ROLLER DETAIL
F Consultant:
PERUNDING ZE
JURUTERA PERUNDING
SWING GATE IN LAYOUT (SWG 1)
CONSULTING ENGINEERS
D D
4 DETAIL C
SWG1
E E
E
N
Campus Keyplan:
90
0
SWG1
135
PE
315
JALAN DIGITAL UTAMA JALAN DIGITAL UTAMA
AT
KIBL '00"
32
292°
18
0
0
27
49°17'50"
225
40.010
RIZAB PARIT 40M
S
W
RIZAB PARIT 40M
RIZAB PARIT 40M
391.889
49°17'50"
18.005
RENTIS PENGHANTARAN ELEKTRIK 2575KV (18m) 2.43 ek
138° 00' 30" 376.107
47°42'40" 151.983
CC SS
PE
F 1
FB F
50"
137°42'40"
18.000
347.179
17'
49°
FA
JALAN DIGITAL 11
262.283
SSU
DETAIL B
30"
311° 44'
SWG1 SWG1
Keyplan:
G
i70 G
A
i i68 i69 A A1 A2
H H
JHB1S0
JOHOR BAHRU ONE SUBSTATION
K
9.5m 9.5m K
Drawing Title
L A L
Construction
22/06/2020 14:50:20
1 : 30
M M
Drawing Number Rev
JHB1SO-RTL-SS-XX-DR-C-5741
File Path
C02