EXERCISE SHEET 2
Marine Automation
Course Title
E2
Exercise Code
Creating schematic diagrams and flowcharts illustrating the production, conditioning, and distribution
Exercise Title processes of compressed air.
Briefing 15 minutes
Execution 1.5 hours (1.25 hours per session, 2 sessions per week)
Duration
Debriefing 15 minutes
A-III/1. F2. C1. KUP4: F2.C1.KUP1. Basic configuration and operation principles of the electronic
Knowledge, equipment:
Understanding and
A-III/1. F2. C1. KUP4: F2.C1. KUP2. Functions, characteristics, and features of control systems for
Proficiency
machinery items, including main propulsion plant operation control and steam boiler automatic control
LO1.1.
Learning Outcome Create schematic diagrams and flowcharts illustrating the production, conditioning, and distribution
processes of compressed air.
Machine Shop
Venue/Equipment
● (1:1);
● Cover-all; ;
● Actuators, Sensors, and other various automation and control equipment found in the
laboratory
1:1, 1:4
Equipment Ratio
UC CONTROLLED DOCUMENT
Page 2 of 5
Conduct pre-work inspection for safety checks and risk assessments using work permits and risk
assessment documents before starting machine tools operations and works, emphasizing the practice of
Exercise Outcome a safety mindset safety culture, and vigilance to prevent accidents based on industry standards and
procedures
The exercise will be conducted in the control engineering, each student will be asked to conduct pre-work
Scenario/Exercise inspection for safety checks using work permits and risk assessment documents before working on the
Description training modules.
Each student should wear appropriate PPE such as Cover all and Safety shoes to this procedure.
Initial Condition Consider all times that everything in the workplace is a potential hazard.
The student is unable to conduct proper pre-check safety inspection of the machine shop.
Failure State
UC CONTROLLED DOCUMENT
Page 3 of 5
● Head protection;
● Foot protection;
Selects the appropriate PPE specific to the activity being carried out
● Hand protection;
Safety
● Electrical mats;
___________________________________
UC CONTROLLED DOCUMENT
Page 4 of 5
Student’s Signature over Printed Name
Date:
___________________________________
Instructor’s Signature over Printed Name
Date
Ship Compressed air system mechanical component layout with automation and control:
UC CONTROLLED DOCUMENT
Page 5 of 5