Please be informed that the 1st Amendment of the Environmental Compliance Certificate (ECC)
bearing number ECC-R01-1105-0114 issued by this Office last May 23, 2011, covering the increase in
capacity for the Fuel Refilling Station Project located at Brgy. Bataquil, Pozorrubio, Pangasinan has been
APPROVED.
After satisfying the requirements of the said application, this Bureau has decided to grant a new
ECC reference number for the above-mentioned project, amending the previous ECC Reference No.
ECC-R01-1105-0114 issued by the EMB RO1 last May 23, 2011, and shall be marked as CANCELLED
from the records of this Office. In effect, all provisions in this Amendment shall now prevail over the
conditions cited in the said previous ECC.
With the issuance of this ECC, you are expected to implement the measures presented in the
Environmental Impact Assessment (EIA) Documents intended to protect and mitigate the project’s
adverse impacts on community health, welfare and the environment. Environmental considerations shall
be incorporated in all phases and aspects of the project.
This Certificate does not create any right nor shall be used as an authorization to implement the
project, you may proceed with the implementation only after securing all necessary permits and/or
clearances from other pertinent Government Agencies/Offices that have administrative
jurisdiction over such projects/operations (i.e. DENR, EMB, LGU, DOLE, DOE, HLURB, etc.).
This Office shall be monitoring the project periodically to ensure strict compliance with the stipulations
in the attached ECC.
SUBJECT ONLY to the conditions and restrictions set in this ECC and in the
attached documents labelled as Annexes A and B.
PROJECT DESCRIPTION
The project covers the operation of an 18,000-Gallon (approx. 68.14-
kiloLiter) Total Storage Capacity Fuel Refilling Station project
consisting of five (5) units underground storage tank (2- 2,000 gals./tank,
1- 4,000-gal. tank, 1- 4,000 gals. split-type tank, and 1- 6,000-gals. tank),
office/cashier’s booth, pump station, engine room and other relevant
support facilities; all confined within a 602-portion of the 1,742-square
meter Lot 2-B, Psd-331582 registered under Transfer Certificate of Title No.
257491.
Recommending Approval:
Approved:
TIN
Notary Public
Doc. No.
Page No.
Book No.
Series of
ENVIRONMENTAL MANAGEMENT
1. Adequate and appropriate drainage system, slope protection and/or soil erosion
control measures including other structural measures which conform to the
natural topography shall be constructed/provided to avoid erosion and flooding of
the adjoining properties;
GENERAL CONDITIONS
7. The project operations shall comply with the provisions of RA 8749 (Philippine
Clean Air Act of 1999), RA 9003 (Ecological Solid Waste Management Act of 2000),
RA 9275 (Philippine Clean Water Act of 2004), and RA 6969 (Toxic Substances and
Hazardous and Nuclear Wastes Control Act of 1990), to wit:
Secure a Permit to Operate Air Pollution Source/Control Installations & a
Discharge Permit for Water Pollution Source/Control Facilities;
Designate a Pollution Control Officer (PCO) who shall be duly accredited by
this Office in accordance with DAO No. 2014-02, series of 2014 (Revised
Guidelines for Pollution Control Officer Accreditation);
Submit quarterly Self-Monitoring Report (SMR) to this Office;
8. An ECC Billboard (3’ X 5’) shall be installed at a strategic location at the project
site containing this message: “NOTICE TO THE PUBLIC, THIS [Project Name] of
[Project Proponent] has been issued an Environmental Compliance Certificate
[ECC Ref. No.] by the DENR–Environmental Management Bureau Region 1 on
[Date of Issuance];”
9. The Proponent shall notify the EMB Regional Office and submit an abandonment
mitigating plan for approval at least three (3) months prior to project abandonment;
10. The Proponent shall allow DENR-EMB Personnel with valid identification card and
travel/mission order to conduct inspection/monitoring in the entire premises even
without prior notice to monitor compliance with ECC conditions and other
environmental laws, and implementation of approved EMP. Further, on-the-spot
monitoring and inspection may be initiated by the DENR any time in coordination
with concerned parties;
II. RESTRICTIONS
11. No other activities shall be undertaken other than what were stipulated in the EIA
Documents. Any expansion of the project beyond the project description, or any
change in the activity or transfer of location shall be the subject of a new
Environmental Impact Assessment; and,
12. Transfer of ownership of this project shall carry the same conditions and
restrictions in this certificate and the transferee shall be required to notify the EMB
RO1 within fifteen (15) days from the transfer of ownership to allow the necessary
changes brought about by such transfer.