MARKET FACT
Under construction Thermal Power
Capacity in India – As of Sep’2023
State wise upcoming thermal power capacity in India to be
commissioned by 2028

Swipe left to find out more


infographic story
by eninrac

MARKET FACT
Under Construction Thermal Power Capacity – Northern Region
The northern region is likely to observe fresh capacity addition of 6600 MW by 2024 & in the state of Uttar Pradesh only. Of this total capacity, nearly 3300 MW is to be
added by central players , while another 3300 MW shall be added by the state Genco UPRUVNL. All the new units shall be super critical and above 660 MW.

Under construction thermal power capacity in Northern Region – Status as of Sept’2023

Plant wise key details of upcoming projects


6000
2023 2024 Plant Implementing State Boiler Turbine Technology
Agency
4500 Ghatampur TPP NUPPL Uttar L&T MHPS GE Power Super critical
Capacity in MW

Pradesh Systems
Khurja SCTPP THDC Uttar L&T MHI BHEL Super critical
3000 2640
1980 Pradesh
1980
Jawaharpur UPRUVNL Uttar Doosan Doosan Super critical
STPP Pradesh
1500 1320
Obra C STPP UPRUVNL Uttar Doosan Doosan India Super critical
Pradesh India (GE)
0 Panki TPS Extn UPRUVNL Uttar BHEL BHEL Super critical
Central State Pradesh
Note:
2023 indicates capacity to be added by Nov-Dec 2023

Source: MoP, Eninrac


infographic story
by eninrac

MARKET FACT
Under Construction Thermal Power Capacity – Western Region
The western region is likely to observe fresh capacity addition of 3860 MW by 2028. Chhattisgarh & Madhya Pradesh to contribute nearly 83% of this addition with 1600
MW of capacities upcoming in each state. Upcoming thermal capacities in Chhattisgarh shall be driven by NTPC only, while in Madhya Pradesh, Adani Energy Limited shall
be contributing 100% of the new capacity addition. Of the total upcoming capacity nearly 3200 MW is ultra super critical.

Under construction thermal power capacity in Western Region – Status as of Sept’2023

Plant wise key details of upcoming projects


1000
800 800 800 800 Plant Implementing State Boiler Turbine Technology
800 Agency
660
Capacity in MW

600 Lara STPP Station II NTPC Chhattisgar BHEL BHEL Ultra


h Super critical
400 Bhusawal TPS MAHAGENCO Maharasht BHEL BHEL Super critical
ra
200 Mahan STPP Mahan Energen Ltd Madhya BHEL BHEL Ultra
(subsidiary of Adani) Pradesh Super critical
0
Chattisgarh Madhya Pradesh Maharashtra

2024 2026 2027 2028

Source: MoP, Eninrac


infographic story
by eninrac

MARKET FACT
Under Construction Thermal Power Capacity – Eastern Region
The eastern region is likely to observe fresh capacity addition of 7020 MW by 2028. Thermal capacity additions in the eastern region shall be dominated by Jharkhand,
contributing nearly 53%. As of Sept’2023 Bihar has nearly 1980 MW of thermal power capacity under construction that shall see commissioning by 2024. Approximately,
3720 MW of under construction thermal power capacity in the eastern region is ultra super critical.

Under construction thermal power capacity in Eastern Region – Status as of Sept’2023

Plant wise key details of upcoming projects


3000
2500 2260 Plant Implementing State Boiler Turbine Technology
1980 Agency
2000
Capacity in MW

Barh STPP NTPC Bihar Doosan Power Machine Supercritical


1500 Russia

1000 Buxar TPP SJVN Bihar L&T L&T Super critical


800 660 660 660
660
500 North Karanpura NTPC Jharkhand BHEL BHEL Super critical
STPP
0
Jharkhand Odisha West Bengal Bihar Patratu STPP PUVNL Jharkhand BHEL BHEL Ultra
Super critical
Talcher TPP Station NTPC Odisha BHEL BHEL Ultra
2023 2024 2025 2026 2027 2028 III Super critical

Note:
2023 indicates capacity to be added by Nov-Dec 2023

Source: MoP, Eninrac


infographic story
by eninrac

MARKET FACT
Under Construction Thermal Power Capacity – Southern Region
The southern region is likely to observe fresh capacity addition of 11610 MW by 2028. Thermal capacity additions in the western region shall be dominated by Tamil Nadu,
followed by Telangana. Approximately, 5640 MW of thermal power capacity in under construction in Tamil Nadu as of Sept’2023. Whereas Telangana to observe nearly
4800 MW of thermal power capacity additions till 2025.

Under construction thermal power capacity in Southern Region – Status as of Sept’2023

3000
2400 2200
2500
1980
2000 1600
Capacity in MW

1500
800
1000 800
800 660 370
500

0
Telangana Andhra Tamil Nadu Karnataka
Pradesh

2023 2024 2025 2028

Note:
2023 indicates capacity to be added by Nov-Dec 2023

Source: MoP, Eninrac


infographic story
by eninrac

WANT SPECIFIC MARKET STORY?

WRITE OR CALL TO US
at connect@eninrac.com
+91 93190 48963/47963, +91 72900 16953

Copyright @ eninrac consulting private limited, 2023

You might also like