You are on page 1of 4

ABDUL RAOOF

ELECTRICAL ENGINEER

OBJECTIVE:

Intend to build a career with leading corporate of hi-


tech environment with committed & dedicated
CONTACTS: people, which will help me to explore myself fully
and realize my potential. Willing to work as a key
 00966 543925560. player in challenging & creative environment.
 00966 531678938.
✉raoofabdul35@gmail.com.
SUMMERY:
Total Experience: 12+ • Experience in installation of LV and Low current
Years. system.
• Skilled in installation of Switchgears,
Registered in SAUDI
Transformers, RMU, Distribution Boards,
COUNCIL OF ENGINEERS
Grounding and lightning protection system and
(ID 218544)
Cable trays, etc.
Education: • Aware of single line riser diagram for Low
Current System such as Fire Alarm, Layout
Bachelor of Technology in diagram for Multimedia Network System such as
Electrical and Electronics Public Address System, Access Control, CCTV
Engineering from Jawaharlal System, Telephone and Data system, etc.
Nehru Technological
• Aware of coordinating with various trades to
University. Hyderabad, expedite works and to avoid repetitive works.
INDIA.
• Strong supervisory, time management and
coordination skills.
• Skilled in testing, repairing, and maintaining
COMPUTER SKILLS: electrical systems.
• MS-Office Excel and Word. • Adequate understanding of standard electrical
• AUTO CAD. control systems.
• Excellent oral and written communication skills.
• Remarkable planning and organizational skills .
• Preparing Quantity Take-off of material, MSR
and IRs.
EXPERIENCE:
LANGUAGES:
• Currently working in Advance construction
• English For Contracting Co. As Electrical QC
• Arabic Engineer in Al Salam Royal Palace, Jeddah
• Urdu (Saudi Arabia).
• Hindi Project: B57 Building, (Royal Kitchen and
• Telugu offices),
Client: CPPA.
Consultant: DAR Engineering.
PMC: Currie & Brown.
Driving License: KSA • Worked as an Electrical QC Engineer from
April 2022 to March 2023 in Advance
PERSONAL PROFILE: construction For Contracting Co. in Sharma
Palace, SHARMA (Saudi Arabia).
S/O: Mujib Ul Haq, Project: Z2 phase 1(Staff Accommodation &
service Buildings).
Age: 37. Client: CPPA.
Nationality: Indian. Consultant: DAR Engineering.
PMC: Parsons.
Religion: Muslim. • Worked as Electrical Project Engineer in
Interior Selection Furniture Factory at Dubai
Marital status: Married.
International Airport Terminal 2, (UAE).
Project: Ware House & Offices, DHL Hub,
Client: DHL HUB.
Consultant: Airport Authority.
• Worked as an Electrical Site Engineer from
Aug 2014 to Sep 2015 in AL Qahtani Fisk
contracting company (Saudi Arabia).
Project: Admin Building & 6 No’s
Warehouses at Dammam.
• Worked as an Electrical Site Engineer from
Apr 2009 to Apr 2013 in AL Rajhi Saudi
groups, Riyadh. (Saudi Arabia).
Project: King Faisal Residential Buildings.
Client: National Guard.
Consultant: Atkins.
• Worked as an Electrical Engineer from Oct
2007 to Feb 2009 in GSR Sugars private
Limited (India).
RESPONSIBILITIES AS QC:

• Responsible for Plan, Schedule and organize site staff, material, and activities as per the
scheduled progress plan.
• Reporting to QA/QC Manager or Construction Manager or Project Manager to Daily,
Weekly, Monthly activities report, and update follow up to Supplier for material delivery
with time to site.
• Performing Filed inspections in compliance with National Electrical Codes and approved
Shop Drawings.
• Follow strictly with MTS (Master Time Schedule).
• Reviewing project deliverable for compliance with quality criteria.
• Maintaining project wise required Quality records.
• Maintain and Coordinate with the QA/QC Manager follow up client for NCR (Non
ConformanceReport),PL(PunchList),FDC(FieldDesignChange),ECC(ErectionCompletio
n Certificate),TOC(Test On Completion),RFI(Request For Inspections),EWC(Extended
Warranties Certificate) and all close outs.
• If analyze any non-conformity noticed and take appropriate corrective and preventive
actions, resolving NCR’s.
• Coordinate with Document Controlling Department to maintain and monitor the updating
of all records of the company.
• Leading the team for QA/QC Inspectors.
• Making RFI (Request for Inspection) for consultants.
• NCR Follow up till close outs.
• Preparation of IAT (installation Acceptance Test) Documentation.
• Conducting quality assurance and quality control inspections and weekly reporting.
• Installation, testing and commissioning of Power panels, low voltage switchgears, MCC
panels, lighting panels.
• Preparation of Method Statements, Inspections & Test Plan and lifting plan.
• Resolving the technical issue arises on daily basis on site.
• Inspection of cable laying (Power Cables), Low Voltage Power Panels, Dry Type
Transformers, Cable Trays & Conduit Installation, Earthing System Installation.
• Co-ordination with Consultant for Inspection.
• Review Material Take off to Ensure Compliance with Project Requirement.
RESPONSIBILITIES AS SITE ENGINEER:

• Installation of Medium Voltage, Low Current, Low Voltage Electrical Systems, MICC
cables.
• Supervise installation of Switchgears, Transformers, MV Panels, Distribution Boards,
battery charger, UPS system, grounding and lightning protection system, Cable trays,
local control stations etc.
• Provide Temporary Power Supply for work execution.
• If analyze any non-conformity noticed and take appropriate corrective and preventive
actions resolving NCR's.
• Coordination of works with other systems at site.
• Preparing daily, weekly and monthly activity and progress reports.
• Execution and Coordinating in Installations and Commissioning jobs with other
departments like Mechanical, Civil.
• Validate works quality and conformity with agreed standards and industry best Practice.
• Ensured that materials are timely in place for the projects.
• Carrying out the work according to the approved drawing.
• Attend meetings with client together with Superior's when needed.
• Direct supervision and give technical instruction to the foreman for the assignment
handed over and make sure that the job is done as per specifications and standards.
• Prepare correct RFQ Schedule and follow it as the work gets completed.
• Ensuring that all materials used, and work performed approved as per specifications and
based on the approved drawings as per standards of the project.
• Resolving any unexpected technical difficulties and other problems that may arise on site.
• Communicates ongoing work schedules and project progress with on-site team and upper
management when requested.

I hereby declare that the information furnished above is true to the best of my knowledge.

Regards,

Abdul Raoof

You might also like