DRAWING LIST DETAIL ENGINEERING DESIGN (D.E.D) PT. SASA INTI MINSEL
NO.SHEET CODE DESCRIPTION APPROVAL NOTED

1 GBI.14-SASA-WWTP.DED.001 BOTTOM VIEW APPROVE -

2 GBI.14-SASA-WWTP.DED.002 TOP VIEW APPROVE -

3 GBI.14-SASA-WWTP.DED.003 VIEW A & B APPROVE -

4 GBI.14-SASA-WWTP.DED.004 SECTION X & Y APPROVE -

5 GBI.14-SASA-WWTP.DED.005 DRAINAGE LAYOUT APPROVE -

6 GBI.14-SASA-WWTP.DED.006 JALUR AIR BERSIH & LAYOUT APPROVE -

PT. GRINVIRO BIOTEKNO INDONESIA


DRAWING LIST DETAIL ENGINEERING DESIGN (D.E.D) PT. SASA INTI MINSEL
NO.SHEET CODE DESCRIPTION APPROVAL NOTED

1 GBI.14-SASA-WWTP.DED.001 BOTTOM VIEW APPROVE -

2 GBI.14-SASA-WWTP.DED.002 TOP VIEW APPROVE -

3 GBI.14-SASA-WWTP.DED.003 VIEW A & B APPROVE -

4 GBI.14-SASA-WWTP.DED.004 SECTION X & Y APPROVE -

5 GBI.14-SASA-WWTP.DED.005 DRAINAGE LAYOUT APPROVE -

6 GBI.14-SASA-WWTP.DED.006 JALUR AIR BERSIH & LAYOUT APPROVE -

DRAWING LIST
DRAWING LIST CIVIL PT. SASA INTI MINSEL
NO.SHEET CODE DESCRIPTION APPROVAL NOTED

7 GBI.14-SASA-WWTP.CIV.000 PILING PLAN OVERALL - -

8 GBI.14-SASA-WWTP.CIV.001 EQUALIZING TANK/PRECON (A1) PILING PLAN - -

9 GBI.14-SASA-WWTP.CIV.001-A EQUALIZING TANK/PRECON (A1) PEMBESIAN - -

10 GBI.14-SASA-WWTP.CIV.002 ANAFLOAT BIO-01 TANK (A2) PILING PLAN - -

11 GBI.14-SASA-WWTP.CIV.002-A ANAFLOAT BIO-01 TANK (A2) PEMBESIAN - -

12 GBI.14-SASA-WWTP.CIV.003 ANAFLOAT HS-01/DGF TANK (A3) PILING PLAN - -

13 GBI.14-SASA-WWTP.CIV.003-A ANAFLOAT HS-01/DGF TANK (A3) PEMBESIAN - -

14 GBI.14-SASA-WWTP.CIV.004 ANAPAK FX-01 TANK (A4) PILING PLAN - - PT. GRINVIRO BIOTEKNO INDONESIA

15 GBI.14-SASA-WWTP.CIV.004-A ANAPAK FX-01 TANK (A4) PEMBESIAN - -

16 GBI.14-SASA-WWTP.CIV.005 AERATION TANK (A5) PILING PLAN - -

17 GBI.14-SASA-WWTP.CIV.005-A AERATION TANK (A5) PEMBESIAN - -

18 GBI.14-SASA-WWTP.CIV.006 CLARIFIER TANK (A6) PILING PLAN - -

19 GBI.14-SASA-WWTP.CIV.006-A CLARIFIER TANK (A6) PEMBESIAN - -


SECONDARY CLARIFIER TANK (A6) DENAH KOLOM DAN
20 GBI.14-SASA-WWTP.CIV.006-B - -
DETAIL
SECONDARY CLARIFIER TANK (A6) DENAH PELAT LANTAI
21 GBI.14-SASA-WWTP.CIV.006-C - -
ATAS
22 GBI.14-SASA-WWTP.CIV.007 DETAIL CONTROL BASIN TANK (A7) - -

23 GBI.14-SASA-WWTP.CIV.008 DETAIL SLUDGE & FILTRATE TANK (A9 & A10) - -

24 GBI.14-SASA-WWTP.CIV.009 DETAIL INTERMEDIATE TANK (A11) - -


DENAH DAN DETAIL PONDASI BATU PECAH
25 GBI.14-SASA-WWTP.CIV.010 - - DRAWING LIST
BLOWER ROOM. & CHEMICAL STORAGE (A8)
DENAH KOLOM & RING BALOK
26 GBI.14-SASA-WWTP.CIV.010 A - -
BLOWER ROOM. & CHEMICAL STORAGE (A8)
DENAH STRUKTUR ATAP
27 GBI.14-SASA-WWTP.CIV.010 B - -
BLOWER ROOM. & CHEMICAL STORAGE (A8)
POTONGAN A-A & B-B
28 GBI.14-SASA-WWTP.CIV.010 C - -
BLOWER ROOM. & CHEMICAL STORAGE (A8)
POTONGAN C-C
29 GBI.14-SASA-WWTP.CIV.010 D - -
BLOWER ROOM. & CHEMICAL STORAGE (A8)
DRAWING LIST CIVIL (CIV) PT. SASA INTI MINSEL
NO.SHEET CODE DESCRIPTION APPROVAL NOTED
DENAH DAN DETAIL PONDASI BATU PECAH
30 GBI.14-SASA-WWTP.CIV.011 - -
CONTROL ROOM (A12) & LABORATORY (A13)
DENAH KOLOM & RING BALOK
31 GBI.14-SASA-WWTP.CIV.011 A - -
CONTROL ROOM (A12) & LABORATORY (A13)
DENAH DAN DETAIL DAK ATAP
32 GBI.14-SASA-WWTP.CIV.011 B - -
CONTROL ROOM (A12) & LABORATORY (A13)
POTONGAN A-A & B-B
33 GBI.14-SASA-WWTP.CIV.011 C - -
CONTROL ROOM (A12) & LABORATORY (A13)
POTONGAN C-C
34 GBI.14-SASA-WWTP.CIV.011 D - -
CONTROL ROOM (A12) & LABORATORY (A13)

35 GBI.14-SASA-WWTP.CIV.012 DENAH TITIK STRAUSS PILE DAN PILECAP (AREA SHELTER) - -


DETAIL STRAUSS PILE DAN PILE CAP
36 GBI.14-SASA-WWTP.CIV.012 A - -
(AREA SHELTER)
PT. GRINVIRO BIOTEKNO INDONESIA
DENAH PEDESTAL DAN KOLOM BAJA
37 GBI.14-SASA-WWTP.CIV.012 B - -
(AREA SHELTER)
DENAH STRUKTUR ATAP DENAH RAFTER & BEAM
38 GBI.14-SASA-WWTP.CIV.012 C - -
(AREA SHELTER)

39 GBI.14-SASA-WWTP.CIV.012 D DETAIL JOINT RAFTER DAN OVERSTEK (AREA SHELTER) - -

40 GBI.14-SASA-WWTP.CIV.012 E POTONGAN (AREA SHELTER) - -

DRAWING LIST ARSITEK (ARS) PT. SASA INTI MINSEL


NO.SHEET CODE DESCRIPTION APPROVAL NOTED

41 GBI.14-SASA-WWTP.ARS.001 POTONGAN CONTROL ROOM & LABORATORY - -

42 GBI.14-SASA-WWTP.ARS.002 TAMPAK BANGUNAN CONTROL ROOM & LABORATORY - -

DRAWING LIST
DRAWING LIST MECHANICAL (MEC) PT. SASA INTI MINSEL
NO.SHEET CODE DESCRIPTION APPROVAL NOTED

43 GBI.14-SASA-WWTP.MEC.001 LAYOUT EQUALIZATION/PRECOND TANK - -

44 GBI.14-SASA-WWTP.MEC.002 LAYOUT ANAFLOAT BIO TANK -

45 GBI.14-SASA-WWTP.MEC.003 LAYOUT ANAFLOAT HS - -

46 GBI.14-SASA-WWTP.MEC.004 LAYOUT ANAPAK FX TANK - -

47 GBI.14-SASA-WWTP.MEC.005 LAYOUT AERATION TANK - -

48 GBI.14-SASA-WWTP.MEC.006 LAYOUT CLARIFIER TANK - -

DRAWING LIST ELECTRICAL (ELC) PT. SASA INTI MINSEL PT. GRINVIRO BIOTEKNO INDONESIA

NO.SHEET CODE DESCRIPTION APPROVAL NOTED

49 GBI.14-SASA-WWTP.ELC.001 LAYOUT TITIK LAMPU APPROVE -

50 GBI.14-SASA-WWTP.ELC.002 TITIK SAKLAR & STOP KONTAK APPROVE -

51 GBI.14-SASA-WWTP.ELC.003 LAYOUT EQUIPMENT ELECTRICAL APPROVE -

52 GBI.14-SASA-WWTP.ELC.004 DETAIL LAMPU SOROT-1 APPROVE -

53 GBI.14-SASA-WWTP.ELC.005 DETAIL LAMPU SOROT-2 APPROVE -

54 GBI.14-SASA-WWTP.ELC.006 DETAIL GROUND PANEL APPROVE -

55 GBI.14-SASA-WWTP.ELC.007 GROUND LIGHTING ANAPAK FX TANK APPROVE -

DRAWING LIST PLUMBING (PLB) PT. SASA INTI MINSEL


NO.SHEET CODE DESCRIPTION APPROVAL NOTED DRAWING LIST

56 GBI.14-SASA-WWTP.PLB.001 LAYOUT PIPE RACK APPROVE -

57 GBI.14-SASA-WWTP.PLB.002 LAYOUT PIPE LINE APPROVE -


U
PT. GRINVIRO BIOTEKNO INDONESIA

140

28

160
12
U
PT. GRINVIRO BIOTEKNO INDONESIA

TOP VIEW
R. KOMPRESSOR
P6 +0.100 +0.100 TP6 +0.100 TP5 +0.100 TP4 +0.100

PT. GRINVIRO BIOTEKNO INDONESIA

140

160
28

12
P3 +0.100 P4 +0.100
SEE DETAIL INTERMEDIATE TANK

LABORATORY R. KOMPRESSOR CONTROL ROOM


+0.200 +0.200
P6 +0.100 +0.100 TP6 +0.100 TP5 +0.100 TP4 +0.100

PT. GRINVIRO BIOTEKNO INDONESIA

U
140

160
28
12

3000
A11
+0.300

VIEW SECTION X & Y


LAYOUT
U
PT. GRINVIRO BIOTEKNO INDONESIA

140

160
28

12

DRAINAGE LAYOUT
U
PT. GRINVIRO BIOTEKNO INDONESIA

140

160
28

12

JALUR AIR BERSIH &


KOTOR
KETERANGAN :
: KERAN AIR
: SALURAN AIR BERSIH (PIPE 1/2 INCH)
: SALURAN AIR KOTOR (PIPE 1 INCH)

: METERAN AIR
U
PT. GRINVIRO BIOTEKNO INDONESIA

140

28

160
12

GBI.14-SASA-WWTP-CIV.001
TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

700

700
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -

SENGKANG Ø10 - 100 Ø10 - 100 - -

TUL. BAWAH 2 D19 2 D19 - -


PT. GRINVIRO BIOTEKNO INDONESIA
SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 1 KAIT - 2

1022 465

79
PENAMPANG 2

400

150
920

TULANGAN D19 - 150 - D19 - 150 -

TUL. TORSI - - - -
EQUALIZING/PRECON
JARAK - - - - TANK (A1) PEMBESIAN
TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


5020050

50 200 50

300
300

300

40xD
7D13
PT. GRINVIRO BIOTEKNO INDONESIA
D19-150 (2 LAYER) SPIRAL Ø10-150
+0.500 150150

40

500
650
GL
± 0.000

40

50
100
- 0.150

LEAN CONCRETE
PASIR URUG

8000
D19-150 (2 LAYER)

-8.000 (DARI BOTTOM CAP)


BORE PILE Ø300 mm

EQUALIZING/PRECON (A1)
TANK PILING PLAN
- 8.000

300 300
50 300 50

50 300 50
400
400

400

40 x D
10D13
SPIRAL Ø10-150
D19-150 (2 LAYER)
+0.500 150150
PT. GRINVIRO BIOTEKNO INDONESIA

40

800
950
GL
± 0.000

40

50
100
- 0.150

8000
LEAN CONCRETE
D19-150 (2 LAYER) PASIR URUG

-8.000 (DARI BOTTOM CAP)


BORE PILE Ø400 mm

ANAFLOAT BIO-01 TANK


PILING PLAN

- 8.000
400
400
TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

700

700
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -

SENGKANG Ø10 - 100 Ø10 - 100 - - PT. GRINVIRO BIOTEKNO INDONESIA


TUL. BAWAH 2 D19 2 D19 - -

SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 1 KAIT - 2

1022 465

79
PENAMPANG 2

400

150
920

TULANGAN D19 - 150 - D19 - 150 - ANAFLOAT BIO-01 TANK


TUL. TORSI - - - -
PEMBESIAN

JARAK - - - -

TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


5020050

50 200 50

300
300

300

40xD
7D13
SPIRAL Ø10-150
PT. GRINVIRO BIOTEKNO INDONESIA
150 150 D19-150 (2 LAYER)
+0.450

40

450
GL

600
± 0.000

40

50
- 0.150

100
PIPE DRAIN DN 100 LEAN CONCRETE
PASIR URUG

8000
D19-150 (2 LAYER)

-8000 (DARI BOTTOM CAP)


BORE PILE Ø300 mm

ANAFLOAT HS-01/DGF
TANK (A3) PILING PLAN
- 8.000

300 300
TABLE PENULANGAN BALOK

KODE B2 (BEAM) B3 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

650

650
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -


PT. GRINVIRO BIOTEKNO INDONESIA
SENGKANG Ø10 - 100 Ø10 - 100 - -

TUL. BAWAH 2 D19 2 D19 - -

SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 3 KAIT - 4

1022 485

72
PENAMPANG 5

350

150
895

ANAFLOAT HS-01/DGF
TULANGAN D19 - 150 - D19 - 150 - TANK (A3) PEMBESIAN
TUL. TORSI - - - -

JARAK - - - -

TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


50 300 50

50 300 50
400
400

400

40 x D
10D13
D19-150 (2 LAYER)
SPIRAL Ø10-150 PT. GRINVIRO BIOTEKNO INDONESIA
+0.500 150150

40

800
950
GL
± 0.000

40

50
100
- 0.150

LEAN CONCRETE
D19-150 (2 LAYER) PASIR URUG

8000
-8.000 (DARI BOTTOM CAP)
BORE PILE Ø400 mm

ANAPAK-FX 01
PILING PLAN

- 8.000

400
400
TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

700

700
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -

SENGKANG Ø10 - 100 Ø10 - 100 - -

TUL. BAWAH 2 D19 2 D19 - -


PT. GRINVIRO BIOTEKNO INDONESIA
SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 3 KAIT - 4

1022 465

79
PENAMPANG 2

400

150
920

TULANGAN D19 - 150 - D19 - 150 -


ANAPAK-FX 01
TUL. TORSI - - - - PEMBESIAN
JARAK - - - -

TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


50 300 50

50 300 50
400
400

400

40 x D
10D13
SPIRAL Ø10-150

PT. GRINVIRO BIOTEKNO INDONESIA


D19-150 (2 LAYER)
+0.500 150150

40

600
750
GL
± 0.000

40

50
100
- 0.150

LEAN CONCRETE
PASIR URUG

8000
D19-150 (2 LAYER)

-8.000 (DARI BOTTOM CAP)


BORE PILE Ø400 mm

AERATION TANK
PILING PLAN

- 8.000

400 400
TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

700

700
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -

SENGKANG Ø10 - 100 Ø10 - 100 - -


PT. GRINVIRO BIOTEKNO INDONESIA
TUL. BAWAH 2 D19 2 D19 - -

SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 3 KAIT - 4

1022 465

79
PENAMPANG 2

400

150
920

TULANGAN D19 - 150 - D19 - 150 -


AERATION TANK
TUL. TORSI - - - - PEMBESIAN

JARAK - - - -

TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


5020050

50 200 50

300
300

300

40xD
7D13
SPIRAL Ø10-150 PT. GRINVIRO BIOTEKNO INDONESIA
D19-150 (2 LAYER)
+0.500
150150
SLOPE 4%

VAR

500
650
GL
± 0.000

50
100

150
- 0.150

LEAN CONCRETE

8000
D19-150 (2 LAYER) PASIR URUG

-8.000 (DARI BOTTOM CAP)


BORE PILE Ø300 mm

SECONDARY CLARIFIER
- 8.000 PILING PLAN

300 300
TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

250 250

PENAMPANG

700

700
TUL. ATAS 2 D19 2 D19 - -

TUL. TORSI 2 D19 2 D19 - -

SENGKANG Ø10 - 100 Ø10 - 100 - -

TUL. BAWAH 2 D19 2 D19 - -


PT. GRINVIRO BIOTEKNO INDONESIA
SELIMUT BETON 40 mm 40 mm - -

SELIMUT BETON BAWAH 40 mm 40 mm - -

TABLE PENULANGAN KAIT

KODE KAIT - 5

1260

PENAMPANG

320
TULANGAN D19 - 150 - - -
SECONDARY CLARIFIER
TUL. TORSI - - - -
PENULANGAN
JARAK - - - -

TUL. BAWAH - - - -

SELIMUT BETON - - - -

SELIMUT BETON BAWAH - - - -


40 220 40
700 700

40 220 40

300
300

K1
300

700
1400

K1 K1 7 - D16

SK Ø10-100

700
A-A A-A
PT. GRINVIRO BIOTEKNO INDONESIA
K1

1400

TABLE PENULANGAN KOLOM

KODE K1 (COLUMN) -

40 220 40
40 220 40

300

PENAMPANG

300 SECONDARY CLARIFIER


DENAH KOLOM DAN DETAIL

285
414
TUL. UTAMA 7 D16 - -

TUL. TORSI - - - 40 x D
SENGKANG Ø10 - 100 (CIRCLE) - -
410
TUL. BAWAH - - -

SELIMUT BETON 40 mm - -

SELIMUT BETON BAWAH 40 mm - -


40 x D
150 700 700 150

150
D10-100

700
D10-100
1700

D10-100

+5.600
D10-100

PT. GRINVIRO BIOTEKNO INDONESIA

700
150
1700

1700

20 20
150

110
20 1660 20

SECONDARY CLARIFIER
10 1640 10 DENAH PELAT LANTAI ATAS

10 10
110

90
1660
TABLE PENULANGAN BALOK
A B KODE T1 (T BEAM) B1 ( BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

PENAMPANG

2
TUL. ATAS 4 D13 3 D13 3 D13 2 D13

TUL. TORSI 2 D10 2 D10 2 D10 2 D10

SENGKANG Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100

TUL. BAWAH 3 D13 4 D13 2 D13 3 D13


SELIMUT
BETON 30mm 30mm 30mm 30mm
SELIMUT
BETON BAWAH 30mm 30mm 750mm 750mm

TABLE PENULANGAN KOLOM


KODE K1 (KOLOM)

POSISI TUMPUAN & LAPANGAN

PT. GRINVIRO BIOTEKNO INDONESIA


PENAMPANG

TUL. UTAMA 6 D10

SENGKANG Ø10 - 100

1 SELIMUT
BETON 40mm

A B

DETAIL CONTROL BASIN


(A7)
A B C TABLE PENULANGAN BALOK
KODE B3 (BEAM) T2 (T BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

2
K3 K3 K3
PENAMPANG

A10 A9
-1.000 -1.000 TUL. ATAS 4 D13 3 D13 4 D19 3 D19

TUL. TORSI 2 D10 2 D10 2 D10 2 D10

SENGKANG Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100

TUL. BAWAH 3 D13 4 D13 3 D19 4 D19


F2 F2 F2 F2 SELIMUT
BETON 30mm 30mm 30mm 30mm
SELIMUT
BETON BAWAH 30mm 30mm 750mm 750mm

TABLE PENULANGAN KOLOM PT. GRINVIRO BIOTEKNO INDONESIA


A KODE K3 (KOLOM)

POSISI TUMPUAN & LAPANGAN

1 PENAMPANG
K3 K3 K3

TUL. UTAMA 6 D13

SENGKANG Ø10 - 100


SELIMUT
A B C BETON 40mm

±0.000 D13-150
-0.200
B3 B3 B3

-0.900
PAS. BATA PAS. BATA

-1.300
DETAIL SLUDGE (A9)&
T2 T2 T2
FILTRATE TANK(A10)

BORE PILE
T2
F2-Ø300

-8.000
A B TABLE PENULANGAN BALOK
KODE B3 (BEAM) T2 (T BEAM)
425 5250 425
POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN
2625 2625

250300
425

2
K3 F2 K3 PENAMPANG

1525
TUL. ATAS 4 D13 3 D13 4 D19 3 D19

2800
3050

TUL. TORSI 2 D10 2 D10 2 D10 2 D10


A F2
SENGKANG Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100

TUL. BAWAH 3 D13 4 D13 3 D19 4 D19


SELIMUT
BETON 30mm 30mm 30mm 30mm
SELIMUT
K3 F2 K3 BETON BAWAH 30mm 30mm 750mm 750mm

300250
1
PT. GRINVIRO BIOTEKNO INDONESIA
425

TABLE PENULANGAN KOLOM


300250 5000 250300 KODE K3 (KOLOM)

POSISI TUMPUAN & LAPANGAN

A B
PENAMPANG

+3.400 5250

400
+3.000 B3 B3
TUL. UTAMA 6 D13

SENGKANG Ø10 - 100


SELIMUT
BETON 40mm

200
2600
3400

200
+0.550
+0.400 200
200

DETAIL
400

±0.000 T2 T2
INTERMEDIATE TANK
(A11)

T2
-8.000

300250 2500 2500 250300


A B C RABAT BETON 300
+0.350 T: 100 mm 150 150

8000

100
5000 3000
+0.150

100
1

500

150
±0.000
P1 P1

SLOOF 150 x 250

1050
PONDASI BATU

KAIT BESI

700
Ø8 - 1000
4000

3150
P1 P2 P2 P1

AANSTAMPING
-0.700

-0.800

100
100 500
600 PT. GRINVIRO BIOTEKNO INDONESIA
P1 P1
DETAIL PONDASI (P1) 1

500
Skala 1 : 15 CV
2
500 4225 700 2225 500 300 RABAT BETON
+0.350 75 150 75 T: 100 mm
DENAH PONDASI 1
Skala 1 : 45 CV

100
+0.150

100
A B C

150
±0.000

8000
5000 3000 SLOOF 150 x 250
PONDASI BATU

150

1050
1
KAIT BESI
SF-1 SF-1
Ø8 - 1000

700
-0.700

DIMENSION JUMLAH -0.800

100
TYPE
4000

3850
P1 PONDASI BATU PECAH 24 m'
SF-1 SF-1 SF-1 SF-1 50 700 50
DENAH DAN DETAIL PONDASI
P2 PONDASI BATU PECAH 4 m' 800
BATU PECAH
SF-1 SLOOF 150 x 250 28 m'
DETAIL PONDASI (P2) 1 (BLOWER ROOM)
Skala 1 : 15 CV
(CHEMICAL STORAGE)
(A8)
150 150 150
TUMPUAN TUMPUAN TUMPUAN 30 90 30
2D10 2D10 2D10 8 74 8

30

8
250
190

190
174
250

250

250
SF-1 SF-1
2D10 2D10 2D10
150

8
30
90
150 4850 150 2850 150 SK Ø8-150 SK Ø8-150 SK Ø8-150 150

DETAIL SLOOF (SF1) 1 DETAIL SELIMUT BETON & SENGKANG 1


DENAH SLOOF 1
Skala 1 : 15 CV Skala 1 : 15 CV
Skala 1 : 45 CV
TYPE DIMENSION JUMLAH
A B C
K1 KOLOM 200 x 200 mm 6 Ttk

KP KOLOM 150 x 150 mm 3 Ttk


8000
RB SLOOF 150 x 300 mm 40 m'
5000 3000

200
1
K1 KP K1 K1 TABLE PENULANGAN KOLOM

KODE K1 (KOLOM) KP (KOLOM)

200 150

200
PENAMPANG
4000

3800
TUL. UTAMA 8 D10 4 Ø10

TUL. TORSI - -

SENGKANG Ø8 - 150 Ø8 - 150

TUL. BAWAH - - PT. GRINVIRO BIOTEKNO INDONESIA


1725 1550 1725
K1 KP KP K1 K1 SELIMUT BETON 40 mm 40 mm

200
2
SELIMUT BETON BAWAH 40 mm 40 mm
200 4800 200 2800 200

DENAH KOLOM LT.1 1


Skala 1 : 45 CV

TABLE PENULANGAN BALOK

A B C
KODE RB (BEAM) B2 (BEAM)

8000 POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN


5000 3000

200
1 200 200

RB RB

300

300
PENAMPANG

TUL. ATAS 3 D10 2 D10 - -

TUL. TORSI - 2 D10 - -

SENGKANG Ø8 - 150 Ø8 - 200 - -


4000

3800
RB RB RB RB
TUL. BAWAH 3 D10 3 D10 - -
DENAH KOLOM &
DENAH RING BALOK
SELIMUT BETON 30 mm 30 mm - - (BLOWER ROOM)
(CHEMICAL STORAGE)
SELIMUT BETON BAWAH 30 mm 30 mm - -
(A8)

RB RB
200

2
200 4800 200 2800 200

DENAH RING BALOK 1


Skala 1 : 45 CV
A RENG BAJA RINGAN B C
KUDA-KUDA
BAJA RINGAN C75
500 8000 500
5000 3000

500 200
500
1

600
600
600
PR-1

PR-1

PR-1

PR-1

PR-1

PR-1

PR-1

PR-1

PR-1
4000

PT. GRINVIRO BIOTEKNO INDONESIA

600
600
600
200 500
2
500

596 905 1000 1000 1000 1000 1000 1000 905 596

DENAH STRUKTUR ATAP 1


Skala 1 : 40 CV

5000
500 4000 500

RENG BAJA RINGAN (TYPE B)


RANGKA BAJA RINGAN C75
87
28 DENAH STRUKTUR ATAP
(BLOWER ROOM)
(CHEMICAL STORAGE)
(A8)
30°

30°

500 500 1000 1000 1000 500 500

DETAIL KUDA-KUDA (PR-1) 1


Skala 1 : 30 CV
2 1 2 1

500 2000 2000 500 +5.291 500 2000 2000 500


+5.291

RENG BAJA RINGAN (TYPE B) RENG BAJA RINGAN (TYPE B)

RANGKA BAJA RINGAN C75 RANGKA BAJA RINGAN C75

1441
1441
+3.850 +3.850

PR-1 PR-1
RB RB RB RB

4941
4941
PT. GRINVIRO BIOTEKNO INDONESIA

3500
3500
K1 K1 K1 K1

CHEMICAL STORAGE BLOWER ROOM


+0.350 +0.350 +0.350
+0.350

250100
250100
±0.000 ±0.000

700
700

P1 P1 P1 P1

-0.700 -0.700

100
100

500 3150 500 500 3150 500


4150 4150

POTONGAN - A 1 POTONGAN - B 1
Skala 1 : 40 CV Skala 1 : 40 CV

A-A B-B

C-C (POTONGAN A-A & B-B)


TYPE DIMENSION JUMLAH (BLOWER ROOM)
PR-1 RANGKA BAJA RINGAN C75 (CHEMICAL STORAGE)
RB RING BALOK 200 x 300 (A8)
CHEMICAL STORAGE BLOWER ROOM K1 KOLOM 200 x 200
+0.350 +0.350 P1 PONDASI BATU

KEYPLAN
A B C

500 5000 3000 500


+5.291

1441
PR-1 PR-1 PR-1 PR-1 PR-1 PR-1 PR-1 PR-1 PR-1

+3.850

RB RB

4941
PT. GRINVIRO BIOTEKNO INDONESIA

3500
K1 K1 K1

CHEMICAL STORAGE BLOWER ROOM


+0.350 +0.350 +0.350

250100
±0.000

700
P1 P1 P1
-0.700

100
500 4225 700 2225 500
8150

POTONGAN - C 1
Skala 1 : 40 CV

A-A B-B

C-C (POTONGAN C-C)


TYPE DIMENSION JUMLAH (BLOWER ROOM)
PR-1 RANGKA BAJA RINGAN C75 (CHEMICAL STORAGE)
RB RING BALOK 200 x 300 (A8)
CHEMICAL STORAGE BLOWER ROOM K1 KOLOM 200 x 200
+0.350 +0.350 P1 PONDASI BATU

KEYPLAN
RABAT BETON 300
+0.200 T: 100 mm 150 150
A B C

100
LANTAI SHELTER
7600 ±0.000

100
3000 4600

150
-0.150
1
500

SLOOF 150 x 250

1050
P1 P1
PONDASI BATU

KAIT BESI

700
Ø8 - 1000

AANSTAMPING

4000
3150

P1 P1 P1 P1 -0.850

-0.950

100
100 500
600
PT. GRINVIRO BIOTEKNO INDONESIA
P1 P1 DETAIL PONDASI (P1) 1
Skala 1 : 15 CV
500

300 RABAT BETON


2 +0.200 75 150 75 T: 100 mm
500 2225 700 3825 500

100
LANTAI SHELTER
DENAH PONDASI 1 ±0.000

100
Skala 1 : 45 CV

150
-0.150
A B C

SLOOF 150 x 250


7600 PONDASI BATU

1050
3000 4600
KAIT BESI
150

1 Ø8 - 1000
SF-1 SF-1

700
-0.850

-0.950

100
DIMENSION JUMLAH 50 700 50
TYPE
800 DENAH DAN DETAIL PONDASI
4000
3850

SF-1 SF-1 SF-1 P1 PONDASI BATU PECAH 24 m' SF-1


PONDASI BATU PECAH 4 m' DETAIL PONDASI (P2) 1 BATU PECAH
P2
Skala 1 : 15 CV
SF-1 SLOOF 150 x 250 28 m' (CONTROL ROOM)
(LABORATORY)
150 150 150 (A12 & A13)
TUMPUAN TUMPUAN TUMPUAN 30 90 30
2D10 2D10 2D10 8 74 8

30

8
250
190

190
250

250

250

174
2D10 2D10 2D10

8
30
SF-1 SF-1 90
SK Ø8-150 SK Ø8-150 SK Ø8-150 150
150

2
DETAIL SLOOF (SF1) 1 DETAIL SELIMUT BETON & SENGKANG 1
150 2850 150 4450 150
Skala 1 : 15 CV Skala 1 : 15 CV

DENAH SLOOF 1
Skala 1 : 45 CV
A B C

7600 TABLE PENULANGAN KOLOM


3000 3100 1500
KODE K1 (KOLOM)
200

K1 K1 K1 K1
200

200
PENAMPANG

TUL. UTAMA 8 D10

4000
3800

TUL. TORSI -

SENGKANG Ø8 - 150

TUL. BAWAH -

SELIMUT BETON 40 mm

SELIMUT BETON BAWAH 40 mm


PT. GRINVIRO BIOTEKNO INDONESIA

K1 K1 K1 K1
200

2
200 2800 200 2900 200 1300 200

DENAH KOLOM LT.1 1


Skala 1 : 45 CV

A B C TABLE PENULANGAN BALOK

KODE B1 (BEAM) B2 (BEAM)


7600
3000 3100 1500 POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

200 200
200 200
200

1
B1 B1 B1

400

400

300

300
PENAMPANG

B2 B2 B2
TUL. ATAS 3 D10 2 D10 3 D10 2 D10

TUL. TORSI 2 D10 2 D10 - -

SENGKANG Ø8 - 150 Ø8 - 200 Ø8 - 150 Ø8 - 200


4000
3800

B1 B1 B1 B1 DENAH KOLOM &


TUL. BAWAH 3 D10 3 D10 3 D10 3 D10 DENAH RING BALOK
(CONTROL ROOM)
SELIMUT BETON 30 mm 30 mm 30 mm 30 mm
B2 B2 B2 (LABORATORY)
SELIMUT BETON BAWAH
(A12 & A13)
30 mm 30 mm 30 mm 30 mm

TYPE DIMENSION JUMLAH

B1 B1 B1 K1 KOLOM 200 x 200 8 Ttk


200

2 B1 BALOK 200 x 400 40 m'


200 2800 200 2900 200 1300 200 B2 BALOK 200 x 300 8 m'

DENAH BALOK EL + 3.500 1


Skala 1 : 45 CV
A B C

300 7600 300


3000 3100 1500

300
1

FL + 3.500
S1

Ø8 - 100
PT. GRINVIRO BIOTEKNO INDONESIA
4600

4000
Ø8 - 100
Ø8 - 100
Ø8 - 100

300
8200

DENAH PELAT LANTAI 1


Skala 1 : 40 CV

100 100 BESI Ø8 - 100


TYPE DIMENSION JUMLAH

25 50 25
100

PELAT BETON T: 120 mm


S1 38 m2
BESI Ø8 - 100 DENAH DAN DETAIL
DAK ATAP
DETAIL PELAT (S1) 1
Skala 1 : 10 CV (CONTROL ROOM)
(LABORATORY)
(A12 & A13)
2 1
2 1

4600
4600
300 4000 300
300 4000 300
DAK ATAP
+3.850 DAK ATAP
+3.850 +3.850
+3.850

RB RB
RB RB

PT. GRINVIRO BIOTEKNO INDONESIA

3600

3600
K1 K1
K1 K1

4650

4650
LABORATORY
+0.200 CONTROL ROOM
+0.200 +0.200 +0.200
250100
±0.000

250100
±0.000
-0.150
-0.150
850

850
P1 P1
P1 P1
-0.850
-0.850
100

100
500 3150 500
500 3150 500
4150
4150

POTONGAN - A 1 POTONGAN - B 1
Skala 1 : 40 CV Skala 1 : 40 CV

A-A B-B
(POTONGAN A-A & B-B)
C-C
(CONTROL ROOM)
(LABORATORY)
DIMENSION JUMLAH
(A12 & A13)
TYPE
PR-1 RANGKA BAJA RINGAN C75

RB RING BALOK 200 x 300

K1 KOLOM 200 x 200

P1 PONDASI BATU

KEYPLAN
A B C

8200
300 3000 4600 300
+3.850 DAK ATAP DAK ATAP
+3.850 +3.850

RB RB

3600
PT. GRINVIRO BIOTEKNO INDONESIA
K1 K1 K1

4750
LABORATORY CONTROL ROOM
+0.200 +0.200 +0.200
±0.000

150200
-0.150

700
P1 P1 P1
-0.700

100
500 2225 700 3825 500
7750

POTONGAN - C 1
Skala 1 : 40 CV

A-A B-B
(POTONGAN C-C)
C-C
(CONTROL ROOM)
(LABORATORY)
TYPE DIMENSION JUMLAH (A12 & A13)
PR-1 RANGKA BAJA RINGAN C75

RB RING BALOK 200 x 300

K1 KOLOM 200 x 200

P1 PONDASI BATU

KEYPLAN
A B A B

10125 10125

P1 400 2000 2000 2000 1000 400 2000 2000 2000 1001

850

850
850

850
PC-1
P1 PC-1

140

1503 140
140

1503 140
4 4

TP2 TP2

1860
1860
TP4 TP3 +0.100 TP4 TP3 +0.100
+0.100 +0.100 630 +0.100 +0.100 630
400

4800

4800
4800

4800

2000
2000

TP5 TP5
+0.100 LABORATORY +0.100 LABORATORY
+0.200 +0.200

P1 P1 PC-1 PC-1

2066
2066

TP6 TP6
+0.100 3 +0.100 3

PT. GRINVIRO BIOTEKNO INDONESIA

R. COMPRESOR R. COMPRESOR
+0.100 150 CONTROL ROOM +0.100 150 CONTROL ROOM
650 +0.200 650 +0.200

17300

15600
17300

15600

6000

6000
6000

6000
450

2850
2850

3275 1875 575 3275 1875 575

P1 A11 P1 PC-1 A11 PC-1


+0.300 +0.300
2 2

2650
2650

A9 A10 A9 A10

4800

4800
4800

4800

-1.000 -1.000 -1.000 -1.000

1850
1850

TP7 TP7
P1 +0.100 P1 PC-1 +0.100 PC-1

150
150

1 1
850

850
850

850

400 2000 400 2000


DENAH TITIK STRAUSS
850 10125 850 850 10125 850
PILE DAN PILECAP (AREA
11825 11825
SHELTER)
DENAH STRAUSS PILE 1 DENAH PILECAP 1
Skala 1 : 100 CV Skala 1 : 100 CV

TYPE DIMENSION JUMLAH


P1 STRAUS PILE Ø30 cm 8 Ttk
PC-1 800 x 800 x 400 8 Ttk
50 200 50
TYPE PC-1

50
200
300
800
250 300 250

50
250
300

D16-120

D16-120

400
800
D16-120 300

40
800
300
DENAH

40 x D
D16-120

285
400

400
250

150

75
400 400
40 720 40

150
KETEBALAN SELIMUT BETON (PC-1) 1
Skala 1 : 15 CV

CL
300
7-D13
25 250 25 16 688 16
SPIRAL Ø8 - 150
PT. GRINVIRO BIOTEKNO INDONESIA

16
285

253
ANGKUR M16 - L: 300 WF 250.125.6.9

16
MODUL 3x3 BASE PLAT 16mm
720
+0.500
DETAIL PENULANGAN (PC1) 1
50

GROUTING Skala 1 : 15 CV
500

12-D13 RABAT BETON


SK Ø8 - 100 T: 100mm
±0.000

3000
100

POTONGAN
400

-0.500
1050

120 120 120 96


96 120
400

LC
PASIR URUG
-0.900
10050

-1.000

DETAIL STRAUSS PILE


-3.000 (DARI BOTTOM PILECAP)

DAN PILE CAP


(AREA SHELTER)

STRAUSS PILE
Ø300 mm

-5.100 TYPE DIMENSION JUMLAH


300 P1 STRAUS PILE Ø30 cm 8 Ttk
250 300 250
DETAIL STRAUSS PILE 1 PC-1 800 x 800 x 400 8 Ttk
800 Skala 1 : 15 CV
A B A B

10125 10125

2000 1000 400 2000 2000 2000 1000

850

850
400 2000 2000
850

850
PD-1 PD-1 K-1 K-1

1503 140
140
140

1503 140
4 4

TP2 TP2

1860
1860
TP4 TP3 +0.100 TP4 TP3 +0.100
+0.100 +0.100 630 +0.100 +0.100 630

4800

4800
4800

4800

2000
TP5
2000

TP5
+0.100 LABORATORY +0.100 LABORATORY
+0.200 +0.200

PD-1 PD-1 K-1 K-1

2066
TP6
2066

TP6 3
+0.100 3 +0.100

PT. GRINVIRO BIOTEKNO INDONESIA


R. COMPRESOR R. COMPRESOR
150 CONTROL ROOM +0.100 150 CONTROL ROOM
+0.100
+0.200 650 +0.200

17300

15600
650

6000

6000
17300

15600
6000

6000

2850
2850

3275 1875 575 3275 1875 575

A11 A11
PD-1 +0.300 PD-1 K-1 +0.300 K-1
2 2

2650
2650

A9 A10 A9 A10

4800

4800
4800

4800

-1.000 -1.000 -1.000 -1.000

1850
1850

TP7 TP7
+0.100 +0.100
PD-1 PD-1 K-1 K-1

150
1
150

1
850

850
850

850

400 2000 400 2000

850 10125 850 850 10125 850


11825 11825
DENAH PEDESTAL DAN
DENAH PEDESTAL 1 DENAH KOLOM LT.1 1
KOLOM BAJA
Skala 1 : 100 CV Skala 1 : 100 CV
(AREA SHELTER)

300 BASE PLATE 16 mm


8 204 8 300 25 250 25 6 - ANGKUR M16 L:500 mm
40
6x
D

88

90
8

12 - D13
300

300
220

220
204

120
125

Ø8 - 100
90
88
8

40

300 220 40 220 40 80 70 70 80 TYPE DIMENSION JUMLAH


WF 250.125.6.9
PD-1 PEDESTAL 300 x 300 8 Ttk
DETAIL PEDESTAL (PD-1) 1 SELIMUT BETON & DETAIL SENGKANG (PD-1) 1 DETAIL KOLOM (K1) 1
Skala 1 : 15 CV Skala 1 : 15 CV Skala 1 : 15 CV K-1 WF 250.125.6.9 8 Ttk
A B

A B
880 10125 880
1200 1200 1200 1200 1200 1200 1200 1200
10125

880

880
4 4
R1 R2

4800

4800
4800

4800
B1 B1

R1 R2
3 3

OVERSTEK WF 150.75.5.7
PT. GRINVIRO BIOTEKNO INDONESIA

17360

15600
15600

6000

6000
6000

6000
B1 B1

LINTEL BEAM WF 150.75.5.7

PURLIN CNP 125.50.20.2,3


JARAK PER 1.2m

RAFTER WF 200.100.5,5.8
R1 R2
2 2

BRACING BESI D16


TREKSTANG BESI Ø12

4800

4800
4800

4800

B1 B1

R1 R2
1 1
880

880
10125

880 10125 880


DENAH RAFTER DAN BEAM 1
11885 DENAH STRUKTUR ATAP
Skala 1 : 100 CV
DENAH RAFTER & BEAM
DENAH STRUKTUR ATAP 1
(AREA SHELTER)
Skala 1 : 100 CV

TYPE DIMENSION JUMLAH


R1 WF 200.100.5,5.8 4 Pcs
R2 WF 200.100.5,5.8 4 Pcs
B1 WF 150.75.5.7 6 Pcs
PLAT STIFNER 8mm BAUT M16 x 2.5" PLAT JOINT 12mm
TREKSTANG BESI Ø12mm WF 250.125.6.9 CNP 125.50.20.2,3

125

125
CNP 125.50.20.2,3
CNP 125.50.20.2,3 PLAT STIFNER 8mm

200

200
PLAT STIFNER 8mm C TREKSTANG BESI D12 LISTPLANK 50.50.4
LISTPLANK 50.50.4 TREKSTANG BESI D12 VOUTE WF 200.100.5,5.8
TINGGI RANGKA: 700mm

125
TINGGI RANGKA: 700mm 600 600 BAUT M16 x 2.5"

125
BAUT M16 x 2.5" TINGGI FINISH: 800mm
TINGGI FINISH: 800mm

200
A

200
A LINTEL BEAM
LINTEL BEAM
WF 150.75.5.7
WF 150.75.5.7 JOINT RAFTER TO RAFTER 1 200 50
200

15°
15°
Skala 1 : 30 CV

200
150
200
150

VOUTE WF 200.100.5,5.8

600
VOUTE WF 200.100.5,5.8
600

140 B
B
600
600 20 100 20 300
300
PLAT 12mm

20
PLAT 12mm
PT. GRINVIRO BIOTEKNO INDONESIA

80
PLAT STIFNER 8mm
PLAT STIFNER 8mm
BAUT M16 x 2.5"

200
880

80
880 WF 200.100.5,5.8
ENDPLATE 12mm

430

390
120
PIPA PVC 4" PIPA PVC 4"

VOUTE WF 200.100.5,5.8

190
80
250 250

70

20
40 60 40
JOINT RAFTER TO COLUMN 1
140 JOINT RAFTER TO COLUMN 1
Skala 1 : 30 CV Skala 1 : 30 CV
POTONGAN - C 1
Skala 1 : 10 CV

125 125
13 100 13 13 100 13
20

20
80

80
BAUT M16 x 2.5" 115 115 BAUT M16 x 2.5"
200

200
80

80
WF 200.100.5,5.8 20 75 20 20 75 20 WF 200.100.5,5.8
20

20
65

65
ENDPLATE 12mm ENDPLATE 12mm
430

430
390

390
120

120
BAUT M16mm x 2,5" BAUT M16mm x 2,5"
150

150
80 65

80 65
WF 150.75.5.7 WF 150.75.5.7
290

250

290

250
VOUTE WF 200.100.5,5.8 VOUTE WF 200.100.5,5.8
190

190
80

80
ENDPLATE 12mm ENDPLATE 12mm
100

100
VOUTE WF 150.75.5.7 VOUTE WF 150.75.5.7
70

80

80

70
20

20
20

20
33 60 33 28 60 28 28 60 28 33 60 33 DETAIL JOINT RAFTER DAN
125 115 115 125 OVERSTEK
POTONGAN - A 1 POTONGAN - B 1 POTONGAN - B 1 POTONGAN - A 1 (AREA SHELTER)
Skala 1 : 10 CV Skala 1 : 10 CV Skala 1 : 10 CV Skala 1 : 10 CV
A B A B

11885 11885
880 10125 880 880 10125 880
+6.266 +6.266

1266

1266
+5.000 +5.000

575 3050

6266

6266
4500

4500
SEE DETAIL INTERMEDIATE TANK

3000
+0.500 400 2000 2000 2725 2000 1000 475 3150 1750
+0.500 A11
+0.300

500
±0.000

500
P1 +0.100 P2 +0.100 P3 +0.100 ±0.000
SEE DRAWING DETAIL SLUDGE SEE DRAWING DETAIL SLUDGE

PT. GRINVIRO BIOTEKNO INDONESIA

400 500

400 500
MANHOLE MANHOLE

1000
-0.900 -0.900 A9 A10
-1.000 -1.000

-5.100 -5.100

550 800 9325 800 550 550 800 9325 800 550
12025 12025

POTONGAN - A 1 POTONGAN - B 1
Skala 1 : 80 CV Skala 1 : 80 CV

1 2 3 4

17360
880 4800 6000 4800 880 C-C
+6.266
A-A

TP2
TP4 TP3 +0.100

1266
+0.100 +0.100

TP5
+5.000 +0.100 LABORATORY
+0.200

TP6
+0.100

R. COMPRESOR
+0.100 CONTROL ROOM
+0.200

2275 B-B
PC-1 A11 PC-1

6266
+0.300

4500
A9 A10
SEE DETAIL INTERMEDIATE TANK -1.000 -1.000

TP7
PC-1 +0.100 PC-1

POTONGAN
(AREA SHELTER)
KEYPLAN 1
Skala NTS CV

+0.500 A11 A11


+0.300 +0.300 R. KOMPRESSOR

500
±0.000 P6 +0.100 +0.100 TP6 +0.100 TP5 +0.100 TP4 +0.100

400 500
-0.900

-5.100

550 800 4000 800 5200 800 4000 800 550


POTONGAN - C 1
17500
Skala 1 : 80 CV
A B C

300 7600 300


±0.000 4600 3000

500
±0.000

PL-1 PL-1
+3.000 +3.000

CONTROL ROOM LABORATORY


+0.200 +0.200

3500
3000
A A A A A A A A

KEYPLAN 1

+0.200 Skala NTS ST-01.01

PT. GRINVIRO BIOTEKNO INDONESIA

250 100
-0.150

700
-0.850
-0.950

100
500 3850 700 2250 500 POTONGAN - A 1
Skala 1 : 45 ST-01.01

C B A

300 7600 300


3000 4600
+3.500

500
+3.000

PL-1 PL-1
+3.000 +3.000

A A

3500
3000
A A A A A

+0.200
250 100

-0.150

TYPE KETERANGAN
700

-0.850 PL1 PLAFOND GYPSUM BOARD 9mm


-0.950
A CAT INTERIOR EX. DULUX
100

600 2150 700 3750 600 POTONGAN - B 1


Skala 1 : 45 ST-01.01
A B C 1 2

300 7600 300 300 4000 300


+3.500
+3.500 4600 3000

A A

2600

3500
A

3500
+0.900

PT. GRINVIRO BIOTEKNO INDONESIA

900
±0.000
±0.000
4000
4600 3000

TAMPAK DEPAN 1 TAMPAK KIRI 1


Skala 1 : 45 ST-01.01 Skala 1 : 40 ST-01.01

C B A
2 1

300 7600 300


300 4000 300
3000 4600 +3.500
+3.500

A A

3500
3500 A

±0.000
±0.000

3000 4600 4000

TAMPAK BELAKANG 1 TAMPAK KANAN 1


Skala 1 : 40 ST-01.01 Skala 1 : 40 ST-01.01
PT. GRINVIRO BIOTEKNO INDONESIA

LAYOUT
EQUALIZATION/PRECOND
TANK

VIEW A TANK EQ/PRECOND SECTION B TANK EQ/PRECOND


SCALE : 100 SCALE : 100
A Y A Y
B X B X
C W C W

D V D V

E U E U

F T F T

G S G S

H R H R

I Q I Q
PT. GRINVIRO BIOTEKNO INDONESIA
J P J P

K O K O
L M N L M N

TOP VIEW TANK ANAFLOAT BIO ELEVATION +15.010 VIEW TANK ANAFLOAT BIO
SCALE : 170 SCALE : 170

LAYOUT
ANAFLOAT BIO TANK

VIEW A TANK ANAFLOAT BIO VIEW A TANK ANAFLOAT BIO


SCALE : 170 SCALE : 170
DRAIN
DN80 G
NS.TUBING-1
OUT SLUDGE-1 DN-25
INLET PVC DN80
PVC DN150 NS.TUBING-2
MANHOLE BOTTOM DN-25
DN700 NS-5
DN-25
NS-4
DN-25
MANHOLE TOP NS-3
DN300 DN-25
GAS FLARE NS-2
PVC DN100 DN-25

NS-1
DN-25

TO REFLUX PUMP
PVC DN80

EFFLUENT
PVC DN150

IN SLUDGE-1
PVC DN80

SLUDGE - 2
PVC DN150

PT. GRINVIRO BIOTEKNO INDONESIA

TOP VIEW TANK ANAFLOAT HS VIEW ELEVATION ELV. +7.712mm ATAP TANK
SCALE : 100
SCALE : 100

PORT IN SLUDGE-1 PORT IN SLUDGE-1


SS304 DN80 SS304 DN80

PORT SLUDGE - 2
SS304 DN150
PORT REFLUX PUMP NS.TUBING-2 PORT REFLUX PUMP
DN-25
SS304 DN80 SS304 DN80

PORT EFFLUENT PORT EFFLUENT


SS304 DN200 SS304 DN200

NS.TUBING-1
DN-25

PORT INLET
SS304 DN150

PVC DN100

LAYOUT
ANAFLOAT HS TANK
PORT OUT SLUDGE-1 PORT OUT SLUDGE-1
SS304 DN80 SS304 DN80

VIEW A TANK ANAFLOAT HS SECTION B TANK ANAFLOAT HS


SCALE : 80 SCALE : 80
TOP VIEW ANAPAK FX TANK
PT. GRINVIRO BIOTEKNO INDONESIA
TOP VIEW ANAPAK FX TANK
SCALE : 120 SCALE : 120

LAYOUT
ANAPAK FX TANK

VIEW ANAPAK FX TANK VIEW ANAPAK FX TANK


SCALE : 120 SCALE : 120
PT. GRINVIRO BIOTEKNO INDONESIA

LAYOUT
VIEW A TANK AERASI VIEW A TANK AERASI AERATION TANK
SCALE : 150 SCALE : 150
PT. GRINVIRO BIOTEKNO INDONESIA

LAYOUT CLARIFIER TANK


SCALE : 80

OUT-P1
DN-125

RAS-P1
DN-150

BOTTOM MANHOLE
DN 700 LAYOUT
CLARIFIER TANK

SECTION VIEW CLARIFIER TANK


SCALE : 80
U
PT. GRINVIRO BIOTEKNO INDONESIA
E5

E4

E3

E2

W1 E1 W2 W3 E1 E2 E3 E4

SUPPORT TRAY SIKU 40

SUPPORT TRAY SIKU 40

140

160
28

12

LAYOUT PIPE RACK


U
PT. GRINVIRO BIOTEKNO INDONESIA
P5

P4

P3

P2

W1 P1 W2 W3 E1 E2 E3 E4

SUPPORT TRAY SIKU 40

SUPPORT TRAY SIKU 40

140

28

160
12

LAYOUT PIPE LINE


U
PT. GRINVIRO BIOTEKNO INDONESIA

140

160
28

12

LAYOUT TITIK
LAMPU
140

160
28

12
PT. GRINVIRO BIOTEKNO INDONESIA

TITIK SAKLAR & STOP


KONTAK
140

160
28

12
PT. GRINVIRO BIOTEKNO INDONESIA

LAYOUT EQUIPMENT
ELECTRICAL
PT. GRINVIRO BIOTEKNO INDONESIA

DETAIL LAMPU
SOROT-1
PT. GRINVIRO BIOTEKNO INDONESIA

DETAIL LAMPU
SOROT-2
TABLE PENULANGAN BALOK
KODE B1 (BEAM) T1 (T BEAM)

POSISI TUMPUAN LAPANGAN TUMPUAN LAPANGAN

PENAMPANG

TUL. ATAS 2 D10 2 D10 2 D10 2 D10

TUL. TORSI 2 D10 2 D10 2 D10 2 D10

SENGKANG Ø10 - 100 Ø10 - 100 Ø10 - 100 Ø10 - 100

TUL. BAWAH 2 D10 2 D10 2 D10 2 D10


SELIMUT
BETON 30mm 30mm 30mm 30mm
SELIMUT
BETON BAWAH 30mm 30mm 750mm 750mm PT. GRINVIRO BIOTEKNO INDONESIA

TABLE PENULANGAN KOLOM


KODE K1 (KOLOM)

POSISI TUMPUAN & LAPANGAN

PENAMPANG

TUL. UTAMA 6 D10

SENGKANG Ø10 - 100


SELIMUT
BETON 30mm

DETAIL
GROUND PANEL
PT. GRINVIRO BIOTEKNO INDONESIA

TOP VIEW GROUND MANHOLE TOP VIEW MANHOLE


SCALE : 2 SCALE : 2

GROUND LIGHTING
ANAPAK FX TANK

SECTION VIEW GROUND MANHOLE


SCALE : 2

You might also like