You are on page 1of 20

Building Traffic Management High Speed Passenger Elevator

Nidec's elevator Destination Based Dispatching system (DBD)


DBD Destination Floor Dispatch System dispatches up to 1Om/sand 15 car group control.

111 Chicago North Canal Center, USA


Won the award for "Best Transformation Project in North America in 2015".

2250kg-3000kg: load
2.5 m /s-3.5 m Is: elevator speed
10 multi speed group control:
DBD
Seamless connection between building security system and elevator

Marriott Hotel 12 Units Fulbright Building


TOP Project 4.0-7.0m/s (Traction machine & Control)
7.0 mis Monterey, Mexico 6.0 mis Houston, USA

Hiranandani Bay View


Gift City CNN News Headquarter
High Speed Residential Project Chase Bank Jumana tower
Financial Center Apply DBD Apply DBD 5.0 mis Chennai, India 5.0 mis Chicago, USA 3 mis Doha, Qatar
2.5 mis Gujarat, India 1000kg-1600kg Monterey, Mexico 2.5m/s 1360kg Georgia, USA

Marathon Future
Edinburgh Apply DBD Office Building Apply DBD Arte Plus
2.5 mis Bombay, India 4.0 mis 1600kg Bombay, India 3.0 mis Kuala Lumpur, Malaysia 4.0 mis

22 I Nidec-Elevator Nidec-Elevator I 23

You might also like