Professional Documents
Culture Documents
Vacuum Level Adjusting - Rev1.1 29 Mar 2016
Vacuum Level Adjusting - Rev1.1 29 Mar 2016
Revision History
Revision No. Date Description Modified By
1.1 29-Mar-2016 Original Document revised Ryuji Mizuno
1. Purpose
This Technical Note describes the procedure of adjusting the Vacuum levels properly.
NOTE: Before begin this activity it is very important to make sure that all inks were shaken at
least 15 minutes before being placed inside the bottle and that the stirrer systems are working
properly.
The procedure is intended for qualified Dip-Tech technicians and operators.
This procedure comprises the following steps:
Adjusting the Vacuum levels, as described on page 2
The following tools and supplies are required for this procedure.
PN Description Quantity
1
Adjusting the Vacuum levels
1. Adjust vacuum gages to the "Work Around" level according the following list:
2. Go to "Configuration Editor" window, under “INK” tab; unmark the option "Purge at
the start of print", click "OK" and exit this window.
2
Adjusting the Vacuum levels
4. Choose any color and Start lowering manually the vacuum value gradually until you
see that the Print Heads starts to leak.
5. Take the vacuum level back up a little bit, till it seems that the leaking has stopped.
(Only by feeling, ignore the value at the digital Gauge display).