Commissioning report

Machine No: 1
Serial no: XS2024020003
APRIL 2024 Project: Digital Ribbing Machine

COMMISSIONING REPORT
Manufacturer: YongKang Dingjie
Automation Equipment Co.
Ltd
Address: No 998, Jindu Road, Economic Development Zone,
Dongcheng Street
Jinyongkany City
Beijing, P.R. China
Telephone: +86 6188 6718 6622
Website: www.djeauto.com

Customer: Vacuum Tech Mfg (M), Sdn Bhd


Customer Address: PT507) & 15, Lot 14, PT557, Persiaran Sabak Bernam, Section
26, 40400 Shah Alam, Selangor

Contact Person: -
Telephone: 03-5870 3553
Mobile phone: -
Fax: -
Email: -

Commissioning Report - 1
Commissioning report

1 Transportation
General:
Arrival date of the machine: 09/04/2024
Inspection date and location: 10/04/2024
Signature of consignee:
Open box inspection: no yes, done by

Damages:
Packing list: no yes, missing items:
Machine: no yes, what kind of:
Package: no yes, what kind of:
Accessories: no yes, what kind of:
Spare parts + tools: no yes, what kind of:

Actions Taken in Response to Damages:


Photographed: no yes, date:
Reported to the transportation company: no yes, to whom: date:
Reported to the supplier: no yes, to whom: date:
Reported to the insurance company: no yes, to whom: date:

Method of Transportation
Railway Airfreight Truck Mail Shipped by M/S
Other:

Comments:

Commissioning Report - 2
Commissioning report

2 On-Site Inspection

2.1 Equipment/Asset Verification

Specify what is being inspected Vehicle Equipment/Machinery


Tool
Check equipment identification or asset tags Yes No
Comment:

Verify the correct model or version Yes No


Comment:

2.2 Visual Inspection

Inspect for any sign of damage, wear or Yes No


corrosion Comment:

Check fluid levels (if any), Refill if needed. Yes No


Comment:

Inspect any leaks Yes No


Comment:

Confirm the presence and legibility of safety Yes No


labels and warning sign. Comment:

Inspect for loose or missing components. Yes No


Comment:

Verify the cleanliness of equipment or Yes No


ventilation openings. Comment:

Commissioning Report - 3
Commissioning report

2.3 Supplies/Materials

Foundation is checked according to machine Yes No


drawing: Comment:

Possible foundation anchor bolts or sole plates Yes No


are mounted according to instructions: Comment:

2.4 Safety

Identify and mitigate potential hazards Yes No


Comment:

Ensure all safety guards are in place and Yes No


functioning properly. Comment:

Confirm the presence and accessibility of Yes No


personal protective equipment (PPE) Comment:

Check condition of safety belts and etc. Yes No


Comment:

Commissioning Report - 4
Commissioning report

2.5 Operating Environment and Surroundings

Secure the work area and remove any potential Yes No


obstacle or hazards. Comment:

Verify the load stability and load-bearing Yes No


capacity of the ground. Comment:

Commissioning Report - 5
3 Test Run

Start the equipment/machine and let it idle to Yes No


check for any abnormal noises or vibrations. Comment:

Test all operational functions and movements Yes No


(lifting, lowering, steering, braking, etc.) Comment:

Test and ensure the functionality of all Yes No


controls, switches, and buttons Comment:

Check that all safety interlocks and emergency Yes No


shut-off mechanisms are operational. Comment:

Verify that all safety features (lights, alarms, Yes No


mirrors, etc.) are in good working order. Comment:

Verify the accuracy and readability of gauges, Yes No


meters, or indicators. Comment:

Conduct a test run or trial to ensure overall Yes No


performance and functionality. Comment:

Check if there are no fluid leaks Yes No


Comment:

See if all gauges are undamaged and functional. Yes No


Comment:

Verify the accuracy and readability of gauges, Yes No


meters, or indicators. Comment:
Conduct a test run or trial to ensure overall Yes No
performance and functionality. Comment:

Check if there are no fluid leaks Yes No


Comment:

See if all gauges are undamaged and functional. Yes No


Comment:

Calibrate any instruments or sensors as needed Yes No


Comment:

Check power cords or cables for damage or wear Yes No


Comment:

Inspect power sources or generators for proper Yes No


functioning. Comment:

Summary Inspection:

Arrival date of the machine: 09/04/2024


Inspection date and location: 10/04/2024 / Forming 3
Signature of consignee:
4 Machine approval

Research & Development Declaration:

Machine approved for use Date:


Commissioning done by: Name:
Position:
Sign:

Functionality Testing by: Name:


Position:
Sign:

Parameter setting by: Name:


Position:
Sign:

Approved by: I hereby, from all the functionality testing and parameter setting done by
R&D team, this machine will be handover to Production Department.

PRODUCTION DECLARATION:

I HEREBY RECEIVE THE MACHINE AS WHAT IT IS :

Name:
Position:
Sign: