You are on page 1of 114
PUBL 2007 ASME Boiler & Pressure Vessel Code PAL July 1, 2007 VI RECOMMENDED RULES FOR THE CARE AND OPERATION OF HEATING BOILERS ‘ASME Boer and Pressure Vessel Conmatten Subcommittee on Heating B Subgroup on Care and ‘Oberst an of Heating Boilers (SC 1) BUCO U aC a ® Mechanical Engineers Date of Issuance: Jay 1, 2007 (inoludes all Addenda date Luly 3006 apd carer) “This international code or standard was developed under procedures accredied as meting the cher for American National ‘Standards andi an American Natonal Sander. Te Standards Commitee tha approve ihe cove or sandard was lance te svt that inva rom competent and concered interests have hd an oppextnity to pancipae. The proposed code ‘standard wat made available for public review and comment that provides an opportu for aon publi input trom inst, scademia,eegulcory agencies, andthe public aclarge [ASME does not “approve,” “rte,” oe “endorse” any em. connection, proprietary devie, oF acy [ASME does not tke any position with respect 1 he validity of aby patent sighs asseried in conection with any tems mentioned inthis docoment and des ne undertake to inure anyone wlizng a stnard pains abt fo inengemen cf ‘ny applicable leers pees, no assomne any sch bly. Uses of acoder standard are expressly advised hat determination ofthe validity of any sich patent igh, and Ue Fisk of infringement of such righ, ently thei own responsi Prucipation by federal agency repetentative(8) or persons) sited wit indus snot ob imerpeted 3s government ‘or industry endorsement of this ce or standar [ASME secepts esponsibility fr oaly those ntrpeations ofthis document issued in accordance withthe estaNished ASME procedures and polis, which provines the ii0ance of itepretatons by individuals “Tae focnots inthis document are pst of ths Americas National Standard Ce The above ASME symbols ate registered inthe U.S. Patent Office. “ASME: ie the trademark ofthe American Sviely of Mechanical Engines No prof this document maybe repedced in ny fr, a elec tonie revival stem or erwise, without he prior writen permission ofthe publisher. Library of Congress Catalog Card Number: So-5034 Printed i te United Sates f America Adopted by the Coanci of the American Society of Mechanical Enginers 1h Revised 1810, 1941, 1943, 1946, 1939, 1952, 1953, 1956, 1959. (962, 1965, 1958, 1971, 1973, 1977, 1980, 19RS, 19m 1989, 1992, 1995, 199, 2001, 2004, 2007 ‘The American Society ot Mechanical Engineers “Tree Park Avenue, New Voek, NY 10016-5990 Copyright © 2007 ny THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS All Rights Rererved 2007 ASME BOILER AND PRESSURE VESSEL CODE SECTIONS, 1 Rules for Construction of Powter Boilers Wo Muerials Par A — Ferrous Material Specitications Part B — Nonferrous Material Specitieations Pari © — Specifications for Welding Rexls, Electrodes, and Filler Metals Part D — Properties (Customary) Part D— Properties (Metric ML Rules for Construction of Nuclear Facility Components Subsection NCA — General Requirements for Division 1 Division 1 Subsection NB = Class 1 Components Suhweetion NC — Class 2 Components Subsection ND — Class 3 Cumponents Subsection NE — Class MC Components Subsection NF — Supports Subsection NG_ =: Core Support Stewctutes Subsection NH — Class | Components in Elevated Temperature Sersice Appendices ind Division 2 Division 2 — Code for Conciete Containment. Division 3 — Containments tor Transportation anal Storage of Spent Nuclear Fuel and High Level Radioactive Material sind Waste IV Rules for Construction of Heating Boilers V__ Nondestructive Examination VI Recommended Rules for the Care and Operativn of Heating Boilers Vil Recommended Guidelines tor the Care of Power Boilers VILL Rules for Construction of Pressure Vessels Division F Division 2 — Alternative Rules Division 3 — Alternative Rules for Construction of High Pressure Vessels IX Welding and Braving Quali X Fiber Reinforced Plastic Pressure Vessels NP Rules for Inservice Inspection of Nuclear Power Phint Components AIL Rules tor Constr and Continued Seeviee of Transport Tanks ADDENDA Colored-sheet Addenda, which include additions and revisions to individual Sections of the Code, are published annually and will be sent automatically to purchasers of the applicable Sections up (0 the publication of the 2010 Code. The 2007 Code is available only in the loose-leaf format; accordingly, the Addenda will be issued in the Joose-leaf, replacement-page format. INTERPRETATIONS ASME issues written replies to inquiries concerning interpretation of technical aspects of the Code. ‘The Inter pretations for each individual Section will be published separately and will be included as part of the update service to that Section. Interpretations of Section III, Divisions 1 ‘and 2, will be included with the update service to Subsec- tion NCA. Interpretations of the Code are distributed annually in July with the issuance of the edition and subse- quent addenda, Interpretations posted in January at ‘www.cstools asmecorg/interpretations are included in the July distribution, CODE CASE! ‘The Boiler and Pressure Vessel Committee meets regu larly © consider proposed additions and revisions to the Code and to formulate Cases t clarify the intent of existing requirements or provide, when the need is urgent, rules for materials or constructions not covered by existing Code rules, Those Cases that have been adopted will appear in the appropriate 2007 Code Case book: “Boilers and Pressure Vessels” and “Nuclear Components.” Supple- ments will be sent automatically 10 the purchasers of the ‘Code Cases books up to the publication of the 2010 Code, CONTENTS Foreword Statements of Policy Personnel smmary of Changes 1 ral Hol Scope 102 Use of Mlustrations (03 Manufacturer's Information Los Reference to Section IV Las Glossary of Terms 2 ‘Types of Bollers 201 Classification 202 Steel Boilers 203 Cast ron Boilers 2.04 Modular Boilers 2.05 Vacuum Boilers, Figures 2024-1 Horizontal Return Tube. Brich Set 2024.2 Gas Flow Patterns of Scotch Type Boilers 202A-3 Type C Firebox Boiler 202A ‘Thiee-Puss Firebox Boiler, 202A-S Locomotive Firebox Boiler 202A-6 Vertical Firetube Boil 203A Horizontal Sectional Cast Iron Boiler 2.038, Vertical Sectional Cast Iron Boiler 204A ‘Modules Connected With Parallel Piping 2.048 Modlules Connected With Priniary-Secondury Piping 3. Accessories and Installation 301 Safety and Safety Relief Valves 3.02 Low-Water Fuel Cutoffs an Water Feeders 3.03 Traps 304 Air Eliminators 305 Condensate Return Pumps and Return Loop 3.06 ‘Vacuum Return Pump 3.07 Circulators (Circulating Pumps) 3.08 Expansion Tank 309 Oil Prebeaters 2.10 Fuel Oil Storage and Supply Systems 3H Pressure Gage 3.20) Pressure Relieving Valve Revuirements 321 Steam Gages. W rs 4 4 4 4 15 16 16 0 7 18 Is Is Is 1 19 19 19 9 20 20 3.22 323 324 3.25 3.26 327 3.28 3.29 3.30 331 3.32 3.33 334 3.38 3.36 3.37 3.38 Figures 3.01 330-48 Tables 3.20 331C-1 331C-2 3.33 4 4.01 4.02 403 4.04 405 50 5.02 Water Gage Glasses Water Column and Water Level Cont Pressure Control Pressure or Altitude Gages ‘Thermometers ‘Temperature Control . Automatic Low-Water Fuel Cutoff and/or Water Feeding, Device (Steam) Low-Water Fuel Cutoff (Hot Water) Piping. Provisions for Thermal Expansion in Hot Water Systems ‘Stop Valves Bottom Blowoff and Drain Valves Oil Heaters Shutdown Switches and Circuit Breakers Modular Boilers. Vacuum Boilers. Storage Tanks for Hot Water Supply Systems Official Symbol... Safety Valve. Safety Relief Valve Float Type Low-Water Cutoff Electric Probe Type Low-Water Contral ‘Thermostatic Trap Float Trap. Float and Thermostatic Trap Bucket Trap With Trap Closed ‘Typical Return Loop Pressure Gages, . Safety Relief Valve Discharge Pipe ‘Single Hot Water Heating Boiler — Acceptable Piping Installation Hot Water Heating Boilers in Battery — Acceptable Piping Installation Single Steam Boilers — Acceptable Piping Installation ‘Steam Boilers in Battery — Pumped Return — Acceptable Piping Installation Steam Boilers in Battery — Gravity Return — Acceptable Piping Installation Minimum Pounds of Steam Per Hour Per Square Foot of Heating Surface Expansion Tank Capacities for Gravity Hot Water Systems Expansion Tank Capacities for Forced Hot Water Systems, Size of Bottom Blowoff Piping, Valves, and Cocks, Fuels Gas — Natural, Manufactured, Mixed. Liquefied Petroleum Gas (LPG) Fuel Oils Coal Electricity Fuel Burning Equipment and Fuel Burning Controls Gas Burning Equipment Ol Burning Equipment 29 29 30 30 30 30 30 31 31 32 2 38 38 38 39 39 9 20 38 38 38 40 40 40 40 41 41 a 2 5.03 504 Figures S18, sic 502A 5020 5.031 5.032 5.033 6. 601 6.02 603 6.08 6.05 6.06, 6.07 6.08 6.09 801 8.02 803 8.04 8.05 8.06 807 8.08 809 9.01 9.02 9.03 9.08 9.05 9.06 907 Coal Burning Equipment Controls, Atmospherie Gay Burner Combination Fuel Burners High-Pressure Atomizing Burnet Horizontal Rotary Cup Fue! Oil Burner Underfeed Single-Revort Stoker Overthrow Reciprocating Ps Chain Grate Stoker With Se Feed Type Spreasler Stoker jon Showing Links. Boiler Room Fai General Safety Fire Protection Housekeeping Posting of Ceniticates anu! or Licerses Recordkeeping, Logs, Operation, Maintenance, and Repair — Steam Boilers. Starting a New Boiler and Heating System, Starting a Boiler After Layup (Single Boiler In Condensation Cutting in an Additional Boiter Operation Removal of Boiler From Service Maintenance Boiler Repairs Tests and Inypections of Steam He Boilers — Hot Water Boilers and Hot Water Starting a New Boiler and Heating System Starting a Boiler After Layup (Single Boiler Installation: Condensation Cutting in an Additional Boiler Operation Removal of Boiler From Service ‘Maintenance Boiler Repairs ‘Tests and Inspections of Hot Water Heating and Supply Boilers Water Treatment Seope ‘Considerations Services of Water Treatment Specialists Contirmity With Local Ordinances Boiler Water Troubles ‘Chemicals Used Functions of Chemicals 4 4 ay a ay 4 8 4s 4 + 4s 48 48 aN ” if 50 50 a oo on ol 6 3 os or 67 7 6 o 0 68 9.08 9.09 9.10 on 912 ‘Treatment Altematives Blowdown. Feeders Procedures Glossary of Water Treatment Terms MANDATORY APPENDICES Exhibit A Exhibit B Exhibit C Exhibits Maintenance, Testing, and Inspection Log — Steam Heating Boilers Maintenance, Testing. and Inspection Log — Hot Water Heating Boilers Tests. ‘Submittal of Technical Inquiries to the Boiler and Pressure Vessel Committee. ‘Standard Units for Use in Equations NONMANDATORY APPENDIX A Index Guidance for the Use of US. Customary and SI Units in the ASME. Boiler and Pressure Vessel Code 68 68 69 © co) 8s x6 89 FOREWORD The American Society of Mechanical Engineers sot up jcomitee in T9T1 for the purpose of formulating standard boilers and other pres sure vessels, This committee is now called the Boiler and Pressure Vessel Committee The Committee's function i to establish rules of safety relating only to pressure integrity, governing the voasteue of boilers, pressure vessels, transport tanks nd ar components, and inservice inspection for pressure ity of nuclear eomponents and transport tanks. snd ruvamregpret these rules shen questions fullest the construction a st ie regarding Intent, This Code docs no aks other safety issues relat ing tothe construction of boilers, pressure vessels, transport ‘oks and nuclear components, sind the inservive inspection fof nuclear conpements ind transport tanks, The user of the Cade should reter to other pertinent codes, standieds, laws, regulations, or other relevant documents, With few exceptions, the tales do not, of practieal necessity, reflect the likelihood and consequences of deterioration in service related to specitic service Huds or external nperating envi ronments, Revugnizing this, the Commitice has approved 4a wide sariety of gonstruction resin this Seetion 1 allow the user or his designee to select those which will provide’ 1 pressure vessel having. mtgin for deterioration in ser= vive so us 9 give a rewsonably long, Sule period of use: fulness, Accordingly. it is aot intended thst this Section De used ava desis Handbook: rather, engineering juelyonent ‘must be employed in the selection of those sets ot Code rules suitable 40 any specific service or meet. This Code contains mandatory requirements, specitie Prohibitions. and nonmandatory guidance for construction astiyitios, Phe Code does not address all aspects of these activities and those aspects which are not specifically aullressed should not be considered prohibited, The Code is not a handbook and cannot ceplace education, esperi tence, and the use uf engineering judgment, The phrase ceminevring jinkgonet relets to technical judgments msnle by kuowledgeuble designers esperteneed i the applica fot the Code. Engineering juslgments rust he consistent swith Code philosophy snd such judh be used fo overrale mandatory requirements oF spite prohibitions wf the Code: sho. his ro am ancl et utile esi. urn ate, sate, tio et sh tl pcs fle The Commitice secognires that tools used! for desi rnd techniques, and analysis change as technology prog: and expects engineers ti use good judgrent in the fof these tools, The designer is responsible for comply ing with Code rules and demonstrating compliance with Code equations shen such equations ane mandatory The Code neither reyuires nor prohibits the use of comput: srs for the design oF analysis of components consteucted: 1 the requirements of the Cole. However, designers and ny computer programs for design or analysis are cuutioned that they are responsible for all technical assumptions in the programs they use and they are nssponsible for the application of these programs to their design, ‘The Code does not fully address tolerances, When) slmensions, sizes. or other parumetess are aot specified with tolerances. the values of these parameters are consid ered nominal and allowable tolerances ur local variances may he considered acceptable when based on engineering Iuaigment and standard practices as determired by the dosisner The Boiler and Pressure Vessel Committee deals with the care and inspection of boilers and pressure vessels in service only to the extent of providing suggested rules of good p aid 10 owners and their inspectors The rales established by the Committee are not to be Snterpreted as appros ng. recommending. ar endorsing any proprictary or specific design or as limiting in any way the rmanutucturer's freedom to choose any method of design ‘or any form of construction that conforms tothe Code rules, The Boiler und Pressure Vessel Committee meets regu: larly 0 consider revisions of the rules, new rules as dictated hy technological developnient, Cove Cases, and requests lor ions, Only the Boiler and Pressure Vessel e hay the authority to provide official interpe his Caule. Requests for revisions, now rules, Code Cases. oF interpretations shall he asdressed tothe Secretary Un sriing and shall give full pasticulars in ore 10 ee consideration and section ise Mandatory: Appeadis cov rine preparation of technical inquiries), Proposed rev sions to the Code resulting from inquiries will he presented tw the Main Committee for appropriate action. The action of the Main Committce becomes effective only after com Fiemiation by letier ballot of the Committee nd approval by ASME, Conant Proposed revisions o the Code approved by the Commit tee are submitted to the American National Standards Inst tute and published at htyp:/festools.asme.org/esconnect! public/index. cfm? PublicReview= Revisions to invite com- ments from all interested persons. After the allotted time for public review and final approval by ASME, are published annually in Addenda to the Code. ‘Code Cases may be used in the construction of compo nents to be stamped with the ASME Code symbol begin: ning with the date of their approval by ASME. ‘fier Code revisions are approved by ASME, they may be used beginning with the date of issuance shown on the Addenda, Revisions, except for revisions to material specifications in Section II, Parts A and B, become manda. tory six months after such date of issuance, except for boilers or pressure vessels contracted for prior to the end Of the six-month period. Revisions to material specifica tions are originated by the American Society for Testing and Materials (ASTM) and other recognized national or international organizations, and are usually adopted by ASME. However, those revisions may or may not have ‘any effect on the suitability of material, produced to earlier editions of specifications, for use in ASME construction, ASME material specifications approved for use in each. construction Code are listed in the Guidelines for Accept able ASTM Editions in Section Il, Parts A and B. These Guidelines list, for each specification, the latest edition adopted by ASME, and earlier and later editions considered. by ASME to be identical for ASME construction. ‘The Boiler and Pressure Vessel Committee in the formu- lation of its rules and in the establishment of maximum design and operating pressures considers materials, con- struction, methods of fabrication, inspection, and safety devices. ‘The Code Committee does not rule on whether a compo- rent shall or shall not be constructed (o the provisions of the Code, The Scope of each Section has been established to identify the components and parameters considered by the Committee in formulating the Code rules. Questions or issues regarding compliance of a specific component with the Code rules are to be directed to the ASME Certificate Holder (Manufacturer). Inquities con- ‘cerning the interpretation of the Code are to be directed to the ASME Boiler and Pressure Vessel Committee. ASME is to be notified should questions arise concerning Improper use of an ASME Code symbol The specifications for materials given in Section If are identical with or similarto those of specifications published by ASTM, AWS, and other recognized national or intems- tonal organizations, When reference is made in an ASME material specification to a son-ASME specification for which a companion ASME specification exists, the refer- cence shall be interpreted as applying to the ASME material specification. Not all materials included in the material specifications in Section II have been adopted for Code use, Usage i limited to those materials and grades adopted by atleast one of the other Sections of the Code for applica- tion under rules of that Section, Al! materials allowed by these various Sections and used for construction within the scope of their rules shall be furnished in accordance with ‘material specifications contained in Section Il or referenced inthe Guidelines for Acceptable ASTM Editions in Section TL Parts A and B. except where otherwise provided in Code ‘Cases or in the applicable Seetion of the Code, Materials covered by these specifications are acceptable for use in items covered by the Code Sections only to the degree indicated in the applicable Section, Materials for Code use should preferably be ordered, produced, and documented ‘on this basis: Guideline for Acceptable ASTM Editions in Section If, Part A and Guideline for Acceptable ASTM Editions ia Section Hl, Part B list editions of ASME and year dates of specifications that meet ASME requirements, land which may be used in Code construction. Material produced to an acceptable specification with requirements different from the requirements of the corresponding speci fications listed in the Guideline for Acceptable ASTM Editions in Part A or Part B may alsc be used in accordance With the above, provided the material manufacturer or ves- sel manufacturer certifies with evidence acceptable to the ‘Authorized Inspector that the corresponding requirements ff specifications listed in the Guideline for Acceptable ASTM Editions in Part A or Part B have been met. Material produced to an acceptable material specification is not limited as (© country of origin ‘When required by context in this Section, the singular shall be interpreted as the plural, and vice-versa; and the feminine, masculine, or neuter gender shall be treated as such other gender as appropriate STATEMENT OF POLICY ON THE USE OF CODE SYMBOLS AND CODE AUTHORIZATION IN ADVERTISING ASME has established procedures to authorize qualified organizations to perform various activities in accnrdance with the requirements of the ASME Boiler and Pressure Vessel Code. Itis the aim of the Society to provide recogni- tion of organizations so authorized. An organization bold ing authorization t perform various activities in accordance with the requirements of the Code may state this capability in its advertising liverature, Organizations that are authorized to use Code Sy for marking items or constructions that have bee structed and inspected in compliance with the ASME Boiler and Pressure Vessel Code ate issued Certificates of Autho- ication, Itis the aim of the Society 1o maintain the standing of the Code Symbols for the benefit of the users. the ‘enforcement jurisdictions, and the holders of the symbols who comply with al requirements Based on these objectives, the following policy has heen established on the usige in advertising of facsimiles of the symbols, Certificates of Authorization, and reference to Code construction, The American Society of Mechanical Engineers does not “approve,” “certify or nbols endorse” any item, construction, or activity and there shall be no statements or implications that might so indicate, An ization holding a Code Synibol and ora Centiticate of tate in advertising literature shat items, constructions, or activites “are built (produced or por formed) or uetivities conducted in accordance with the requirements of the ASME Boiler and Pressure Vessel Code.” or “meet the requirements of the ASME Boiler and Pressure Vessel Code” ‘The ASME Symbol shall be used only for stamping and nameplates as specifically provided in the Codie. However, facsimiles may e used for the purpose of fostering the tse of such construction, Such usage may be by an associa tion oF a society. or by a holder of a Code Symbol who Uso use the facsimile in advertising show that clearly specified items will cary the symbol. General usage 4s permitted only when all of manufacturer's items are constructed under the rules, ‘The ASME logo. which isthe cloverleaf with the letters ASME within, shall not be used by any organizztion other than ASME, STATEMENT OF POLICY IN THE USE OF ASME MARKING TO IDENTIFY MANUFACTURED ITEMS ‘The ASME Boiler and Pressure Vessel Cale provides rules for the construction of boilers. pressure vessels, and ‘nuclear components. This includes requirements for mate rials, design, fabrication, examination, inspection, and stamping. lems constructed in accordance with all of the applicable rules of the Code ace identified with the of Code Symbol Stamp described in the governing Section of the Code, Markings such as other matking including.” ASME,” “ASME Standard: SME or any ‘oF the various Code Symbols shall not be used on any item that is not con: structed in accordance with all of the applicable require rents of the Code Ttems shall not be described on ASME. Dats Report Forms nor on similar forms referring to ASME that tend to imply that all Code requirements have been met when, in fact, they have not been. Data: Report Forms. covering. items not fully complying with ASME requirements should not refer to ASME or they should clearly identify all excep tions to the ASME requirements, PERSONNEL ASME Boiler and Pressure Vessel Committee Subcommittees, Subgroups, and Working Groups AS of January 1, 2007 MAIN COMMITTEE JONORS AND AWARDS COMMITTEE 6.6 Kimber, Chat & sles 1 R Simkin, ha 6. thug teem, Vie Chor FA Ri 1 Gal, Ne Chi Stnyusaewna, Soontay 6. Ney Ein, Serta fe mes Wf Norm Wy Rie RI foie GC Bak 1 ba 1 Raley Ti str DLA. Bena Borer SD Rava 1G eho SN reser 6. Res 1 Gee D A. Canoneo Ty schut 8 Drab Ade Dat Rv Suave ‘ : ve eae EW, Suan MARINE CONFERENCE GROLP Mca Sv. vores TF Hansen FB. Kovacs, Alternate See bibien C1, Hotimann ROA. Moen, Hemaran iar Dt tanders Member tun 1 Tren Dee Rsk cconrenence consume DLA Dian inks Chas D.C Cok Calor IXECUTIVE COMMITTEE (MAIN COMMITTEE KD Re stab 8A Cis Se eee ae D.C anee Obi and tubal eae GG Katcher, View Chair A Solr ree fete ete LS. Hirruszkiewics, Secretary 19. # Tanner pert bibs aa tel ta RW. Brmes DLA. Canenco, 1-0 1S Alan" Calon M Gino Ne Sn one kim “West ging Gan M Gol AM. Roth, Ex-Ofticiy Member Serene eee Seer es Cera denon lines RL ah esky LR Amin Groen 1B Harlan Des TP Ane <= Rhode Bla Holbesay = Ohwens RD, Aisin “Chad Fyne Pie fs HONORARY MEMBERS (MAIN COMMITIER 1 fab, Nan, and Cnt Cina bitiige FP aon MH jana AUNT Rites Rihgn ——BLJoit amas 8 1 foneer kin Hey Bor zona Katy rah eam 8 Benak 1. Kemmler 1. Bames ign Cra B.Cepuch YG Koen MW éshop Bete AU Kb tre, Cas Uy chelee Peto Columb Canals RTotaw Abo, Cana 1 M4 Callen 16 accary WK Brad = Ns ACA Mah = Flora 10 Day GC lina Home G Feanicl News 1k ae BF Reed DLE Bre Xeishy RD. Atom Wshingon Co Fe io Somers LH Surpew Sine 1, Maul — Son, RC Gain se tim Cane Nima Scam, Ca 06 Neen Pade Coil HOT NE Sinan FL ttene Vox Goahlin See York CONFERENCE COMMITTEE (CONT'D) RD. Mile — Ontario, Canada RS. Pucek — Wisconsin MF. Mooney — 1. E Rors — New rtnewick, Massachuseas Canaca GR Myrick — Arkanses ——_N, Sutees — Saskatchewan, Y. Nogpaul — Hawai Canad Ww. Owens — Louisiana TM. Parks — Texas RP. Pate — Alabama MR. Toth — Tennessee MI. Verhagen = Wisconsin IM. Woshington — New lescy J.D. Payton — Pennsylvania RB. West — lowa M4 R,Peterion — alaska MJ. Wheel — Vermont HD. Plat — South Dakota 0. Wills — Indiana 1.L Pratt — Missouri Zarate — Arizona D.C. Price — Yukon Terctory, Canada BBPV PROJECT TEAM ON HYDROGEN TANKS M.D. Rana, Chave RC Biel, Corespancling G.M. Gisenberg, Secretany Member FL Brown J. Comeron, Conesponding D.A.Canonico Member D.C Cook M.Duncan, Conexponding LW. Febbaum Member Joseph D_R Frkken, Corresponding 1M. Lacy Member NL Newhouse LE Hayden, GB. Rawls ke Corresponding Member 1. RSs, KT Lau, Corresponding N. Sash Member 1-H Smith K Oyamada, Coresponding 5. Staiszewski Member T Tahara CH. Rickin, Covresponding DW. Treadwell Member E Upas San Marchi, Conesponding CTL Webster Member H. Barthelemy, Conesponding 8. Somerday. Corresponding Member Member INTERNATIONAL INTEREST REVIEW GROUP Vv. Felix ¥. Park 5-H. beong ®. Williamson W. Lin ¥. Kim, Delegate ‘SUBCOMMITTEE ON POWER BOILERS (SC) DL. Berger, Char WL. Lowry BW. Roberts, Vice Chair | R. Mackay U. D'Uso, Secretary 1. McGough B.A. Caponico RE Mctavghiin KK Coleman PLA Malvie P.O. Edwards ¥. Oishi 1G. Feldstein 1. Pillow 1. Hainsworth RD. Serueler, TE Hansen IP. Swery. I 1.8. Hunter eM. Tanzosh CF. Jeetngs| RV, Wielgoszinsks 1 P-tibbreche D1. Wills Honorary Members (SC 0) D.N. French RL. Willams WE Somers Subgroup on Design (SC 1 PLA. Malve, Chair IP Lbbrecht GL. Her, Secretary 1G uge MC Coas BW, tne 10. Fishburn RD Shue, J.P, Glaspie LL. sovgle CF eerngs| PS. Fe 6.8 Komors S.¥. Dalen Subgroup on Fabrication and Examination (SC 1 1.7. Pillow, Chair 1.€, Hansen LLL Amola 1. MeGough DL. Beeger RE McLaughlin 5. W. Cameron ¥ Obi GW Gaunes RV, Wielgosrinskt J. Hainswoah Subgroup on General Requirements (SC 1 RE McLaughlin, Chair TC. Gough I. Hainsworth, Secretary 1 Palle G.Cook >. Tompkins P.O. Edwards 5. ¥. Taisen TE Hansen 8 Wilgusrinsh WL Lowry 3.1 Willis F, Mass) Subgroup om Materaly SC BW. Rubens, Chair Hay 1.8. Hunter, Secretary Lise B.A Cononice R. Mackay KK Coleman Fs GW Galones Tanaish KL. Haves Subgroup on Piping SC 1 Hansen, Choir Fost DL Bexyer TC MeGoug P.O. Evanty D.Teesphins G.W. Galanes La ite Heat Recovery Steam Generators Task Group (SC 1 T.E Hansen, Chair EM. Orman, Secretary RW. Antenon BW, sone ALL Plamley RD Schuler ie 1P. Bell 16 Sterna. LR Douglas 5. Tho 1D. Fishburn B Toenphan 6.8 Kamen Sy hk EP Libbrechy he DA Stine Hs tale SUBCOMMITTEE ON MATERIALS (SC Ih Lb Ves, Chae $0 Gl, Vie Che Lata, Seton 1 Abe 1 Aguesal WOR Able \ Apenn SN Bressler 11 Bush A hdint P tally WY Gal 3H, Gilkey 1 Grable (1 Hest PLA. Lakin BK Narn MLL Nasr 1G. Nalett 1.0. Kahn BW, Robs F Shapieo RC Shorts RW. Swindsman Fest Tanzinh BE Thurgood ROX. Mien, Honore 1B kisi, Dodane Honorary Members (SC 1) 41 Avene 1st. Cullen K.Dinsched Ye 1 Day WD Fes Subgroup on External Pressure (SC WS sth, Chr LSA Morrow Stevetins 11 eampbe 1 Geubh | Beer © Sprite i AW deathen scp) Nt Katcher D.C kare E. Michabguoi 0. Nadel CH Sangean Subgroup on Fertous Specifications (SC 1) 1G. Nisbet, Cae 8 Appleton, Vices Choir 8 Mi-Davison 1 St. ingrnan M1 Deadlies 1 sham 16 Gab AM Hott D.C. Keane Lk Ler W.C Blah ok, Mahaney AS Mel KE Owe F Ups B. Zawieasts AAW. Zonta Subgroup on Intemational Material Specifications (tt We Ae ted, Cae A Chawoue, Vie Chair LP Cispie. Secretar DC Aginaal HD Bashtele 1A. Camomice P-Falhowes A Gales 0 0, Hews At Higuchi H Loren ALR Nowening RD. Schuler FA. Steen E ups Kwon, Delggte Subgroup on Nonferrous Alloys (SCH) 1. Raton Cha 1M. Kite, Seve DC Agarval eR Aphiet, I HD Basic MoH. ikon 1 Grubs FL aioe oC Hs AG. Kita Ie 1 kal PA Larkin Hi stanu 1A Moser DT Petes Shop RC utero R Zaina bo Subgroup on Strength, Ferrous Alloys (SC 1) 21 Hesimana, Ca IM. fumzonh So etoy A. Ape Ie Kok Colerain Mt Gol Folin 1 atau anus Hx 1 Wav BWV Rolin M45. Sheth RW Sinden eal 1. PMs fe Subgroup on Physical Properties (SC Ih 1 Gib, Chae 1. Sean 11 Bashi 1 Fathi E Shapins Subgroup on Strength of Weldments (SC HE & SC IXY LF Hens DW Rah 1 Rabe Woh Sper © Thungre Subgroup on Toughness (SCH & SC Vit 88,5 bas, Chae HL wea Basle HE Glan B.C Lam Mekhi © CNet 31, Philips MD. Ran D.A Swanson © Upiie Special Working Group on Nonmetallic Materials (SC 1) CW. Rene Che LE tron res ur MR Keser 4H Whee T Worth SUBCOMMITTEE ON NUCLEAR POWER (SC 1) KW. arn, Par RAL kewee, Hic thine CLA. Sina, Secreta Wot Borer MN: Bressler LR cue RL. Gorman. RU Deuter BA tae R’SHniia 10 Human 1 Fe Lands WC Takes le KA Minaly 1K Monn 10.0. Oyamacls RF Reedy 8 8. Scot 1B. Stevenson ¥.H. Chun, Dede Honorary Members ($C BA Bosna Pf ranch Wb Daly FR. Desh KA. Mower © Subgroup on Containment Systems for spent Fuel and High-Level Waste Transport Packagings (SC UN G.M Foster, Chair A.B, Meichler GJ. Solovey, Viee Chair LE Nickell DK. Monon, Secretary EL. Pleins W. H. Boer 1. Sacgusa G.R Cannel HP Shrivastava EL. Farow NM, Simpson RS Hil i RH Smith D.W. Lewis J.D. Stevenson CG. May CJ Temus PLE McConnell P Tula 1D. Mtnnes A.D. Watkins Subgroup on Design &C ml) R.P. Deubler, Char DF. Landers RS Hill, Vie Chair KA Manoly ALN. Nguyen, Secretary RJ. Masterson 1M Adams W.N. Mclean MN. Beste J.C Minichello CW. Bruny M4, Morishita DL. Caldwell Fe. Naguib IR Cole T. Nakamura RE Cornman, WZ. Novae A.A, Dermenjian EL Prins . Hischberg |. Sato RI eter G.C.Slogis RB. Keating J.B. Stevenson LF Kiel IP. Tucker 1 Kobayashi KR, Wichman ‘Working Group on Supports (SG-D} $C Ml RI. Masterson, Char 1. Saito FJ. Bitch, Secretary J. R.Stinson U.S. Bandyopadhyay 1. G. Fervah R.. Deubler DV. Walshe W. P. Gali ca we ALN. Nguyen ‘Working Group on Core Support Structures (SG-0) ($C Ml) |. F.Kielb, Chair 17 Land 1.6, Mullooly Working Group on Design Methodology (SC-D) RB. Keating, Chair ©. F Landers P-L, Anderson, Seretay’ W. 5. Lapay 1M. Adams H. Locker MK Aang JF. Mccabe RD. Blevins PR Olson D.L. Caldwet! 1.D. Stevenson M. Hateman 1 Yang H. Kobayashi \Werkiag Group om Design of Division 3 Containments (66-0) SCM EL. Pleins, Chair 1. Morn TM. Adams RE, Nickel G. Bjoskman. HP. Shrivastava D.W. Lewis Ch Temas LD. Mennes P Tura 1. Minichiello Working, Group on Piping (SG-D) (SC HN) P. Hirschberg, Chae © F.tanders RG. Fung, Seeriary LF ecahe: Tm. Adas 1G. Minichiella . Basavaraja AON. Newyen I. caplano. 9. 0, Oyamada 1. cole B.D. Pato RJ. Gurda €.C, Radahauih RW. Haupt M5. Sills J. Kawahats G.C Slog RB. Keating eA was V. Kostares caw Working Group on Probabilistic Methods in Design (6G-D) SC 119 RS. Hell, Chav 5.0. kelot Tm, Adams A. MeN 1. Asayama P.1, O'Regan BM. Ayyub NLA. Palen TA. Bacon sate AA, Desmenjian ME, Schmid IM. R. Gravbeal LP Tucker 0.0. Heary RM ison | EV. imbeo ‘Working Group on Pumps SG-D) ($C I) RE Corman, I, Chair F.¥6 Leawit M.D. ttychiou IE, Lisiston ALA, Fraser 1 Rajan M4. Higuehi AG. 'Rashbura GR. fones Working Group on Valves (SG-D) (SC I J.P. Tucker, Chair 1b. Page RR. Brodin 5.N. Shields G A lolly H.R Sondereger W.N. Metean J. Tracoyeanes TA. Mestahon RG. Yall Working Group on Vessels ($6:D) (SC Mt) A Kanne FF Naguib, Chair GK. Miller Seretany CW. Bey GD. Cooper Nt Haneman M. Nakata Ww. Heller RM. Wilson Special Working Group on Envieanmental Elects (8 WZ, Nowak, Chie RS. Hall CL Hosanna 8. Yahowa Yo Hem, Delegate Subgroup on General Requirements (SC Ill & SC 30) W. C Lakochalle, Chait RD. se CA. Lire, Secretary MR. Minick A. Appleton BB. Scot 1. Berry Hk, Sharma WP Gol WER. Somer EA, Mavi Dsl Vashen RP. Melotvre DV. Yelshe Subgroup on Materials, Fabrication, and Examination (SC ty G1 Hoi, Chai 1. Sura 6. Miley, Seertary M. Nakahira WHE Borer C4 Peper 0.4 Dowle SM Simpsun Faster Wf. Sperki 6.8 Georgiew LR Stinson KM. fesce KB Stuckey CO km A.D, Watins sta S Yukawa ‘Subgroup on Pressure Relif (SC 1 So. Hamigon, 0M, Patosky chow ALL Szealn DG Thbaut Subgroup on Strategy and Management {SC IM, Divisions 1 and 2) KW. Barnes, Chr MF. Hosshesmer FR Cole, Secretary RS. 8. & Bobo ey N Rico B HA Het HF, Rew CoM Fa ¥ Urabe 1A Helmey Special Working Group on Editing and Review (SC 1) KF, Reedy, Chir WH Boner MN Breser DL Caldwell 8 P. Deubler BA Erker WC. Lakin he 1D, Stevenson “Subgroup on Graphite Core Components (SC It 1. Burchell, Chaie © Getinean A Sanna. See setary MN. Mttchell RL Graton N,N. Neneh MW. Davies 7 Oe SW Dome 1 Simin 5. Duy JOINT ACL-ASME COMMITTEE ON (CONCRETE COMPONENTS FOR NUCLEAR SERVICE (SC 50) re | Gutierer A Cher i. Vice Cha 1K Harold A Sant Secetor NUE, Heseboin 1 Akhaar TE. Johowe TD. AlShowal NeH. Lee Farts BB Seon HG Asha IRE Shewrnaher Xs gohan 1.0. Stevenson BA Ter A.C Wong Forearm T Wate. Faison Met SUBCOMMITTEE ON HEATING BOILERS (SC 1¥) 1A. Molsie, Chair K a4, Menu 5. Voorhees, Vie Chair BW. Moc G. Maino, Secret EA. Nordatins TA Hevkeus TM Parks 1.6. fsb LL Seigle G Bain RY, Wiekgisrins Peal FP. Barton, Hnoray LP chicoine ‘Member CM Dave RB. Dugg, Hanoxan WoL Haag ‘tomer Pata ROH. Weigel, Honorary 1D. stemier Db benkins LL Woodweeth, Honorary WD temas Member Subgroup on Care and Operation of Heating Boilers (SC 1¥) S$. Vouthees, Chai KM MeTe Tt fedeaus PA stole HL Hoes Subgroup on Cast tron Boilers (SC IV) AM MeTague, Chair PA. batho 1 Budeaus WD. Leman FP thcone CP MeQu Fatal Subgroup on Materials SC IV) PO Larkin, Cha Ww D. Lemen aan 1.1. Seige Subgroup on Water Heaters (SCV) WL Haag. fe ha KOM Metague Callan Schreiner 1D. Guat MOA Tayler WO. Lemos Te Teant Subgroup on Welded Boilers (SC 1¥) TL Boda, Chai EA. Nondtrom Callan HU Sele CM Dove RU, Wielgonzinks WED Lem SUBCOMMITTEE ON NONDESTRUCTIVE EXAMINATION (SC ¥) IL. ates, Chur 1D. R. Quatihbaum, FB. Kovacs, Vice Chae F.1Saler S Vaques, Seen 1H, Clark Ir Honcrary Sy Agri Member IE, Avcck H.C Graber Hooter BS. Hike Somber PA Bremen 0. F Medien, Honorary NY. tamanssn Member AF Gatbolexsky LR. Macks Hanevers GW. Hembree Member RW. keri TG MeCany, Honoran 1b manning Member KD MeGave Subgroup on General Requirements! Personnel Qualifications and Inquiries (SC V) RD. McGuire, Chat GW. Hembse 18 Batey 1. W. Hout ACS. Birks 1. R. MacKay’ N.Y. Faransso JP. Swery. Ie ‘Subgroup on Surface Examination Methods (SC V) AS. Birks, Chair RW. Kaze So] Akin 1D. R. Quattlebaum, J P-L Brown Fy Saale N.Y. Faransso M1 Wheel GW. Hembree ‘Subgroup on Volumetric Methods (SC V) G..W. Hembree, Chit RW. Hardy Sy Aksin RA. keller LE Aycock FB. Kovaes KE Batey RW. Kraak PL Brown -F Manning N.Y. Faransso Sater AF. Garbolevsky ‘Working Group on Acoustic Emissions SG-VM) (SC V) N.¥. Faransso, Chair 1 Aycock LE Batey LF Manning ‘Working Group on Radiography (SC-VM) (SCV) FB. Kovacs, Chair ALF Garbolevsky 5.) Asia RW. Hardy IE Aycock G.W. Hembece IE Batey RW Kru2ie P-L Bown TL Plasek NY. Faransso ‘Working Group on Ultrasonics (SC-VM) (SC Vi RW. Kune, Chair R.A Kellerall 1.6 Aycock JF Manning N.Y. Faranssa| MD. Moles ©. F Hedden FJ Sater SUBCOMMITTEE ON PRESSURE VESSELS (SC Vith TP. Pastor. Chair €.C. Neely K MokWariae, Vice Chair DT Pores S.J Ross, Secretary MJ Pischke RI Basile MD Rana J. Comeron 6.8. Rawls. D.B. Demichael SC Rodents 1. Glaspie C.D. Restor Ma Gold KCL Selieide WS lacobs A. Sete G.G. Karcher FR Sis fe KT Le BA seen 18 tee KK Tam R. Maken F Ups S. Malin FL Thus, fe, Honanary KW tas Ate Miller Subgroup on Design SC VIN) UR ler, Chair 1. Pastor KE Knobloch, secretary MD. Rana ©. A. Barsky GB. Rawls Ir RI. Basie 8.6, Rabens MR Breach CD. Roden FL. Brown, A soln VR Fawr SC. LP. Ghspie 1G. Soins Hinant CH Sturgeon W. § Jacobs A Swanson MD Lower Kk Te RW, Mikio EL Thomas, K. Mokbtaian KA. ple Subgroup om Fabrication and Inspection (SC VIN) ©. Rovtors, Chae ©.D Lamb FA Steen, Vice Char Fst 1 Arnel BR Movelack LF Campbell | Pschke HE. Gordon ML Ree W. 5S. cubs BF Shelley DL kw FP Swe7s ‘Subgroup on General Requirements (SC Vill S.C Raber, Chair AS olan. DB Domvchaol Seertan FL Richie RI Basile Kb. Schneider LP. Gis D.B Stewaa KT tau D.A Son MD, Leer Xk Tae CC. Newt Sebygroup on Heat Transfer Equipment (SC Vi R ahadeon, ¢ BF tench G.Ammnles Suse 8. stayeu SR Bake CR Miller 1H Barbe TW. Neon A anhy F Oseeiller 1G, Campbell RI stasiny M0. Clik S Yokel 1-1 Gonion RM Zale | Hote SM. Cabell, Honore FE Iehto Seve Subgroup om High-Pressure Vessels (SC VIM) 1R. Sins le, Chair 1A kop S. Vasque, Seentiry 5. Keljens L Pama 1. Renal RC Red A K. Khate Df. Bur M1) Man PN. Chak 8.6. Mo RD. Dion oh sae AE, Dap FL Peer Wier 10 bal AM Hones 1 Tat St At Lanes Stent tans Subgroup on Materials (SC Villy camer, Chie WW. Lundy Tot Mungenege Sra 1G. Nebel DC Agrawal 1D. We Rah 1 Gris KC. Sutherlin EL bse [Ups Special Working Group on Graphite Pressure Equipment sc umn S$ Sulone, Choir SR Minch. LD iso, Secretar Sole FA tron A.A. Stupie Special Working Group on igh- Pressure Vessels (SC Vil S. vasques, Seon “Task Group on tmpulsively Loaded Vessels SC Vil RF Nickell Chie I.E Dicake te GA. Anak 1A Duties D.00. Barker Forgan RC. Biel Bt Haralson D.W Bowman HL Het: 21 Caldell UA Ror quer 4 Clayton SR Sim ‘SUBCOMMITTEE ON WELDING (SC IX) 1G Felden, Chai R81 McGate Woh Sperka, Fie Chair BR Newmark -D, Wendler,Sevretan 5.5. Olnase 1D.A, Bower MI. Pischke RA Brown, Ie S.B. Reyna, J 881 Corpenter MI. Rice LP Connor MB. Sims Fb, Flener GoW Spahet LM Given MI Stanko 1.5, Loe P1 Van Fenson We Mt Lundy BR Young Subgroup on Brazing SC 1X) MLL Pische, Choir 1 Bockman LF Campbell SUL Carpenter AF. Gatholennty CF Jeerings| Ve. Swery te ‘Subgroup on General Requirements (SC 1X) BR Newmark Choir HB, Poste PR Bane PL sur 4M lessne KK. ills AS. Olivares Subgroup on Materials (SC 1X) 41 Campenter, Chair Teli 1 Aale 5D Regn 4 temsech Cok. Saine LP Canoe WW 4 Sperko RAM fesse | Stink CO kien RR Youns Subgroup on Performance Qualification (SC 1X) DAS Hye VA fl VS. be UP Conner WeoM Lands Row Cnt KD MeGute PR toa AV HL Sime PD Heer 6. Sp Ext Giser Ie Subgroup on Procedure Qualification SC 1X) 0A Hers, Ch MH Sims MT Rive, Senet WL Spek Mt Berna So Span Sk then | LP sen AS Olnares BL Nan Fesson SD. Regn, 1.0 Wiese Honorary Member iS SUBCOMMITTEE ON FIBER-REINFORCED PLASTIC PRESSURE VESSELS (SC X) 1. tidus, Chaie 1G arp PL Feat, View fa 1 Famer Vonuee Sertetun DL Pinel Ht 1k Richter TW talon 5A Rotor t 4 Shelley DoH Halgkinsan 1 W Van Samm Le tet DO. Yances Ie DAA. Bevler Pa Zehl B.S tinwemsen SUBCOMMITTEE ON NUCLEAR INSERVICE INSPECTION (SC Xt) 6. atk Char WE Sones REY Swaune, Vine thaw Rhyne RL Crane, Sect WK Roget 1 Barts DA. Searth RC Cpa $01 Schaal I D.D Danis Spans Rit Dile sue RL Ging FW. Takano 6 FE Ginger DF askew K. Hts KOA Wee KD kerr (Withee. 5.0 ula BA Yomehinne Gi. tagleder Kx Youn Dew Timon 1 Yuhara T lenny Y SeChang. Pky BR Newton Executive Committee (SC XD RW. Swayne, Chair 0. F. Heddon G.C. Park, Vice Chair CG. MeCargar RL. Crane, Secretary W.E Noris W, H. Bamiord, Ir K Rhyne 0.0. Davis FA Schaaf RL Dyle J.C. Spanner. J RE Gimple E,W. Throckmorton It FE Gregor RA Yooelana Honorary Members (SC XI) Lb Chockie J.P. Houstrup ©. Cowior Lew 0. Hedden PC Riccadella ‘Subgroup on Evaluation Standards (SC x0) Ww. H. Bamford It, Chair K. Koyama G.L Stevens, Secretary DR le RC. Cipolla HS. Meta Coin 1G. Merle GH. De Boo, S.Ranganath BR Gana DLA Scant TJ} Geesbach KR. Wichman K Hasegawa KK. Yoor DLN. Hops Y.-S. Chang, Delegate ¥. imamura Working Group on Flaw Evaluation (SG-£5) SC xb RC. Cipolla, Chaie 1.G. Medle G.H. De Bon, Secretary MA Mitchell WH, Bamord Ie K. Miyazaki M. Baio! R.. Qashu JM. Bloom S. Ranganath BR Gama Py Rush TJ. Griesbach D.A Scarth HLL Gusta 7.5. Schuman FD. Hayes WL Server PH Hoar F.A Simonen .N. Hopkins KR. Wichman Ye imams GM. wikows K Koyama KK, Yoon DR te 5. Yukawa HS. Mebia VA. Ziberstein Working Group an Operating Plant Criteria (SG-t8) (SC XI) T.J. Gresbach, Chait R. Pace KR faker S. Ranganath WH. Bamiord, WoL Sener H Behnke EA Siegel B.A. Bishop FA Simanen T.t Dickson GL Stevens SR Gosselin BP Weaklind S.N. Mal Kk Yoon HS. Meta Working Group on Pipe Flaw Evaluation (SG-£S) (SC XD DLA Searth, Chae K Hasogawa GM. Wihowshi, Secrenry 9H, Hoan, TA. Bacon D.N. Hopkins WH Bamford, Kashima RC. Cipolla HS. soma N.G.Cofe K Mipyzat Sk Dafuar 1S Prnesae G.H, De Boo PLA. Rosh © Friedman KK Yeon. BR Gana VA fitbersten LF Goyete Subgroup on Liquid-Metal-Cooled Systems ($C Xb ©. G. MeCangae, Cha WL chase Subgroup on Nondestructive Examination (SC Xt) 1.€. Spanner. Ir, Chae 1.0. Heavy G.A,Lottnas, Secretary MR um NR Bentley CL Lopler TL Chan HT tines © 8. Cheezem GR Perkins ©. R Cordes AS. feed FJ. Dod FL Schaal. FF Dohme Ch wine ME Gethard Working Group on Personnel Qualification and Surtace, Visual, and Eddy Current Examination (SG-NDE) (SC XI) DR. Condes, Sevvetary DR Quatlebauen, BL Co AS. Reed N. Farenbaugh D. Spake GB. Gece Le Spanner, D.O. Henry C1 Wie 1 Lindberg ‘Working Group on Pressure Testing (SG-WCS) (SC XD) 1. We Lamond, Char ttl IM. Boughman, Secreta 1K ¥eClanahan I. Churewetl A.M Sel GL fechter BL Stingers Kw rll EJ alan Working Group on Procedure Qualification and Volamettic Examination (SG-NDE) (SC XI) M4, Gathoe Choe A Keller GR Paths, Serotay 1. Kush 8 Cheeze Go Laxleser AD. Chuck CoA thus SR. Doctor Cr atser ant) rane FE Dalen & : KV Etacher Salroup on Repair?Replacement Activities $G-RRANSC Xbb KX Nenana ci KD. Kerr Fs Lael ir seca SL Meenuchon $8 Beem H.R. Newton Ro Corset LE Outta 1b. taher Ww. Rogers 18 Geach ROR Sever RF Gimp RW. Sma 1. Graham DF Woskey kA Hearne 1G Woks Vhs CS withers Working Group on Design and Programs SG-RRA) (SC Xi) 18 Garlach, Chae 8. Graham Sc Brae, Sev etar GF Hota 8 LD Bourke RR. Stevernon Gt Hier FW. Sage 10 Fare AH Toate SA Usher TP vassal 1x Camber KA Noha Working Group on Welding and Speciat Repair Process (SG-8RA) (SC XD 1.4, Waskey, Chair Oke RAL Gant Soy one CC in 8) titan Sav PO ther S.1 MeCrashen KA Css 15. Neston SUT Hall | COsalian KA Heemann 1G. Weeks Ps Indian KOR Willers Subgroup on Water-Cooled Systems SC X1 1 Thnuckenertn I, Chae $1. Kult FAL Aguld. Sev eetiee BW. tamnond tL Belew A. MeN Il 188 Bagman WE Noms bob Dave 0 Song 1. Da Le Stairs Lp tis HEM Steins Je 11 ta KB Thins Sb teal RA West 04 Ned GE whos MU Hemet HLL Genes I Atnate Working Group on Containment (SG-WCS) (SC XI 11 uations, Chie Hott 1 Ashar RD. Hough SG. Brown CN. Keshsaceramy KK NC D. Naw. KC Gn 5-€. Perigo FW Cader HM. Stephens Fe St Bers WE Notre Alenste Working Group on ISt Optimization (SC-WCS) (SC Xtt 1 swe, Che SH, Stahindeohir DR, Condes, Setar D.G.Nawjock ROL luenur Secretary AO Thome WL Hamel Ie GE Whimaw, [Ext Bachman Y yuguers kin Working Group on Implementation of Risk ased Examination SG-WCSI SCXD 5.0. Kola, Chow bw Hal AAW Sil I Setay 5 Lamond Lat gold [1 Lindberg SA Mb BK Matty R.A tiabwp HORE SE hes NALrain Cat tedgueno MLA Pyne HD De 1, Semen K Fonagnsse kN Wes ACK Cosbeat 1. Younger Woeking. Group oa Inspection of Systems and Components (SG-WCS) ISC XN, KM Phones, Cane SD Kula 1D. Seany Seeretin BG. Nauk Yo Amentrout 1. Remora GO eles Cx Roe © Cuehebelguennn 81 Ture Hole Awe K, Pagers ety ME He Working Group on General Requirements (SC Mtb Kw Chai Fo Faroe FW Staley, Secretary RK sama ToL cha SK Sent LO ti CS. Wither Special Working Group on Editing and Review (SC XD RW. Swvne, Chair 1 Stators Cb sae 1 une Special Working Group on Plant tite Extension (SC X1) ~8. ate Char Fr ku DLV anges. Serta RU Turner DD Das C6 Youn es Special Woeking Group on High-Temperature, Gas-Cooled Reactors ‘SC XD BF Chair BA Lovkscod, Sevrtan N Becin 1) Schaal le KON Hheming RW Swat Wao Kiel SUBCOMMITTEE ON TRANSPORT TANKS (SC XI A Sel, Choir © Make Phe. Secret: AUR Minn PD Stamp Seertar SE) Phan ALN Antonio 8D Rom ay S Suniszesh Monts AC Toth AA Cotte AP. argh C1 Mahim SY. Sorbie ‘Subgroup on Design and Materials (SC XID Subgroup on General Requirements (SC XID CH. Hochman. Chair M.A. Garrett TW. Alexander KL Gilmore DM Allien JC Rademacher CA. Bes T. Rummel IF Cannon MR. Toth 1. Freier {Wolpe WL Garheld SUBCOMMITTEE ON BOILER AND PRESSURE VESSEL ACCREDITATION (SC-BPVA) W.C LaRechelle, Chair M.A DeVees, Aerate PD. dwards, Vice Chair CE. Ford, Alternate KI. Baron, Secretary TE Hansen, Alevnave M. 8. Doherty G.I Hollinger, Alternate P. Hackord B.L Jeokins, Alternate Kh ty BB, MacDonals, Afernate LE McDonald RD. Mile, Aevoae KM MeTague G.P. Miley, Alternate B.R. Morelock TW. Norton, Alternate 1D. Otteary H.R Stach, Alternate DE. Tanner JA. West, Alternate B.C Turczynski RV. Wielgosrinst, AMernate DE Tate 0. Trapp, Senior Consultant EA White A. Spencee, Honorary G.Byn0g, Abemnate Member SUBCOMMITTEE ON NUCLEAR ACCREDITATION (SC-NA) R.R. Stevenson, Chait W.. LaRochelle, Vice Chav J-Pang, Secretary DE. Tanner DM, Bickery Gyno, Alternate MN. Bressler G Dey, Aternate 5. M. Goodwin PD. Edwards. Alemate KA. Huber JW, Highlands, Altornine 1m. Kot Kom Hotle, Akernate 1. Keane BG Kovank, Alternate CA. tizote PF. Prescot Atemate RP. Meinnyre § Toledo, stern MR Minick EA. White. Alternate HB. Prasse RV. Wielgossinks Alena TE Quita HLL Wiger Altomnate AT, Reber ©. Trapp, Sen Comuttant SUBCOMMITTEE ON DESIGN (SC-D) RI. Basile, Char D.P. Jones RW. Barnes BW. Miki MR Breach UR tale RP. Dealer w J Oo GG, Graven KD. Schuler Ie CL Motinger A Sei RL Jeter Subgroup on Design Analysis (SC.0) G.L Hollinger, Chae K. Matsunaga SA. Adame CA. aller MUR. Beeach WD, Reinhart RG Brown LH. Rewrty RL Gusta G.Sarnazzaw CF. Hebeling 1G. Sepp Ce Hinnane DLA. sansa P. Hiechber Tanah DP. jones EL Thomas 1 Kalnine KA. Whipple wf Koes Subgroup on Elevated Temperature Design (SCD) A eter Chie TE wh Grew T. Asivama KA Meare «ete We O'Donnell DA DsoRe 1.5. Pramas ACH Fas Tt Shun Wed kee 81S. ht S. Majamele RW Swinton Subgroup on Fatigue Strength (SC-D) WJ. ODonnel, Chas B.Psone SA. Adame G. Rhorsbathian PLR Dorssin 5. xijamebie RJ. Gurl T Nohamata CF Hadertng 0H Rea P Misch G Tana he PH HLH Ziad ‘Subgroup on Openings (SC-D) S08 Breach, Chair 1 Maden ROW Shika Secretar DR. Palmer 6.6. Graven 1 mei NOE Hsame MD Bont 1c. tye Fo Rendon RA Lung Special Working Group on Bolted Flanged oints‘SC-D1 RoW witha, Choe cen G.D Bits! PG. SInehermsann HA, Bouedd RW Schnee Ache RN Shee F Mut tly 7 SUBCOMMITTEE ON SAFETY VALVE REQUIREMENTS (SC.SVR) SF tarson, te. Chae 1. P. Glaspie 1A West Hie sir HI Grogs SI Ross Seon WF Hor 1a CA. Neumann S Cammeres TM, Paks AG O.K. Parrish & b.Danay |. Scala DB Demichaat 1 Standias 1 Doeling| Z Wang Subgroup on Design (SC-SVR) LA West Ch Ha Gree C1 eae 1. Slee KD. Panay 1 Patel RI, Doellng TR Tarbay ‘Subgroup on General Requirements (SC-SVR) DB. Demichael hair 1. Parks tt DK Parrish G Brazier 1.98 Rar VP Clspie 198 Richart (8, Neumann 1 Stands Subgroup on Testing ($C.SVR) A&G, Chae w Frat Ve ben KG. Roth S$. Gime Dob Seallan 0 Gooden £.Wane US. Techoical Advisory Group ISO/TC 1 Satety Relief Valves, 1 Beitacqa, Chai ¥-S.ta $1 Ress, Seren D. ile ST Harison LA Wet SUMMARY OF CHANGES The 2007 Faltinn of this Code contains revisvns i alton to the 2005 Edition with 2005 an 200 Addenda The revisions ace identified with the designation O7 in the margin sind, as described in the Fareword, bec cine mandatary six months ailer the publication date of thw 2007 Fdtion. To iaveke these ewsinns before their rmanelatary date, use the designation “2007 Edition” in acumen tequired by this Code. Ht you chaos wt to invoke these revisions before theie mandator date, use the designation “204 Fdition throu the 200K Addenda” in dicumneniation required by ths Code, No revisions are container! in Section VI ut this Fein 2007 SECTION VI 1. GENERAL Lon SCOPE This portion of the rules is intended to cover general descriptions. terminology. and basic fundamentals of heat ing boilers. controls, snd automatic fuel burning equip: ment, Because of the wide variety of makes and {ypes of equipment in use. i is general in scope. 102 USE OF ILLUSTRATIONS. The illustrations used in this Section have been selected {to show typical examples of the equipment referred 1 in the text and are not intended to endorse oF recommend any one manufacturer's products nor are the illustations intended to he used as design criteria or as © preferred configurations of equipment imples of 103, MANUFACTURER'S INFORMATION For detailed information on any specific unit, the Manu fucwurer's information should be consulted Los REFERENCE TO SECTION IV ‘The boilers discussed in this Section will be those limited to the operating ranges of Section LV, Heating Boilers, of the ASME Boiler and Pressure Vessel Code as follows ‘e1) Steam boilers for operation at pressure not exceeding 15 psi (100 KPa) hot water heating and hot water supply boilers for ‘operation at pressures not exceeding 160 psi (1 100 KPa and/or temperatures not t exceed 2S0°F (120°C) Los GLOSSARY OF RMS For terms rekating 10 boiler design. refer w Section IV Heating Boilers, Appendix E, Terminology, For ierms relating t boiler water treatment, refer to 9.12 of this Section, Glossary of Water Treatinent Terms, A. Boilers and General Terms ahsolute pressure: pressure above zero pressure of the gage and atmosphere pressures. accumulator (steuim): a pressure vessel containing water and steam that is used to store the heat of steatn for use al a later period and at some lower pressure, air purge: the reraovail of undesired mutter by replace ment with ait dir vent: valve opening in the tup of the highest dram ‘Fa holler or pressure vessel for Venting ait. Alo a device. manual or automatic. that sill etfeet the renwal of ait from a steam ef hot water heating system, is usually Tocated a the highest point in the systera allowable working pressure: the maximums peessine FOF which the boiler was designed and constructed aalvtade gage: a pressure page calibrated in feel. indie ing the height of the water in the system above the gage usually toad as combina shtitude, anal tem perature gage cambiens temperature pressure the temperature of the stir sur rounding the equipment, datte: & plate or wall for defioe pase: support for boiler Decale! tube end: the so cases or liquid led exposed end of a ried tube when the tube metal is formed over against the sheet in which the tube is rolled beled tube end: see flared ioe end, betlows seal: a seal in the shape of & bellows used 10) prevent air or gas leakage blind nipple: a nipple.of « shor piece of piping tube, closed at one end blowdowor: the difference between the opening and clos ing pressures of a safety or safety reliel sale. Dleavo valves a valve ot cock w the bolton and nee 1 fine of a boiler, that. when opened. permits free ‘of scale and sediment during the biowotl eperation. passa oiler: 9 pressure vessel that incerporites fuel iapat dlevige or migchanism to heat water for space heating or ther purpases oF to vonvert Willer inte steam For use she: boiler in which the tubes contain water ard scum, the heat heing applicd to the outside (ah water surface (1 bent ibe: watcrtabe boiler consisting of 10 Alcuins connected by tubes, practivally allot which, are bent near the ends « permit Fnmeat to che deur Shell on radial fines 12) hortzonbil: & watertube boule in whieh the rain bank of tubes is straight and un a slope of 5 seg te 15 de Irony the horizoncal 2007 SECTION VE (2) sectional header: a horizontal boiler ofthe lon- tudinal or cross drum type, with the tube hank composed ‘of multiple parallel sections, each section made up of front and rear header connected by one or more vertical rows of generating tubes and with the sections or groups. ‘of sections having a common steam drum, (4) box header: ahorizonta boiler ofthe longitudi nal or cross drum type consisting of a front and a rear inclined rectangular header connected by tubes. (5) cross drum: « sectional header or box header boiler in which the axis of the horizontal drum is at right angles to the center lines of the tubes in the main bank. (6) longitudinal dram: a sectional header or box header boiler in which the axis of the horizontal drutn oF ‘deus is parallel to the tubes in a vertical plane, (7) low head: 1 bent tube boiler having three drums with relatively short tubes in the rear bank. (b) firetube: a boiler with straight tubes that are sur rounded by water and steam and through which the prod- ucts of combustion pass, (LD) horicontal return tubular: a firetube boiler con- sisting of a cylindrical shell, with tubes inside the shell attached to both end closures. The products of combustion ‘pass under the bottom half of the shell and return through the tubes. (2) locomotives « horizontal firetube boiler with an internal furnace, the rear of which is a tubesheet directly attached to a shell containing tubes through which the products of combustion leave the furnace. (3) horicomtal firebox: a firewbe boiler with an internal furnace the rear of which is a tubesheet directly attached to a shell containing tubes. The first-pass bank of tubes is connected between the furnace tubesheet and the rear head, The second-pass bank of tubes. passing over the crown sheet, is connected between the front a closures. (4) refractory lined firebox: & horizontal firetube boiler, the front portion of which is set over 4 refractory or water-cooled refractory furnsce, The rear of the boiler shell has an integral or separately connected section con- taining the first-pass tubes through which the products tf combustion leave the furnace, then return through the secondl-pass upper bank of tubes (5) vertical: a firetube boiler consisting of a cylin drical shell, with tubes connected between the top head and the tubeshect. that forms the top of the internal furnace. ‘The products of combustion pass from the furnace directly through the vertical tubes, Submerged vertical isthe same as the plain type above, except that by use of a waterleg construction as a part of the upper tubeshect, it is possible to carry the waterline at aa point above the tap ends of the tubes (6) scotch: in stationary service, 2 firetube boiler ‘consisting ofa cylindrical shell, with one or more eylindri= cal intemal fumaces in the lower portion and a bank of tubes attached to both end closures. The fuel is burned in the furnace, the products of combustion leaving the rear to return through the tubes to an uptake atthe front head: known as dry-back type. In masine service. this boiler has an internal combustion chamber of waterleg construction covering the rear end of the furnace and tubes, in which the products of combustion urn and enter the tubes: known as wet-back (ype. fe) modular: a steam or hot water heating boiler assembly consisting of @ grouping of individual boilers called modules, intended to be installed as a unit, with 3 inlet and a single outlet, Medules may be under one Jacket of individually jacketed. {al} vacuum: afactory-sealed steam boiler that i oper- uted below atmospheric pressure. (e) boiler, steam heating: a boiler designed w convert water into steam, that is supplied t an external space heating system, {(f) boiler, hor water heating: a boiler dk water for circulation through an extern: distribution system, (g) boiler, hot warer suppl: a boiler used to heat water for purposes other than space heating boiler horsepower: the evaporation of 34.5 Ib (15.6 kg) fof water per hour from a temperature of 212°F (100°C) into dey saturated steam at the same temperature equivalent to 33.472 Buu (9.8 kw) boiler inspection: boilers that are fabricated are usually inspected during construction for compliance with Code design requirements. They are also periodically field inspected internally and externally for corrosion or sealing and for the condition of controls sfety devices, etc, Boilers that are cast ure given a hydrostatic test only (each section ‘or the complete boiler): visual inspection by the Author= ized Inspector is not tequited unless local jurisdictions require periodic fleld inspections. boiler layup: any extend! period of time during which the boiler is not expected to operate and suitable prea tions are made to protect it against corrasion, scaling, pit ting, ele., on the water and fice sid dniler trim: piping on or near the boilee that is used for safety, limit, and operating com:rols, gages, water col- umn, ete bond: arctaining or holding high-temperature cement for making a joint between brick or adjacent courses of brick. boss: 2 raised portion of metal of small area and limited thickness on flat oF curved metal surfaces. breeching® 4 duct for the transport of the products oF combustion between the boiler and the stack Dridgewall: a wall in a fornace over which the proxtusts ‘of combustion pass med to heat space heating

You might also like