Septic Tank-Sir Ahlan
Septic Tank-Sir Ahlan
EXCAVATION WORKS
Others
Septic Tank 6.47 cum - - 700 4,528.13
EXCAVATION WORKS - 4,528.13 4,528.13
Construction of Septic/Cistern/Catch
Basin
10mm X 7.5m 24.15 pcs 247.8 5,984.37 74.34 1,795.31
12mm X 7.5m 5.75 pcs 355.6 2,044.70 106.68 613.41
Gravel 1.08 cu.m 3,640.00 3,924.38 1,092.00 1,177.31
CHB 5" 215.63 pcs 22.4 4,830.00 6.72 1,449.00
Construction of Septic/Cistern/Catch Basin 16,822.09 5,046.63 21,868.71
STRUCTURAL WORKS 16,822.09 9,574.75 26,396.84
Total Amount
4,528.13
13
7,779.68
2,658.11
5,101.69
6,279.00