Professional Documents
Culture Documents
21466447-D-4132-EL-DWG-12013-0 - Status A
21466447-D-4132-EL-DWG-12013-0 - Status A
8° Stamps to Create
BOROO - CMOP
A - PROCEED
Authorization to proceed does not relieve Contractor/Supplier of its responsibility
or liability under the Contract.
P N M K H F D C B
PLANT
NORTH LEGEND /
SIMBOLOGY DESCRIPTION
9119167.38 N
804318.36 E A SOFT BARE COPPER CONDUCTOR, 120 mm² (4/0 AWG), ATTACHED TO THE
(SPECIFIC NOTE 4) (SPECIFIC NOTE 4)
Path: \\golder.gds\complexdata\Office\Lima\CLIENT\Boroo_Pte_Ltd\Lagunas_Norte\99_PROJECTS\21466447_CMOP\02_PRODUCTION\DWG\PROD_DRAWINGS\03_ING_DETALLE\05_ELE\ | File Name: 21466447-D-4132-EL-DWG-12013.dwg | Last Edited By: erumiche Date: 2022-12-22 Time:10:20:34 AM | Printed By: ERumiche Date: 2022-12-22 Time:10:26:11 AM
5 D11
D26A D26A
SOFT BARE COPPER CONDUCTOR, 70 mm² (2/0 AWG)
(SPECIFIC NOTE 5) D4 D4 D13A D13A D11
2000 D4
4132-HYS145-M
(TYPICAL) D-0000-EL-DWG-00002 SOFT BARE COPPER CONDUCTOR, 70 mm² (2/0 AWG), IN CABLE TRAY
(SPECIFIC NOTE 2)
TIP. 190
CONNECTION TO EQUIPMENT OR STRUCTURE AND SOFT BARE COPPER
4132-FIL125
4132-HYS125 4132-FIL145 CONDUCTOR, 70 mm² (2/0 AWG), MINIMUM LENGTH FROM THE PVC
CONDUIT IS 3 m, UNLESS OTHERWISE INDICATED
QUANTITY
D26A 4132-FIL130 4132-FIL150
D14 (SEE SPECIFIC NOTE 3)
D-0000-EL-DWG-00004
D13A D26A TIP. 1
D13A 4132-BCR005
LEGEND
4132-HYS130-M 4132-BCR010
T.O.C. = TOP OF CONCRETE
7
4132-HYS155-M
T.O.S = TOP OF STEEL
EL. 4 106.235
T.O.S. D13A
D13A
GENERAL NOTES
4132-FIL135 4132-FIL155
4132-HYS135-M
D13A
(SPECIFIC NOTE 5)
5TH FLOOR SPECIFIC NOTES
D13A
D11 1. THIS DRAWING IS PRELIMINARY, THE CONTRACTOR MUST VERIFY AND
D11
8 D26A D26A VALIDATE THE INFORMATION PROVIDED IN THIS DRAWING.
(SPECIFIC NOTE 4) 2. SOFT BARE COPPER CONDUCTOR 4/0 AWG ATTACHED TO THE METAL
(SPECIFIC NOTE 4)
STRUCTURE ACCORDING TO DETAIL D22A BELOW OF THIS LEVEL FLOOR.
1ST FLOOR 3. THE GROUNDING CONSTRUCTION DETAILS ARE THE TAKEN FROM THE
DRAWINGS: 21466447-D-0000-EL-DWG-00002/00003/00004/00010 AND 00011.
D11 4. SOFT BARE COPPER CONDUCTOR 4/0 AWG, FROM THE LOWER LEVEL.
D-0000-EL-DWG-00003 5. RESERVE COPPER BAR, AVAILABLE TO GROUND EQUIPMENT INSTALLED
TIP. 3 AFTER THE DEVELOPMENT OF THIS ENGINEERING.
6. GROUNDING OF CASES AND SUPPORTS OF INSTRUMENTATION AND
CONTROL PANELS IS PENDING, THE INSTRUMENTATION DISCIPLINE MUST
IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ISO A1
DEFINE THEIR LOCATION.
7. A BARE COPPER CONDUCTOR (2/0 AWG) SHALL BE USED FOR THE
GROUNDING OF EACH TRAY LEVEL, THIS SHALL BE INSTALLED ON THE
OUTSIDE SIDE OF THE TRAY.
SCALE 1/100 /
0 5 000 10 000
1:100 MILLIMETERS
. . CLIENT PROJECT
. .
LAGUNAS NORTE CARBONACEOUS MATERIAL OPTIMIZATION
MINERA BOROO MISQUICHILCA S.A. PROJECT (LNCMOP)
. .
DETAILED ENGINEERING
. . CONSULTANT TITLE
GOLDER ASSOCIATES PERÚ S.A.
. . 0 2022-12-22 ISSUED FOR CONSTRUCTION IAS ERG CVCH DAB AV. LA PAZ 1049, MIRAFLORES
AREA 3 - CIL RESIDUE - FILTER AREA
25 mm
21466447-D-4132-EL-DWG-10007 GROUNDING SYSTEM - VISTA DE PLANTA B 2022-08-04 ISSUED FOR REVIEW AND COMMENTS IAS ERG DYC DAB
LIMA GROUNDING SYSTEM - PLAN VIEW - 5TH FLOOR T.O.S. 4106.235
/
PERÚ
21466447-D-4132-ME-DWG-20007 MECHANICAL ARRANGEMENT - 5TH FLOOR T.O.S. 4106.235 A 2022-07-18 ISSUED FOR INTERNAL REVIEW IAS ERG DYC DAB [+51] (1) 610 1700
PROJECT N° DRAWING N° REV.
www.golder.com
DRAWING N° REFERENCE DRAWING REV. DATE DESCRIPTION DES. CADD REV. APPD. 21466447 21466447-D-4132-EL-DWG-12013 0