Andersan BW, Mowre AL tums RO. Schuck, 1 Bel 1-6. Sowa, UR, Douglas 5.R. Tinks LD Fatbum: 1 Teenphi GB Kaman Sxctn LP Lite Boe, Teas mk Dob Mra VA Ta SUBCOMMITTEE ON MATERIALS (SC I) 1.5 ten, Chaie Me Gall, Ye Chie tins Seurctan ©. Hotinnann PA Larkin Masami Val RK Nant DC Aan MUL Novae Mk phi FG Nishewt A Antec DW Rakes Mt N besser B.A, Roberts 11 Mash E Shui 1 Caro KC Sathorn DO Cancer 8. Saliva Clana Est Tanzosh Palas BT Thurs DW Gans RA Mown, Honors ATH cakes Member VF Gabb 1B Kswon, Polegate Honorary Members (SC 1) A Alne LA Heger 1.34 Cafes GU He Riehl RA Moen WP Da CE. Spann WD. tds AW Zeal Subgroup on Fxternal Pressure ($C Ml & SC-D) KA Mike Chae 1. Katcher TAA. Mutton, Sovtetaye DLL Karle LF Champ E-atchalepenlos 1.8 Gitte D. Nadel 1 Gh CH Stace ‘Subgroup on Ferrous Specifications (SC It LG Nisbett Chair D.C. Krone A Aalto, Vier Choe Lh Laver RMN Dasin WC Mack B84. Biman J Mahaney S| Dasdorian AS Mell 1 Guam KF One IF Crh F Ups Kat Hot R. Zasieraha DS mbes AW. Zeathen Subgroup on international Sat Specifications SC 1) WA bunds Chur 0.0 Henny A. Chnwadouet, Wie Chair M. Higuchi Ii Gli, Secret H birene D.C Agarwal HED. tasted 1A annie 1. athauey A Coarneasky ALR Niwening, B.D. Schutter. EA Seen E.Upsis D. kun, Dovegane Subgroup on Nonferous Alloys (SC 1h 1. W. Rahor, Chair ALG. Kies. I Aa. Rater, Sour 1 ks DLC Asana PA Larkin Ww. Apblet je H. stasun HD Bishteld LA Mentaster Ls. Cate 0.1. Pars MT Giles E Shp 1A Gru RC. Sutherlin 11 ther R aciercin CH Suhgroup on Strength, Ferous allows (SC 1) CL Hinson Chie 1 stasayama NM. Tanzity Secrtane Hsu Abe He stuskam WR Aphien te 1. Raho 1 Canons BW. Kober KK era M.S. Shen Pate KAY Sinden M. Gold BF, Thargoost Fe en TP. Masel EL mes Subgroup on Physical Properties (SC I) LF Gib, hae 0. Falewey D.C Aawal 1 Shao HD. fh Sungroup on Strength of Weldments (SC I & SC 10) FM tana Chae Lee WE Amon fos DAY KK Colom, BA Raber PD Neer WoT perks 0. W. Ga WE. Thang Kolo thives Subgroup on Toughness ISC HF & SC Vi WS beotn, Chair K. tukhonae LL wl © Reel RI. Bis ET ehlps ECamerve M0 Rom 11 bono D.A, Swansea BC Lamb Et pis Special Working Group on Nonmetalic Materials (SC 10 AW. omy, Cha 1 Ressler SL Bean RH, Walker ra) LW: Weer rst F vont SUBCOMMITTEE ON NUCLEAR POWER (SC I KW Harmen, Chae 1 hentire RM bessee bce Chair DF basders COS, Sun, Sorta WC Takanhelle WH ieeter KOA. sinols MUN. fret Fa Sushi ER Cale WN. Mele KE Commo e D.K Marton RP Doubler (0.0) Oyama BA filer RF Reed GoM fete HA Scom Ks. t8tl at 1D. Stevens CL Heaton AOR wichman 6. YH. Cho, edegate Honorary Members (SC 4, Bosnak FR Dobos 16 sant KA seen WD. Dany CL Paper ‘Subgroup on Containment Systems for Spent Fuel and High-Level Waste Transport Pachagings SC 1) GM. Foster, Chair A.B. Meichler GJ Solovey, vice Chair RE Nickell D.K. Morton, Seretan” EL Pras W. Hi. Boter 7. Saogusa G.R.Canwell HP. Shrivastava © Farow N/M. Simpson RS. Hill a RH, Sith D.W. Lewis 1D. Stevenson CG. May C1 Temus PE McConnell P Tula 1D. Meinnes A.D. Wathing Subgroup on Design SC m)) RP. Deubler, Chai ©. Landers RS. Mill, Vice Chair KA. Manoly ALN. Nguyen, Secretary R. | Masterson TM. Adame W.N McLean MN, Bressler J.C. Minichvello CW Bruny M. Morishita D.L. Caldwell FF, Naguib KR Cole 1. Nakamura RE Cowman, Je W. Z. Nowak A. Dermenjian EL reins P. Hischberg Saito RL. Jonee C.C Slagis R.B. Keating 1'D. Stevenson 1-F Kiel 1 P. Tucker Hi Kobayashi KR. Wichman ‘Working Group on Supports (SC-D) (SC 1th R. |. Masterson, Chair FI Bitch, Secretary U.S. Bandyopadhyay RP. Deubler W. P. Golin AUN. Nawyen | Sato JR. Stinson 1G. Temyah D.V. Wahhe cLWu Working Group on Core Support Structures (SG-D) (SC II) 1. F. Kiel, Chair 1 Land 1.F. Mullooly Working Group on Design Methodology (SG-D) RB Keating, Chair P-L. Anderson, Secretary 1. Adams MLK. Au-Yang RD. Blevine DL, Caldwell M. Hateman H. Kobayashi D.F. Landers W. 5. Lapay 1. Lockeat JF McCabe PR Oba 1D. Steyerson 1 Yang ‘Working Group on Design of Division 3 Capiainments EL. Ping, Chair Tt Adams 1, Brorkrsin D.W. tewis ILD, mteinnes FC. Minh bo SG-D) SC IN) 1B. Morton RE Nickell HP. Shrvastava CL tems Punta Working Group on Piping iSG-D) (SC 1) P. Hirschberg, Char RC. Fung, Seer TM Adis © Basavaraia Catalano LR Cole Ro} Garda RW. Haupt J. Kaveahara RE. Resting V kostarey Working Group on Probabilistic Methods in Design {6G-D) (SC IN) 8S iLL Chr Tat Adams 1 Asayama BM Anat TA Bacon ALA. Dermenyin MR, Graybeal 0.0. Henny EV. imbio Working Group on Pumps (SG-D) (SC IN RE Corman, fr Chow M.D. iiychiow A.A. Fraser MM. Higues GR ones Working Group on Valves (SG-D) (SC I 1.P. Tucker, Chai HR. Bewla G.A Joly W.N Mi Lean TA Mstshon Working Group on Vessels (SCD) (SC 1) Naguib. Chai Bruny grt W. Z. Nenak, Cha RS rnin CL Hatimann Subgroup on General Requirements ‘SC ll & SC 36) WC Laktochelie, Chir CA. zoe, Secretary Apple Rtn WP Gi EA. Mishow ROP Manne DF. landers LF taCabe J.C. Mintel ALN. Neuve 0.0. Oysmada RD, Patel EC. Reahaugh Ms. sils GC. Sis EA Was 5.0 kul A. McNeil I PI oReqan N.A Palm Saito ME, Schmidt 1p Toker RM Wilson 1.W Leow 1. ivingsion JR Rojan AG Wushu 1D. Page H.R Sanderegger 1G. Texceneanes RG Vin A. allnine RB. Resting K Masunsg DLE Matthews Rom Wiles 5. Yukawa VH Chet, Dole 80.80 M4. Minch, 8 Suit DY whe Effects (66-0) SC Uh) Subgroup on Materials, Fabrication, and Examina C1 Heatmann, air 1. raha GP Mile, Secretary Mi. Nakai WH Borer 1 Mepe D. st Dene N.M, Simon G84 Tinter WT Spetke G.8. Gevngiev [PR Stinson RM ese Kf Stuckey Ce Kin A.D. Wahine At ta S. Yukawa Subgroup on Pressure Relie (SC I SF Hatrson. ie es AL. saesin Em Petts D.G. Thibault Sebgroup on Strategy and Management (SC IM, Divisions 1 and 2) RW Baenes, Chair MF Heschvi TR Cale, Secreuine 8S Hl BK fobs ELV imbue Teen RM Tess Bos te RF Rowe CM. Fay ¥. Urabe Special Working Group on Editing and Review (SC Mb RF Rew, Chae RP. Doubler B.A. tlee WC LaRoche Case LD. Stevenson Subgroup on Graphite Core Components (SC 1. > Burchell, aie ©. Celine CA Sinn, Soeetare AON Atel Beaton NLN. Nemeth SOW Davies Tow S$. Dan M.Srinivosan S 1 bun JOINT ACL-ASME COMMITTEE ON ‘CONCRETE COMPONENTS FOR NUCLEAR SERVICE (SC 361 te swan, Chait erhaud, Vice Chae 1. Gatiewer 1K. Marea IM, F Heschimee IN. Alchaat TH lah 1.1 AEShawal Rall Lee 14 Anus BM Scot HG. shar RE Shewnssher ML Higohay 1D. Steweasan Baile SY Wong Forza T. Watson fates steer SUBCOMMITTEE ON HEATING BOILERS (SC 1¥) PLA. Malin, Coie K st Metague S.8 Vinelwes, Vie Chair RAY. Moa G. Minos Seervtar 1A Nordstrom TU Beale Tost Perks D.C tinby LL see ones KL Belge zina “ond FP Burton, Honan Pci ine snember CM. Dine ROH Duggan, Honore Wo Hans Swnter LA. Hall ROHL Weigel. Hnorae ay Semen DL feakins LL Seodanh, Home WP Cons Member Subgroup on Care and Opera on of Heating Boilers SC IV) 1. StcTague Tt Beaton, PA Moly came ‘Subgroup on Cast lon Boilers SC 1Vs KOM. MeTague, Chair WA Larkin TU Genk WD. Lemos 1b. Chewing Co Neue Subgroup on Materials (SC IV) BA tuehin, € aie WD, Lemme Ba ttl IL sei Subgroup on Water Heaters (SC EV) WT Hany Cha KoMt setae 1Gllaad Fo seh 1D Ga a taylor WD. Lemes brant Subgroup on Welded Boilers {SC 1V) To. Best, Cha A. Sunkieam Caan LL sete CM Bin RA Waly nei SUBCOMMITTEEON NONDESTRUCTIVE EXAMINATION (SC V) LE Bases, Chai ©. R Quatehaue. Je FR Kiwas be Gu fF ) sater S Vasque. Secretar BH Clark, I, Mono SL Akin senior 1 Aseenk HC Graber, Henorar AS Bits Member P-L Beer 10.7 Hedeen, Homec NO Fara tener AF Gathudensk JR. Micky, nan GW Hise Awmber LF Sannin Stanher RD Mea ‘Subgroup on General Requirements! Personnel Qualifications and Inquiries (SCV) RD. Meare, Chair I.E. Batey AS. Bieks NY. Faransso G.W. Hembree 1W. Houf 1 R Mackay 1.P. Swezy, Subgroup on Surface Examination Methods (SC V) AS. Birks, Chair S.J Akin PL. Brown N.Y. Faransso GW, Hembree RW, Krvzic 1D. R. Quatiebaum, fr FJ, Saler MJ. Wheel Subgroup on Volumetric Methods (SC Vi GW. Hembree, Chai Asin frown ¥. Faas F.Gatholevsky Rw. Hardy RA Kellerhal FB Kovace RW. Kruzle LF Manning Fh Sattler ‘Working Group on Acoustic Emissions (SC-VM) (SC V) N.Y. Faronsso, Chair 1B Aycock LE Baey TF Manning ‘Working Group on Radiography (SG-VM) (SC V> F Heder AF Garbolevsky RW. Hardy CW. Hembree RW. Kruse TL. Plaeek R.A. Kellehall [FF sunning M.D. Moles F.1 Sater SUBCOMMITTEE ON PRESSURE VESSELS (SC Vill R I Basile [Cameron D. B. Demet 1. Glaspie Mt Gale WS. Jacobs 6.6. Karcher Kr ES tee Rice RAY atbiks UR Miller ©.C. Newly DT Peters MJ. Pschke M.D. Rane GB, Rowls, 5.C. Roberts CD Rodory KCL. Schovier IR Sins KK Tom Pepe LL Thoma. tr Hevwna Subgroup on Design (SC VID UR Miller, Chair RE, Knobloch, Sacreary 0. A. Basky RI. Basile MR. Breath FL Brown, TR Far 1.P- Glaspie .E Hinnant W. 5. Jacobs MD. Lanwer RW. Mikitha K: Mokbiarian Subgroup on Fabrication D. Rother, Chair Seca, Vice Chae Lara Carpe HE Gondin W. 5. Jacobs Do kee c I t 1.#. Postar MD ana GB. Rawls Ie S.C. Roberts 0. Rodeny A Sule S.C Shah CH. Sturgeon DLA, Swanson Kok Tam EL thomas [r ROA Whipple and Inspection (SC Vill) ©. Lamb 1 S.tee 8, R Mosekick MLL. Pschke ML Rice B.F shelley 1P. wer. Ir Subgroup on General Requirements (SC Vill) $.€ Robes, Char 0.8, Demichael, Seeman, R Basile LP. Glaspie KT Law M.D. Lower CE. Newly AS Oltsaes FL Richer KI Schneier DB Stewart D.A. Swanson KK Tams ‘Subgroup on Heat Transfer Equipment ($C Vill K. Mahacloen. Chai G. Auris, Secretar SR Baba 1H. Babe ©. A. Bary 1G. Campin MD, Chath 1 Gordon M1 Holte FE rei Bob Lerch 5. Mavoux U.R Miller TM. Norton F Gower RF Stastyy 5. Yokel RP. Zoldak SM Caldwell Honorary Subgroup on High-Pressure Vessels (SC Vt) 1. Sins e. Chair S.Vasques, Secretar: Lorena HC Bie 01 Burns PN Chak K.0, Dun AVE, Due 1M. Fer Ws Hiller AH Hew 1A Kapp 1. Keltens DP ken AK Khe 5. Moe Gia Ct heer Dot Petes, Chk Fe titir Subgroup on Materials (SC VII .Comeran. Chive WW Motard Tp Morgen Sezer’ EG. Nisbet D.C Agra D.W Raho LF Groh RC Sutera 1 tine F Upsis Nhat hee special Working Group on Graphite Pressute Equipment Isc vith S.Aakane, Chair MR. Mini TU se, Sortetar E.Sun Fo Hee ALA. Stop Special Working Group on High-Pressure Vessels (SC Vit Task Group on impulively Loaded Vessels (SC VIM) KF Nickel, Choe 1. lake Gm 1A Datiey 1D barker & Fanaa RE Hl BL Hiroldsen 1 W. Howes HL Heaton 11 Caldoell EA. Rodriguez Xa Cain LR Sims. SUBCOMMITTEE ON WELDING [SC 11) Aeleiein, Chai RD MKGuite Vico tha BR Newmark 1-1. Wend, Secretar AS. Olnates DA ames M1. Puch RK Bown Ie 5.D. Reyralis Camere ML Rice TP Coane MB. Simm PD Flonnee GW Spohe a 1 Given, Ie ML Stanko 15 be PLL. Van Fission WW. Lunds RR Young Subgroup on Brazing (SC 18) 141 Wischke, Chae ALF. Garbolevsky FW. Heckenan CF seerings LE Campbell LP, swery. Ie ‘Subgroup on General Requirements (SC IN) BR Newmutk, Chair 1.6 Pores PR. bvans PL Sturpl KOM fesse KR. Willens| Subgroup on Materials (SC 1X) M1 Campenten, Chae 1 ma I seael 5.D. Reyna, in AY pernasek eb Sane LP. Cannon WE Sperko RM poser M.j Ma CO Kin ROR. Youn Subgroup on Performance Qualification (SC IX) DA. ters, Chair KI Haves 1 Gtr Ww. Lundy KW conn #0 Mure PR a NO Sins PB. Ron GW Spd a 1st Gina. Ie Subgroup on Procedure Qualification (SC 1X DA. feavers, Cur ACR Sine St Besowk S.. Spru RK. ns 1 Stes, Ie SD. Reynold, I ToC West Honorary Member (SC) SUBCOMMITTEE ON FIMER-REINFORCED PLASTIC PRESSURE VESSELS (SCX) ison. Ci 1 Mp PY Cosh tie Choe 0.1 Panter SVascuis, sor tare 1. Piel FL Brows © Ramirez 1 Bust Lk Ruler TW. Coles LA Raton TL Finke Bt Shelley D-H. Hoxighonson FW. Var Nate LF Hue 2.0. ances I Do. hector PAN Zieh SUBCOMMITTEE ON. NUCLEAR INSERVICE INSPECTION (SC XI) GG th, Chae WE, Norts ROW. Savvne, Vice Ohair—K Rhyne RL Crane, Secretary W. Re Rees I WHE Hanon Ir Dea St RC Cipla Fob Sst DO. Davis 1G. Spanaer Je RL Osh HL Sera Fok Fare GL Stevens RE Ging EW. Throckmorton It FL Gaegie DE Waskey X Hassgia RA West 1.0. Hen © L wine RD. beer 5. Withers SD kala RS Yona Go Lagheder Kok Youn 1M Taniond Subir wnlbers YS Chang, Delegate BR. Neootrt Executive Committee $C XI RW. Swayne, Chair G.C. Path, Vice Chawe RL Crane, Seeretan, WH Baro, Ir D.0. Davis RL. Dyle RE Gimple FE Grogoe 0. Hoven €.G. McCargor WE None K. Rhyne FA Schaaf J.C. Spanner, In EW. Throckmorton It B.A Yonekawa Monorary Members (SC XI) LAL Chockie C.D. Comer ©. Heddea J.P. Hosta CR Katz PC Riccardlla ‘Subgroup on Evaluation Standards (SC XD W.H. Bamford, fe. Chie G.L Stevens, Secreta RC. Cipolla, 5. Coffin G.H. De B00 BR Gana TJ. Gnesbach K. Hasegawa DN. Hophins ¥. Imamora sovama k D. HLS mca I.G. Merle 5. Ranganath DLA, Scan KR. Wichman KK Yoon YS. Chang, Delegate Working Group on Flaw Evaluation (SG-ES) SC X0) Cipolta, Chair De Boo, Secrery Bamford, J zz0 FD. Hayes PH. Hoang DLN. Mopkine Ys Imamura K Koyama OR Lee HS. Mehta ‘Working Group on Oper TL. Grieshach, Chai KR Baker WH, Bano H. Bohne BA. Bishop TL, Dickson S.R Gonselin SN. Malik HS. Mehr 1.G. Mere MOA. aiteelt K Miyazaki & K Qushu S. Ranganath P-L Rush D.A Scan 7.5, Sehurman WEL Sener FA, Simonen KR, Wichman G. Mt. Wilkos KK. Yoon 8. Yukawa VA Zirsteia ng Plant Criteria ($G-5} (SC Xt) R Hee S. Rarganath WoL Somer EA. Siegel FLA. Simunen DP Weaklond KK Youn ‘Working Group on Pipe Flaw Evaluation (SG-E5) (SCX) DA. Scath, Ch G.M. Wilkow Seeretan 1 Hi. Samo, RC Cipalia N.G.Cote K Dattuar 5 G.H, De Boo E Friedman BR Gana LF Goyene Subgroup on Liguid-Metal-Cooked Systems SC X0) .G. MeCargar Chair Subgroup on Nondestructive Examination SC Xb © spannes e. €bair A Lotus, Secretary M6 Goshard Working Group on Personnel Qualification and Surface, Visual, nd Eddy Current Examination (SG-NDB (SC XN D.R Condes, Secretary BL came N. Fatenbaugh GB Goorgiew DO. Henty 17 Lindberg Working Group on Pressure Testing (SC-WCS) (SC X0) .W. Lamond, Chair I. M4. Boughman, Secetary FJ Chute et Gt fechter Kw. Hall, ‘Working Group on Procedure Qualification and Volumettic Examination 'SG-NDE} SC XI ME. Gosthard, Chair GH ekans. Secrtan, 8, Chuezern AD Chockie SR. Dactor FL Dead FL Daten A Hacker K, Hasogana PH Hong DLN. Hopkins K. Kashima HLS. Meh K Mead 15. Panes B.) Resh kK Yin VA, Zalerstein Lchawe D.0. Hoary MR. Hum GL Logleer 1.7 Lindberg G.R Perkins AS. Rew Fle Sohaat ch wine Reed ake Co spanner J: Lwite . A D. ' ce k t 8 fs R Kells ©. Kurd GL agleskr GA Costes R Quatebaum, I e Ke tec ainahas| u Subgroup on Repai/Replacement Activities SC-RRAISC Xb A Noches, Chase KD Kew V. Farrell Seceton SL MeCracken SH Me BR Neston RL Conte 4. orsullvan PD. Faber WR Rogers 1K, Geel RR Seven RF Gimp RW, Suan 1. Graham DE. Waskey RA Heimann 1.6 Weeks 1 Ins CS withers Working Group on Design and Programs (SG-RRA) (SC Xb) 1A Gast, Chae 1.8 Groban S.A Mesa, Soeretary GF antrat ALY, Du Bran het RR Sivenson Ge RW. Sayre 1. Farell AH, Taig Sk Fiher TP. Wawel I Ft Gamber R.A. Yonehanea ‘Working, Group on Welding and Special Repair Process (SC-RRA) (SC XH 0 t Wankes, Chae RD. kere RoI Contell, Secman Coke SIF Mw PD. ther SL MuCrachon KR Guns BR, Newton Mittal JF OSallivan RA Herman 1G. Weeks Ra KR Willers Subgroup on Water-Cooled Systems (SC X1) 146 thnokotin ML Chai 3D. Kalat 19 Apull Seer D.W. Lantond GA Belew A nkeSeil 1oA8 Bethan WE Now D1 Davis D. Sone HQ be LL Sins bts 1M, Stephens, fe EA Tara K 8 Thomas ML Fes RA Wost Foi Feat 0 White SL Herren. HL Gave, Alternate ‘Working Group on Containment (SC:-WCS) SC X1) 1 Statens, Chae Horn 1 ase RD. Rough SG Bay ON. ishnasssany KCN Chae D. Now BG S.C. Petit Bow. Ck HAL Stephon. Av Fee WE, Noms, tere HLL Graves Working Graup an ISt Optimization (SG-WCS) (SC Xt EA siege Chae A.1, Mahinglakae DR Cards, Seccor D.G.Naviek 1, tune, Secotary KB Thomas Wo armor GE hima 14 Boxman’ ¥. Yauch Ri Hall ‘Working, Group on Implementation of Risk-Based Examination ISGAWCS) SC Xb S.10 kat Chair KAW Ht A. MNeil Hh Seems DW. Comet FAN Aull 11 Lites saan RA Mame BA. Bip PL ORewan 5.1 Chess So. Palm C Caot Felquerose MA Pane R. Foun RA Wet MR Gnigheal 1 Younge Paki AI Keim Mlvena Working Group on Inspection of Systems and Components, (SC-WCS) (SCX KB Theos, Chae 5.1. kat D Sone Se D. ti, on No it T Nomura GL. Belew CM Row CC uct elgantoen Rt Tomer Hn RA Mest Working Group on General Requirements (SC Xb K. Bisse Chair Earns EL nts, Secretar Ros Mara To eh Sk Sunt 1D. Ets 8 Withers Special Working Group om Editing and Review (SC XH) RW, Sass, Chae J. State CF sme Cowie Special Working Group on Plant Lie Extension (SC Xt) § Steen Chair Pot Ko .¥. Bung, Serres RU Tuner DD bw G6 Young F Gaye Special Working Group on High-Temperature, Gat-Cooled Reactors SC XD 1 Hatch A.A. Kruse MAL Lobos, Sevretiny MLN teed Stead Fol Schaal Je KN Fleming Rw Swany Wao Riel SUBCOMMITTEE ON TRANSPORT TANKS (SC Xt A. Sela, Chae suet Plane, sector Nt Ke Minick PT Stump Secreta M0 Pham ALN. Antonie 4D. Rana ©. Hecht 1 5. Stansveah M1. Cots A Ter MAG A Varadan C11 Her hea SOV. Vinh Subgroup on Design and Materials (SC M.D. Rana, Chair G. Karcher LMewiliams 1 Paulick D. Pham co s. N M TA. Rogers AP. Varghese MR. Word EA White Subgroup on Fabrication and Inspection (SC Xi) Voorhees, Chair Byers Gehl v, A L D. Holsinger 5 I 8 t DiI Reet G. Mekae MR. Minick A’. Olivares Subgroup on General Requirements (SC XI) CH, Hochman, Chae T.W. Alexander D.AM.allixiten CA. Bets 1 F.Cannon 1.0. Frller W. L. Garfield MA, Garret K.L Gilmore JL Rademacher T. Rummel MR Toth L Wolpe ‘SUBCOMMITTEE ON BOILER AND PRESSURE VESSEL ACCREDITATION (SC-BPVA) .LaRochelle, Chair Edwards, Vice Chair | Baron, Secretary 8, Daherty Hacktord Taw E. McDonald M. McTague R Morelack D. O'Leary Tanner Tueczyaski E Tate A Whitle 8 p k P. k L K 8 1 D. 8. D, £ G. Byrog, Alternate MA DeVvies, Aternate CE Ford, Afternate TE Hansen, Alternate G.. Hollinger. Alternate D. |: ening, Alternate 8. 8 MacDonald Altornate RD. Mile, Alternate G.P Milley, Aternine TW. Norton, Atenate H.R Stach, Alternate ‘A West, Alternate Y. Wielgoszinshi, Ate Trapp, Semior Consultant I. Spencer, Honora Momber ‘SUBCOMMITTEE ON NUCLEAR ACCREDITATION (SC.NA) RR, Stevenson, Chae WG. LaRochelle, Vice Chair I. Pang.Secreany MN. Bressler 5. M. Gouhvin KA. Huber Mt. Kot 1G Krane CA. Lizone RP, Melniyre MR Minick H.8 Prose TE, Quaka AT. Rober I DE Tanner DM. Vickery G.Bynog, Alternate G. Deis Alternate PD tebwars, Alternate JW. Highlands, Atente KM Horie. Altemate BG. Kovank, Allerte PE Prescot, Altornate 5. Toledo, Afteynate EA, Whitle, Alterra RY Wielgosrinsk. Alert HL Wiger, Alternate 0. Trapp, Seor Goma SUBCOMMITTEE ON DESIGN (SC-0) RJ Basle, Cnr RW, Barnes MR Breach R.P Deobler G.6. Graven GL Mallinger RI Jeter B.P. toes RW Mikiks UR. Miller Wf O'Donnel RD Schuck A Sele Subgroup on Design Analysis (SC-0) G.t Hallinger. Chae 5A. Adams MR. Breach RG. Brows RJ Gurdat © F. Hebering i CE Hinnant P. Hirschberg D.P. ones A Kalinin WoL Koves Subgroup on Elevated Temperature Design (SC-D) I. ener, Chie 7, Asayama Becht F.Cervenist D. 5. Gaitin 5. F Hane MH Tawad WI, Koves 5. Majumdar Dot Maron K. Misunaga G.A Miler W. ©. Rewharde D-H. Roatty G Sem TG. Seip D.A Swansin G.Tonacher EL Thosmas. RA, Whipple TF McGreeyy KA Moore WI Oona D.A. Osage B.S. Poxowsk 8. Riou TL sham M.S. Shelton RW. Swwindeman ‘Subgroup on Fatigue Strength (SC-D) W. |. ODonnell, Char S.A. Adams PR. Denasin 1. Gurdal CF Hedesting P. Hschberge Pore DP, jones G. Kharshatdjan S. Majumdar T. Nakamura BH Rosny G.Taicher HH Ziad Subgroup on Openings (SC-D) MR Breach, Chaie KW. Mails, Seeretary G.G. Graven oe) RH Cuney Special Working Group on Bolted Flanged Joints (SC-D) RWW. kiko, Chave 1.1. ibe! HA, Bows Michalogmacn SN Pa 5. P. Mudklen DR. Pale 1A, Peter MD an F.C Resdabaugh FR Payne PC. Seheckermann RYN hot SUBCOMMITTEE ON SAFETY VALVE REQUIREMENTS (SC.SVR) SAA Maris, fe, Chie Plas 18 went, Ve Cha HL Gre, S.1 Ross, Seevenay Wo Ha 1 fat C4 Neumaen S$. Cannwresi TNS Paks As D.K Paria RD. Danry Df seallan 18 Demat 1. Stands BF Dealing Z.Wang Subgroup on Design SC.SVR) 1X wnt Chai HL Grew, C1 Bee D. stlier K. Danay 1. Pan #1 Dooling 18 Torbay Subgroup on General Requirements (SC-SVRI D.R.Oenichawt, Chae Tan Paks Lal DK Part © taze 16 Rams IP. Glas IL Richaathen 8 Nin 1 Sandon Subgroup on Testing (SC-SVR) A Cox. Choe wo Have Le ea KG. Roth 5. Cam Do sallan G1 Gonehon Zang US. Techni Group 150/TC 185 ‘Safety Refit Valves TA Besilacgua Chir yatta S.A Rin, Seuetin . Siler St rian fe 1A West PERSONNEL Officers of AWS Committee (Cooperating in the Development of the Specifications Herein) As of January 8. 2007 [AS COMMITTEE ON FILLER METALS AND ALLIED MATERIALS 1a Fink Df. Rock LS tee, to Vw Chai UG Keiaaht 1E0. Welw, Ind Vice Chae AY. Ua Gupta, Secretar 1 St Blackbur AS Lavrensin WA. Marta RS, Bann R. Menon He Has MT Melo 1. Christel DR Sailer 1D. Cronkott B.stosie LA Delian Ie AK. Mhheies 1A. Delsipnore CL Null Devin AP. Parekh HW Eee RL Poste DML Fake $.D, Reyna CFeekten PK, Sshesen SI Fete Sampath RD. Fuchs Mp. Sullivan (hacen KE Sather A. Henig RA Swain MQ. fatnson P 1 Konkel RD. Thomas Ie K.P. Thanos 1 vena ASX EXECUTIVE SUBCOMMITTEE DA Fink Chair B.D. Fuchs LS. tee, It Vice Choe DoJ, Roteckt 1D. Web 2nd Vice Chir Monon . Gopla, Secretan RL Peasiee DA. Delsignone LT. Verna ASA SUBCOMMITTEE ON CARBON AND LOW ALLOY STEEL ELECTRODES AND RODS FOR SHIELDED METAL ARC AND ‘OXYFUEL GAS WELDING GL Famke, Chr DR Miler RA. Swain, Vice Chai 1. Opboa Gupta, Secretny Pare FL Detach, fe MA. Quintana HW. Lest PK Saleen KK Gayta Sanath AY Law M.S Srerdzinct ASB SUBCOMMITTEE ON CARBON AND LOW ALLOY STEEL ELECTRODES AND FLUXES FOR SUBMERGED ARC WELDING DD, Crh Chie M4 A tanh T. Me Line Chir AT. Serle R Gata, Seeman DW. Maver HP Beak, DK. Biller HW Ther Po Kaklas 8. franc DM. Parke RD Hh RA Soa ASC SLKCOMMITTEE ON ALUMINUM ALLOY FILLER METALS 1A, Seman, Chir BC Ranirnger evr S.A. Coline 1k Wht [ASD SUBCOMMITTEE ON STAINLESS STEEL FILLER METALS, PA Desagnone, Cha SR bina 2.) Solve Chae GA. shy Gupts, Seeretar FB Lake RS. Rene MT. Melo RE Cant R.A. Sain 1G. Foeken G. watlin KD. Fach HCD. Wehr 1A. Horning [ASE SUBCOMMITTEE ON NICKEL AND NICKEL ALLOY FILLER METALS, RO. Furhs, Chae D.B. Kiluner 1S bee ce Chae 5.0. ker Gupta, Seer G.A. Rory DC Agarwal FB, Lak RS. Brown WE bse G1 Bank 4 Menon Re Con RA Noun RD. Thomas LF Tuenoe HD Weer [ASF SUBCOMMITTEE ON COPPER AND COPPER ALLOY FILLER METALS, K.P. Thomberry, Chat 5.D. Reynolds, I. ALR Memes, Vice Chait . Roossinck R. Gupta, Secretar RD. Thoms, D8. Molliday 1 Tor J.P, Hunt HD. Wehr [ASG SUBCOMMITTEE ON HARD SURFACING FILLER METALS R Menon, Chair 5.) Mewick R. Gupta, Secretay 1G. Postle F Broshjet VB. Rajan G.L Fillion G.C. Schonid SP her 13.c Wo W.E Layo, [ASH SUBCOMMITTEE ON FILLER METALS AND FLUXES FOR BRAZING RM. Henson, Chair TP. Hirthe G.L Alo, Vice Chur Mo Kuta 5. Borrero, Secretary MJ Lucas. CL tenney, Secrecary CR Moyer Alora T. Oyama PA, Baekin RL, Peaslee ¥. Baskin CW. Philp FR. Boos AF. Shapiro DE, Budinger Tod Sepia CF Darling [ASI SUBCOMMITTEE ON TUNGSTEN ELECTRODES W. Severance, Chair M, & Gedgaudos J.B. Heinzman tl RA. Swain M.D. Tumulura [AS] SUBCOMMITTEE ON ELECTRODES AND RODS FOR WELDING CAST IRON 5.0, Kiser, Chair R Gupta, Scretany RA. Blishel RA. Bushoy MQ. Tohnson [ASK SUBCOMMITTEE ON TITANIUM AND ZIRCONIUM FILLER METALS KC, Sutherin, Chai 8 Keaogur 1G Stomsees Fire Chae SL tackemsht Copa, Secietin GE Thepas > Rleppe AE Welly Hota ASL SUBCOMMITTEE ON MAGNESIUM ALLOY FILLER METALS KP. Thoenbery, Chair R. Gap, Secretar [ASM SUBCOMMITTEE ON CARBON AND LOW ALLOY STEEL ELECTRODES FOR FLUX CORED ARC WELDING. DB. Crocket, Chat MQ johnson MT. Merl, Vice Chair AY Lu R. Gupta, Secretary Ww. Layo IC Bondy steno IE Campbell DR Miller Ie Detach MA. Quintana 5. Fecee RB. Seah G.L Franke RA. Swain Haynie RD. Thomas Ir |ASMILSPEC AD-HOC COMMITTEE ON CONVERSION OF MILITARY SPECIFICATIONS TO AWS FILLER METAL SPECIFICATIONS 1.1 Detoach. fe, Chae J Lhe B. McGrath, Secretary MT Maria J. € Bandy D.R Miller H.R. Coser CU Null S.E.Feree WM. Rut D.A Fink M1 sullivan 1 Galt HD. Wehr PLA. Konkel [ASN SUBCOMMITTEE ON CONSUMABLE INSERTS HD Wehr, Char WI Sperko, Vice Chor R. Gupia, Secretary [eb Detach fe AS. Laurens W. F. Newell Ie ©. Stra RD. Thoma ke [ASO SUBCOMMITTEE ON CARBON AND LOW ALLOY STEEL ELECTRODES AND RODS FOR GAS SHIELDED ARC WELDING. 1.6, Bandy, Chair MT Merlo, Vice Choir R Gupte, Secretar 1.4. Detach ©. Miller MP. Parebh DM Parker MA. Quintana DLA. Fink K. Sampath KW. Gerhart RR Smith Pj, Kank RD. Thomas MA Ludwig DA. Wright ASP SUBCOMMITTEE ON CARBON AND LOW ALLOY STEEL ELECTRODES FOR ELECTROSLAG AND ELECTROGAS WELDING 1.8. bee, Chair R. Gupta, Secretary 1-H Devltian DA Fink D. Singh [ASS SUBCOMMITTEE ON GASES FOR GAS SHIELDED ARC WELDING AND CUTTING. |. evi, Chae 1 cole R Capta, Sexton 1 F Danae BB tees View ais Is AST SUBCOMMITTEE ON FILLER METAL PROCUREMENT GUIDELINES RA Son, Chi HD. Web, Vise Chair Guta Serer nahn Ls te MT Me Po, Salvesen Sampath RD Thomas. Jr ASW SUBCOMMITTEE ON MOISTURE AND HYDROGEN 1D. Teel, Chair katy [AQ Rlackhain, View Chae. Keon 8. Gupta Sev retan Este Gk Franke Se 8 Quintana M.S, Sierdainc SUBMITTAL OF TECHNICAL INQUIRIES TO THE BOILER AND PRESSURE VI INTRODUCTION (a) This Section provides guidance to Code users for submitting twehnical inguiries to the Committee. See Guideline on the Approval of New Materials Under the ASME Boiler and Pressure Vessel Code in Section Il Pacts C anal D for additional requirements for n addin ical ing inchule requests for revisions oF additions to the Code tales, requests for Code Cases, and requests for Coe inter- pretations, as described below’ (1) Code Revisions. Code revisions ate co aaccommodat juests involving ew pnaterials «0 the Code. Tech dered 10 gical developments. address admin {sirative requirements, incorporate Code Capes. ur toclarty Code intent 12) Code Cases. Code Cases represent altmatives or additions to existing Code mules. Code Cases ase written a a question and reply. and are usually intended tbe incorporated into the Code at a later date, Wh Code Cases prescribe mandatory requirements in the same Sense as the text of the Code. However, users are cautioned used. that-not all jurisdictions or owners automatic iy accept Code Cases, The most common applications for Code Cases ate: a) to permit early implementation of an approved Code revision based on an urgent need (b) to permit the use of 3 new material fir Code construction fc) to gain experience with new materials or alter- native eules prior to incorporation directly into the Code 1A) Code Interpretations. Code Interpretations pro- vide clarification of the meaning of existing sules in the Code, and are also presented in question and reply format [oterpretations do not introduce new requirements. In cases ‘where existing Code text does not fully conve ‘at was dotended, and revision of the rules Is required «0 Support an interpretation. an Intent Intespretation sill be issued and the Code will be revised Ub) The Code rules. Code Cases. and Code Interpretae ‘tons established by the Committee are not tobe considered as approving, recommending, vertifying. or endorsing any Proprietary or specific design, or as hiniging in any way ESSEL COMMITTEE the freedom of manufacturers, constructors, ar nwners (0 ‘choose any method! of design or any form of construction that conforms t0 the Code rules. 4c) Tnquiries that do not comsply with 1 this Appendix or that de not provide sufficient information For the Consmitiee’s full understanding may result in the request being ured 6 the inquirer 2 INQUIRY FORMAT Subroitats to the Committee shall include: a) Purpose, Spoxity one of the following: revision of present Code rules (2) new or additional Code rules 3) Code Case (4) Coxe Interpretation 1h) Backyraund, Provide the information needed for the Xe inquiry, being sure 10 include reference tw the applicable Code Section, Division, Edliion. Addenda. px ul tables, Prefers bly. provide a copy of the specitic referenced portions af the Code Presentations. The ingui attend s meeting of the Committee 19 presemiation oF 10 answer questions from the Conn members with regard to the inquiry. Attendance at a Com mittee meeting shall be at the expense ot the inquirer. The Inquirer's allendance or lack of attendance at a meeting Committee's understanding of sph, Higures shall not bea basis for acceptance or rejection ofthe inguiry by the Committe. CODE REVISIONS OR ADDITIONS Requests thr Code revisions oF additions shall provide the followin (i) Proposed Revisions or Additions. For revisions identity the rules of the Code that requite revision and subsnit a copy of the appropriate rules us they appear in the Code, marked up with the proposed revision. For additions provide the recommended wording referenced to the 1g Code rules. (b) Statement of Need. Provide a brief explanation of the need for the revision or addition. (6) Background information Provide background infor- ‘ation to support the revision or addition, including a data or changes in technology that form the basis for the request that will allow the Committee to adequately evalu ate the proposed revision or addition. Sketches, tables. figures, and graphs should be submitted as appropriate. ‘When applicable, identify any pertinent paragraph in the Code that would be affected by the revision or addition and identify paragraphs in the Code that reference the paragraphs that are to be revised or added. 4 CODE CASES Requests for Code Cases shall provide a Statement af Need and Background Information similar to that defined in 3¢b) and 3(c), respectively, for Code revisions or addi tions. The urgency of the Code Case (e.g. project underway ‘or imminent, new procedure, ete.) must be defined and it ‘must be confirmed that the request is in connection with ‘equipment that will be ASME stamped, with the exception ‘of Section XI applications. The proposed Code Case should identify the Code Section and Division, and be written as a Question and a Reply in the same format as existing Code Cases. Requests for Code Cases should also indicate the applicable Code Editions and Addenda to which the proposed Code Case applies, 5 CODE INTERPRETATIONS (a) Requests for Code Interpretations shall provide the following: (Z) Inguiry. Provide a condensed and precise ques- tion, omitting superfluous background information and, when possible, composed in such a way that a “yes” or a “no” Reply, with brief provisos if needed, is acceptable. ‘The question should be technically and editorially correct. (2) Reply. Provide a proposed Reply that will clearly and concisely answer the Jnquiry question, Preferably. the Reply should be “yes” or “no,” ‘with briet provisos if needed. (3) Background Infarmation. Provide any back ‘ground information that will assist the Committee in under= standing the proposed Inquiry and Reply: (b) Requests for Code Interpretations must be limited {0 an interpretation of a particular requirement in the Code ‘or aCode Case. The Commiziee cannot consider consulting type requests such as the following: (J) a review of calculations, design drawings, weld: ing qualifications, or descriptions of equipment or pars to Uotermine compliance with Code requirements: (2) a request for assistance in performing any Code. preseribed functions relating to, but not limited to, material selection, designs, calculations, fabrication. inspection, pressure testing, oF instalation; (3) a request seeking the rationale for Code require ments, 6 SUBMITTALS Submittals to and responses from the Committee shall ‘meet the following: (a) Submittal. Inquiries from Code users shall be in English and preferably be submitted in typewritten form however. legible handwritten inquiries will also be consid cred. They shall include the name, address, telephone num- ber. fax number. and e-mail address. if available, of the ingui «10 the following adress and be nia Secretary ASME Boiler and Pressure Vessel Commitee ‘Three Park Avenue New York, NY 10016-5990 Axan alternative. inquiries may be submitted via e-mail to: SecretaryBPV @asme.org, (h) Response, The Secretary of the ASME Roiler and Pressure Vessel Committee or of the appropriate Subcom mittee shall acknowledge receipt oF each properly prepared inquiry and shall provi tupon completion of the requested action hy the Code Com mittee € a written response to the inquirer GUIDELINE ON THE APPROVAL OF NEW WELDING AND BRAZING MATERIAL CLASSIFICATIONS UNDER THE ASME BOILER AND PRESSURE VESSEL CODE Code Policy, It is the policy of the ASME Boiter and Fressure Vessel Committee to adopt for inclusion in See- ion II, Part C. only such specitications as have heen slopted by the American Welding Society (AWS), and by bother recognized national or international organizations Ie is expected that requests for Code a mally be for weldin ‘consumable nijtional or intemational:specitication. For consuinables ronale to 4 recognized national or international specitication ther than those of the AWS. the inquirer shall give notice to the standards develop ization that a request has hon mide ) ASME for adoption of their specification under the ASME Code, and shall request that the organiza 19 1 grant ASME permission to reprint ihe standard. For ‘oulier consumables, a request shall be made « the AWS, ‘oe a recognized national or international organizations, to develop a specification that can be presented 10 the Code Committee Iv isthe policy of dhe ASME Boiler and Pressure Vessel Counmittee to consider requests to adopt new eonsunishles for use hy boiler, pressure vessel, or nuclear power plant eamponent Manufacturers or end users. Further. such requests should be for consumables for which these is a reasonable expectation of use in a boiler. pressure vessel, ‘or nuclei posser plant component constructed to the rules ‘oF one af the Sections of this Code. Application. The inyuirer shall identily to the Commit. tee all product forms, size ranges, and specitications for Which incorporation is desired, and state whether of not the consumable is covered by patents, whether oF not iis licensed, and licensed. any limitations on its manufacture, (Brarability. The inquirer shall turnish complete dats on procedure qualification testy made in ‘accordance with the requirements of Section IX. Such tests Stull he made over the full range of base metal thickness in which the consumable ‘sto be used. Pertinent inform ‘non on deposited metal, such as effets from postweld beat 3X. susceptibility © air hardening, effects of josning Processes, expected notch toughness values, and the jannount of experience in-use of the consumable shall be given wermed \ for which thete is reeosnized Physical Changes. For new consumables, iti immportant to know the structural stability: characteristics and the degive of retention of properties with exposure at temper ture. The influence of welding or brazing and thermat treatment operations on the mechanical properties, ductil- ity. and microstructure of the deposited metal are imper- lant. particularly where degradation in properties may facet. Where particular temipeniture ranges of exposure or stent. cooling a nbinations of mechanical and thea ul treatment, fabrication practices exposure to particular environments et.. cause significant changes inv the m properties. microstructure. wce w brrtile Fracture, ete. itis of prime importance ins that should be avoided in service or in mamufacture of party or vessels using the consumable Requests for Additional Data, The Committee may request ditional data, including data on properties or depusited metal behavior not explicitly treated in the con- struction Code in which adoption is desired ‘Code Case, The Code Committee will consider the is ance of an ASME Code Case, to be effective for a period of thrce years, permitting the treatment of a new welding for brazing material under an existing ASME Section IX ‘grouping for qualification purposes, provided that the fol lowing conditions are met (a) The inquirer provides evidence that a request for ‘of the consumable in a specification fas been made to the AWS or a recognized national oF international organization, (b) the consumable is commercially available and can be purchased within the proposed specification require meats: fed the inguirer shows that there will be a reasonable demand for the consumable by industry and that there exists an urgency for approval hy means of a Code Case fay the request for approval of the consumable shall clearly deseribe it in specifi: including applica ble items as scope, provess, manufacture, conditions for delivery, heat teatment, chemical and tensile requirements. testing specitications and requirements, workmanship. fin- ish, marking, inspection, and rejection to call attention to those cond jon form

You might also like