Professional Documents
Culture Documents
Self Erector Brochure
Self Erector Brochure
Works efficiently
and looks good.
The 81 K fast-erecting crane.
25% more
jib end lifting capacity
4 different
jib lenghts
SPEED 2 LIFT
Pure two-line operation for
Comfortable cab
maximum handling capacity
with best possible view of the site
Torsionally resistant
Fully automatic play-free tower
connection
MICROMOVE
Millimetric precision with
Integrated intermediate fine positioning
hook heights
Quick-Connection
for play-free connection of the
CC-Ballast
tower to the slewing platform
Contents
Saves time thanks to
boltable ballast slabs Working fast and safe – for sure! Page 4
11 hook heights
Thanks to climbing capability
of tower sections
2 3
45,0 m / 1.400 kg
LI FT MICROMOVE: precision mode for millimetre precision positioning at the push of a button
SPEED 2 nd
x. load a
Secure working movements with load swing damping and wind load control
a y s m a
Alw -line
s p e e d with two
full
operation
4 5
Working fast and safe – for sure!
Loads precisely positioned
With MICROMOVE, at the push of a button on the
control lever, lowering speed is reduced to micro le-
vels. Even the heaviest loads can be precisely sus-
pended and positioned without using the hoist gear
brakes.
kg
kg New – Fast and strong.
m/min
m/min Steady handling
Fast turning movements can lead to swinging loads. The
Rereeving – no longer required integrated load swing damping automatically compensa-
tes for this. A significant step for safety on the building
The 81 K operates exclusively with two-line operation. Ma- site!
ximum performance at full speed – always! With hoists at
maximum lifting capacity and empty hook runs. Hoist speed
always matches the hanging load. By the way – half of all load
cycles are empty runs. We have increased the speed by 15%.
25 %
6 7
Flexible is efficient.
Range with lifting capacity
Adjustable jib in 4 lengths to meet individual requirements
– between 31.0 and 45.0 metres. You profit from custo-
mised lifting curves. 45,0 m / 1.400 kg
42,0 m / 1.650 kg
37,0 m / 2.150 kg
31,0 m / 2.900 kg
45°
30
60 Hz).
0
8 9
Our drive to your success.
Powerful drives manufactured in-house ensuring the highest quality – for decades
10 11
Unrivalled drives.
Strong and sensitive Like the big ones
The strong and precise hoist gear is central requirement Due the stepless speeds of all to FC drives the driving perfor-
for increased handling capacity and safe working. It is mance corresponds to the top slewer and guarantees maxi-
specially manufactured and assembled in-house for this mum handling capacity.
construction crane. For the first time ever in a fast-erec-
ting crane in its class, the hoist gear can lift and lower
all loads absolutely steplessly. The wide rpm enables 2
rope operation at full speed. The intelligent ventilation
system cools the drive to optimum operation temperatu-
res – independent from hoist rpm.
Safe Control
The modern and safety orientated PLC control includes ope-
rating-range limiting system ABB, the interface to the anti-
collision system AKS or machine data recording MDE. The
graphic display offers a simple menu guide and shows all im-
portant operational data in one view. LiDAT offers additional
possibilities for remote diagnosis and data evaluation.
12 13
Exceptionally equipped.
Clear information
With the electronic monitoring system (EMS) the crane driver
has all the important parameters in one view. The display gi-
ves extensive information on loads, driving modes and many
other operational functions.
Safe guying
The jib is mounted with rods. Above all, increased safety and
low maintenance are aimed for in assembly.
14 15
Arrive efficiently.
Compact and flexible when transporting
16 17
Arrive efficiently.
Sleak dimensions You have the choice
Despite the unique standard hook height of the 81 K is compact The modular high-speed and slow-speed axle system or se-
and flexible to transport. Moved as complete, ready assembly mitrailer offers the best transport possibility for every operati-
unit. Fast into operation. onal area. Existing axles can also be used.
15°
Good to manoeuvre
180°
With its steering angle of 180°, the steering axle guarantees
best manoeuvrability.
15,85 m
0m
2,6
80
you get your crane the way to the building a lorry with an ideal
to its destination. site, twin tyres prevent packing size of 2,40 m
sinking. x 1,10 m.
18 19
10,6 - 25,0 m
oney
Fast ballasting with the semi-automatic ballasting device
Save m
draulics!
Comfortable insertion of up to 6 tower sections
t hy
– withou
20 21
Simply well set-up.
Get ready for work The better ballasting
Proceeds through thought out installation kinematics with rope. Assembly The interplay of hoist and assembly winches enables fast and
is also possible at extremely low temperatures. The narrow air assembly comfortable mounting of the counterweight. With the assembly
requires little installation space and and can be carried out with obstructions winch, the tower moves up to 5 metres when unloading the
of up to 25 metres. counterweight. Ballast plates are quickly mounted with the
hoist winch.
25,0 m
CC-Ballast
Choose the right erecting curve depending Bolted ballast plates reduce the time for mounting of
on your operation counterweights by up to 50%. Only 8 hoists are required.
Save time and money!
Fast climbing
Up to 6 tower sections can be inserted comfortably and wi-
thout ground contact.
22 23
Assured long life – maintenance and more.
Remote diagnosis with LiDAT
Skilled personnel
24 25
Assured long life – maintenance and more.
All information at a glance: always and everywhere Original spare parts
LiDAT is a data transmission and positioning system for Liebherr machines Our spare parts are optimally tailored to every Liebherr crane.
and the machines of other manufacturers. Based on stateof- the-art data The quality and functionality is of the highest standard across
transmission technology, LiDAT provides information on the location and ope- the range. For a long life and high operational readiness of
ration of your machines, enabling their efficient management, optimal operation your machines.
scheduling and remote supervision.
Smooth operation
With the central lubricating system the slewing ring is automa-
tically lubricated. Care is never forgotten.
Worldwide
service network
Delivery
A large network of
Liebherr construction cranes.
Liebherr is repre- notable forwarding The development of the first quickly transportable and simple assembly crane over sixty years ago characterises the start of
sented worldwide. agencies guarantee Liebherr’s company history. The Liebherr construction crane programme is multifaceted like no other. It encompasses machi-
You can profit fast and secure trans- nes of all systems and sizes and offers the right lifting technology for high rise building. The flexible fast-erecting cranes and
from this network. portation. powerful top-slewing models prove themselves in residential construction, industrial or large projects throughout the world.
Liebherr is an owner-managed company with long-term organisation. You can profit from this continuity.
26 27
Guindaste de torre / Башенный поворотный кран
81K
Technical data.
62,0 m
59,9 m
37,5m
62,0 m
35,4 m
56,4 m
59,9 m
37,5m
35,4 m 31,9 m
55,0 m
mm
4 4 55,0 m
52,3 m
56,4
3 52,6 m
53,5
4
31,9 m 2 50,2 m
m m
38,6 m 30° 27,8 m
52,353,4
5 1 47,8 m
36,0 m 1400 kg 45°
0 45,4 m
1650 kg
52,8 m
30° 27,8mm
31,7
30° 6
45° 2150 kg
26,5 m 2,0 m
45°
2900 kg 45,0 m
2,0 m
max. 45,5 m
min. 21,0 m
45,0 m 1,9m 3,0 m
45,0 m
1400 kg 16,1 m
15,85 m
max. 45,5 m
min. 21,0 m
1,9m 3,0 m
6 40,4 m*
16,1 m
3,95 m
5 38,0 m
15,85 m 81K
4 35,6 m
42,0 m
1650 kg 3 33,2 m 0,25 m ca. 22500 kg
6 38,9 m
3,95 m
2 30,8 m 2,6 m
5,55 m (6,05 m) 2,3 m
81K
1 28,4 m 7,6 m (8,1 m) 3,2 m
5 36,5 m
0,25 m 0 26,0 m 16,75 m
6 ca. 22500 kg
6 38,9 m 3 2,6
24,6
5,55 m (6,05 m)37,0 m 2,3 m mm 4 34,1 m 15,85 m
5 7,6 m (8,1 m) 3,2kg
m 2 22,2 m
5 36,5 m 2150
16,75 m 1 19,8 m 3 31,7 m
3,95 m
4
4 34,1 m 15,85 m 0 17,4 m 81K
2 29,3 m
3
3 31,7 m ca. 25200 kg
1 26,9 m 0,25 m
3,95 m
4,0 m
7,45 m 2,16 – 2,76m 2 20,7 m
81K
3 16,15 – 16,75 m
3 23,1 m 1 18,3 m 1,25 m
3,50 m ca. 23400 kg
2,75 m 2 0,25 m
0 15,9 m 4,95 m 2,6 m
4,0 m
2 20,7 m 81K
1
81K
8,6 m
1 18,3 m 1,25 m 15,85 m
0 ca. 23400 kg 4,5 x 4,5 m
81K 0,25 m
0 15,9 m 4,95 m 2,6 m
4,5 x 4,5 m
81K
4,5 x 4,5 m
8,6 m
EN 14439:2009–C25 Ausladung
Gewicht und
Weight / Poids / Peso Tragfähigkeit
/ Peso / Pesos / Mасса
Radius and capacity / Portée et charge / Sbraccio e portata
Alcances y cargas / Alcance e capacidade de carga / Вылет и грузоподъемность
15,85 m
4,5 x 4,5 m
m/kg
Gewicht Weight / Poids / Peso / Peso / Pesos / Mасса
m
r = 3,50 m
r =m/kg
2,75 m
35000 kg
40000
20000 kg
kg 15,0 18,0 21,0 24,0 27,0 29,0 31,0 33,0 35,0 37,0 39,0 41,0 42,0 44,0 45,0
13,0
3,0 – 13,3
45,0 6000 6000 5220 4230 3540 3030 2640 2420 2230 2070 1920 1800 1680 1580 1530 1440 1400
* siehe Betriebsanleitung. / see instruction manual. / voir manuel de service. / vedi manuale d'istruzione. / ver manual de instrucción.
r = 3,50 m 35000 kg ver manual 3,0 – 14,1
de instruções. / см. инструкцию по эксплуатации
20000 kg 42,0 6000 6000 5570 4520 3790 . 3240 2820 2590 2400 2220 2070 1930 1810 1700 1650
r = 2,75 m 40000 kg
3,0 – 15,1
37,0 6000 6000 6000 4930 4150 3560 3110 2870 2650 2460 2300 2150
* siehe Betriebsanleitung. / see instruction manual. / voir manuel de service. / vedi manuale d'istruzione. / ver manual de instrucción. 3,0 – 16,3
31,0 6000 6000 6000 5370 4520 3890 3400 3130 2900
ver manual de instruções. / см. инструкцию по эксплуатации.
81K 2
Auslegersteilstellung 30° / Elevated jib 30° / Flèche inclinée 30° / Braccio inclinato a 30°
28 m/kg Pluma inclinada 30° / Lança inclinada 30° / Положение стрелы под углом 30° 29
m m/kg 12,0 14,0 16,0 18,0 20,0 22,0 25,0 26,5 28,0 30,0 31,7 33,0 35,0 36,0 37,0 38,6
81K 2
3,0 – 15,8
Ausladung und Tragfähigkeit Radius and capacity / Portée et charge / Sbraccio e portata
m/kg
m m/kg 13,0 15,0 18,0 21,0 24,0 27,0 29,0 31,0 33,0 35,0 37,0 39,0 41,0 42,0 44,0 45,0
Pure two-line operation MICROMOVE
Aufstellvorgang
45,0 3,0 – 13,3
6000
Erection procedure / Déroulement de montage / Procedimento di montaggio
6000 Procedimiento
5220 4230de montaje
3540 /3030
Sistema2640 2420 / Процесс
de montagem 2230 развертывания
2070 1920 1800 1680 1580 1530 1440 1400 SPEED
Always maximum performance at full Millimetre precise positioning at the touch
3,0 – 14,1
42,0 6000 6000 5570 4520 3790 3240 2820 2590 2400 2220 2070 1930 1810 1700 1650
m speed. of a button.
3,0 – 15,1 55
37,0 6000 6000 6000 4930 4150 3560 3110 2870 2650 2460 2300 2150
131,0
3,0 – 16,3
Standard Aufstellkurven von 06000
6000 6000 537050 4520 3890 3400 3130 2900
bis 6 Turm-
stücken / Standard erecting curves from 0 to
6 tower sections / Courbes de montage
standard de 0 à 6 éléments de mât / Curve 45
di montaggio standard con 0 fino a 6 elementi Auslegersteilstellung 30° / Elevated jib 30° / Flèche inclinée 30° / Braccio inclinato a 30°
torre / Curvas de montaje estándar
m/kg(0- 6 tramosPluma inclinada 30° / Lança inclinada 30° / Положение стрелы под углом 30° 25% more lifting capacity Wind load control
de torre) / Curvas padrão de montagem de
m0 até 6 segmentos
40
12,0 14,0 16,0 18,0 20,0 22,0 25,0 26,5 28,0 30,0 31,7 33,0 35,0 36,0
m/kg de torre / Стандартная 37,0 38,6 In comparison to series precursors. The control reacts automatically to the
монтажная высота с 0- 6 башенными
counter torque on the jib.
секциями 3,0 – 15,8
45,0 3000 3000 3000 2970 2730 2520 2340 2100 2000 1900 1790 1700 1640 1550 1500
35
1460 1400 25 %
2 Erhöhte Aufstellkurve (+4,5 m) am Beispiel
3,0 – 17,7
42,0
von 6 Turmstücken
3000 / Elevated 3000
erecting3000
curve 3000 2960 2740 2540 2290 2180 2080 1960 1860 1790 1700 1650
(+4.5 m) using the example of 6 tower sections 30
Courbe de3,0
37,0 – 21,2 élevée (+4,5 m) en prenant
montage 3000 3000 3000 3000 3000 2910 2630 2510 2400 2260 2150
3000
pour example 6 éléments de mât / Elevata curva
di montaggio 2
3,0 –(+4,5
25,3 m), come per esempio con
31,0
6 elementi3000
di torre / Curva de montaje 3000 300025 3000
3000 elevada 3000 3000 3000 2900 1
(+4,5 m): ejemplo con 6 tramos / Curva elevada CC-Ballast Load swing damping
de montagem (+4,5 m) como exemplo para 6 6
segmentos de torre / Увеличенная монтажная 20
5
Save assembly time through bolted ballast Automatic compensation of jib movements
высота (+4,5 м) на примере 6-ти башенных
секций 4
plates and heavy ballast. for static load.
15
3
2
10 1
0
81K
Simple scaling Fast climbing
0
m -10 -5 0 5 10 15 20 25 30 35 40 45 With only one weight the crane is scaled Up to 6 tower sections can be inserted. Hook
in a few minutes. heights of up to 55 metres can be reached.
Kolli-Liste
Antriebe Driving
Packing List / Liste de colisage / Lista dei colli
Lista de contenido / Lista de embalagem / Упаковочный лист
units / Mécanismes d’entraînement / Meccanismi / Mecanismos / Mecanismos / Приводы
Pos. Anz.
Item Qty. L (m) B (m) H (m) kg
Rep Qte.
Voce Qta. stufenlos / stepless / régl. continu
Turmstück (ohne/mit Turmauflage* ) / Tower section
Pos.
Ref.
Cant.
Cant. (without/with tower support *) / Elément de mât (sans/ 2,50 regl. progressiva
1,10 / sin escalones
1,10 500
Поз. Кол-во avec support de mâtU/min. sem degraus / бесступенчатый
*) / Elemento di torre (senza/con
Low maintenance assembly kinema- Electronic load moment limitation
H
de la flèche / Elemento estensione braccio / Prolongación de pluma 6,20 0,87 0,84 320
L B Vitesse
Extençao da lança / Удлинение стрелы
Marcia 1
6000 0 12,0 temperatures.
4 1 Ausleger-Verlängerung 37,0 m – 42,0 m / Jib extension / Rallonge 400 0 160 70,0
Velocidad 0,87
H
de la flèche
0 / Elemento
60,0 m/min estensione braccio 3,0
/ Prolongación
kW FU de pluma 5,20 0,76
L B
Extençao da lança / Удлинение стрелы Velocidade
5 1 Ausleger-Verlängerung 42,0 m – 45,0 m / Jib extension / Rallonge Передача
H
Go for it!
Printed in Germany by DWS fs-GU LBC 702-06.11-4enGB This information is supplied without liability. Subject to technical modifications.
Liebherr-Great Britain Ltd.
Normandy Lane, Stratton Business Park
Biggleswade, SG18 8QB
Phone: (01767) 60 21 67, E-mail: info.lgb@liebherr.com
www.liebherr.com