You are on page 1of 222
PUKKA New Capital City Technical Specifications INFRASTRUCTURE IFC - Rev 01 January 2023 Prepared By: rmc__raafi re 260500 260513, 260519 260526 260536 261216 261300 262213 262300 262413, 262416 262500 262726 262816 263213 263623 265100 265600 281300 283100 337119 rc PUKKA.- New Capital City INDEX DIVISION 26 - ELECTRICAL BASIC ELECTRICAL MATERIALS AND METHODS, MEDIUM-VOLTAGE CABLES LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES GROUNDING AND BONDING CABLE TRAYS, MEDIUM-VOLTAGE TRANSFORMERS MEDIUM-VOLTAGE SWITCHGEAR PREFABRICATED TRANSFORMER SUBSTATION DISTRIBUTION PILLARS AND FEEDING BOXES, SWITCHBOARDS PANELBOARDS LOW VOLTAGE ENCLOSED BUS ASSEMBLIES WIRING DEVICES ENCLOSED SWITCHES AND CIRCUIT BREAKERS DIESEL-ENGINE-DRIVEN GENERATOR SETS AUTOMATIC TRANSFER SWITCHES INTERIOR LIGHTING EXTERIOR LIGHTING DIVISION 28 IP ACCESS CONTROL SYSTEM FIRE DETECTION AND ALARM DIVISION 33 - UTILITIES UNDERGROUND DUCTS AND UTILITY STRUCTURES END OF INDEX Page 1 of 1 rmc ION 260500 - BASIC ELECTRICAL MATERIALS AND METHODS. PART 1 - GENERAL 1 B PUKKA.- New Capital City IFC-Rev.o1 Page 1 of 17 | January 2023 RELATED DOCUMENTS Drawings and general provisions of the Contract, including Conditions of Contract, apply to this Section, SUMMARY, This Section includes the following: 1. General provisions applicable to Division 26 work and other Sections of the Specification that refer to this Section. Supporting devices for electrical components, Electrical identification, Covers, brackets and supports. Electricity-metering components, Conerete equipment bases. Electrical demolition, Cutting and patching for electrical construction. Touchup painting, Electrical Work, unless otherwise specified, includes the supply, installation, testing and commissioning of the complete electrical systems, equipment and materials shown on the Drawings and/or described in the Bills of Quantities and Specification together with all associated ancillary work, support work and builder's work in connection. REGULATIONS AND STANDARDS Regulations: Carry out electrical work in accordance with the current issue of the local codes of practice, local power authority regulations and [Requirements for Electrical Installations ~ IEE Wiring Regulations (BS 7671) as published by the Institution of Electrical Engineers}where not in contradiction with the local codes of practice and regulations, herein referred to collectively as the Regulations’ Conflict: Should an instance occur in this Specification or on the Drawings in which material or construction methods called for is less than minimum requirement of the Regulations, immediately inform the Engineer in writing. Consequent to Engineer's approval, supply the ‘materials and perform the work as though called for to minimum code standards, Standards: Unless otherwise specified, equipment and materials are to be manufactu installed in compliance with the relevant recommendations of tht [FUR CORSTIRUSTION] and approved standards: DORSTRUSTION rms \ SECTION 261500 rmc IEC: The International Electro-technical Commission ISO: The Intemational Standardization Organization CCITT: The International Telephone and Telegraph Consultative Committee CCIR: The International Radio Consultative Committee CISPR: The International Special Committee on Radio Interference ‘ETA: Intemational Electrical Testing Association (tests for site acceptance), IEE: Institution of Electrical Engincers, 8. BS: British Standards, D. Local standards, where enforced and relevant, are to have precedence over the Standards. FE, The contractor is committed to comply with all requirements of SCEDC/Global during execution of work. 14 POWER SUPPLY ‘A. The Local Power Authority will provide incoming power supply and connection at [22KV] to the location shown on the Drawings. B, Power Supply: Liaise with the Local Power Authority to confirm: Characteristics of supply and system earthing. Location of incoming supply shown on the Drawings. Space requirements and associated builder's work for the Authority's installations. Make necessary arrangements at the earliest opportunity to ensure connection as and when required, and inform the Engineer in the event of any foreseen delay. KWH-metering: Liaise with the Local Power Authority and provide necessary instrumentation, enclosures and accessories required by them to effect a complete kWH- metering installation. D. Nominal characteristics of power supply and distribution are as follows: 1. Low voltage: 380V, three phase, 4 wire, solidly earthed nutral 2. Frequency: SOHz. E, Distribution systems ate to be supplied or derived from the voltage system previously described, as shown on the Drawings, or as otherwise specified 1.5 EQUIPMENT A. Equipment Spaces and Rooms: Verify that dimensions, structure, ventilating and cooling arrangements and other provisions in equipment spaces and rooms are suitable for installation, operation and maintenance of proposed equipment. Note any discrepancies on the shop and construction drawings B. Equipment is to be designed for the system voltage and frequency previously described, unless otherwise specified. Special provisions are to be made IPEE power supply fequency and voltage variations and or equipmel ete She Oc TON voltages/frequencies or by direct current sources. rme

You might also like