You are on page 1of 2

Page 1 of 2

Republic of the Philippines


Department of Environmental and Natural Resources
ENVIRONMENTAL MANAGEMENT BUREAU
Region I
EMB Office, DENR Building, Government Center Barangay Sevilla,
City of San Fernando La Union
Tel No: (072) 700-24-48

Permit No.: DP-R01-22-09616


Date: Oct 28, 2022
Renewal
WASTEWATER DISCHARGE PERMIT

Pursuant to Section 14, Article 2, of the RA 9275 otherwise known as the "Philippine Clean Water Act of
2004", this permit is hereby granted to Charlot Gonzales with office address at Purok 6, Bacnono,
Bayambang, Pangasinan for its establishment:

Chix To Go Dressing Plant Purok 6 Bacnono BAYAMBANG

TIN No. 000-000-000

1. This permit holder shall discharge wastewater generated from the operation of Slaughtering and Meat
Packing to 3 units Septic Tank for Treatment; effluent not to exceed a Discharge Flow Rate of 5.6 cubic
meters per day.
2. Nearest receiving body of water: Agno River, and effluent shall conform to Class C Water Standards.
Significant effluent quality parameters for analysis by DENR recognized environmental laboratory shall
include the following:

Parameter Standard Parameter Standard


Phosphate 1 mg/L
BOD 50 mg/L

TSS 100 mg/L Oil and Grease 5 mg/L


Ammonia 3 Degree Celsius
0.5 mg/L Temperature
Change
Nitrate 14 mg/L
pH 6.0 - 9.5

* Reference for effluent parameters: DAO 2016-08; PSIC Code - 10110


3. Submit Self-Monitoring (SMR) based on the following schedule:

Quarter Coverage Submission Quarter Coverage Submission


First Jan-Mar 1-15 Apr. Third Jul-Sep. 1-15 Oct.
Second Apr-Jun. 1-15 Jul. Fourth Oct-Dec. 1-15 Jan.

4. Install monitoring equipment i.e. water meter, etc., for the determination of water consumption and
effluent discharge.
5. The permit holder shall allow entry of authorized EMB technical personnel to conduct
inspection/investigation of subject establishment or facility and compliance monitoring within your
premises.
6. This permit shall be adequately framed and posted at a conspicuous place at the plant/establishment.
7. Conduct wastewater sampling annually per source and submit analyses of effluent for parameters
tabulated in Condition No. 2. Further, generated domestic wastewater shall be regularly desludged by
an accredited desludger of the DOH. A certificate of treatment or receipt from the desludger must be
secured for the approval of Discharge Permit. Date of desludging shall not be greater than one (1) year

This is a computer generated certificate. To verify the authenticity of this file, kindly
scan the generated QR Code using your QR Code scanner/reader or visit the OPMS
website for details.

Protect the environment ... Protect life...


Page 2 of 2

from the date of submission at EMB-1.


8. The permit holder shall appoint/designate a Pollution Control Officer (PCO) and shall secure
accreditation pursuant to Section 8 of DENR Administrative Order No. 2 Series of 2014, the Revised
Guidelines for Pollution Control Officer Accreditation.
9. Application for renewal of this Permit shall be filed on or before its expiry date.

This permit is valid up to Oct 28, 2027, unless revoked or suspended by this Office in writing.

Non-compliance with the above conditions and/or any pertinent provisions of RA 9275 otherwise knows as "Philippine Clean
Water Act of 2004", a corresponding penalty in the amount of P10,000-P200,000 per violation shall be imposed.

Recommended by: Approved by:

Permit Fee : Php 10000.00 O.R. No. : 226-10072022-370031 Date : July 10, 2022
Water Discharge Fee : Php 1965.60 O.R. No. : 226-10072022-370031 Date : July 10, 2022
Filing Fee : Php 55.00 O.R. No. : 226-10072022-370241 Date : July 10, 2022
PD1856 : Php 10.00 O.R. No. : 226-10072022-370241 Date : July 10, 2022
Documentary Stamp Tax : Php 30.00 O.R. No. : 226-10072022-370241 Date : July 10, 2022

This is a computer generated certificate. To verify the authenticity of this file, kindly
scan the generated QR Code using your QR Code scanner/reader or visit the OPMS
website for details.

Protect the environment ... Protect life...

You might also like