1 PURPOSED
This Work Instruction will be as the guideline for Maintenance personnel to perform
Limestone Slurry Pump Disassembly and Inspection.
2 SCOPE
This Work Instruction will be applied for Limestone Slurry Pump Disassembly and
Inspection at Tanjung Jati B Power Plant. The works not mentioned in this instruction
will be performed in accordance with drawings and appropriate specifications then will be
considered to be added in this Work Instrcution later. This Work Instruction is refer to
O&M manual from OEM.
3 RESPONSIBILITY
The Maintenance Manager has responsibility for updating this instruction.
The Maintenance Engineer has responsibility to control maintenance works made
according to the instruction and co-ordinate with other teams during planning and
report activities to the Maintenance Manager.
The Maintenance Engineer and Supervisor have responsibility to plan, supervise and
report of maintenance works which are undertaken in accordance with this procedure.
The Maintenance Technician has responsibility to implement the Works Instruction in
Work Instruction 2 (14)
Petunjuk Kerja
safe manner.
4 DETAIL OF WORKS
4.1 Preparation
1. Work should be carried out by three people.
2. Prepare all necessary drawings (part details drawing number D701471-15 R2, bearing
assembly drawing number MK03506 and inspection report form (replacement parts
record and vibration data record) prior to start of work.
3. Prepare the necessary parts, tools and equipment before commencing actual work.
4. Co-ordinate with Civil Section to provide access and lifting
5. Confirm that the equipment is isolated and a permit to work is available before
commencing work.
6. Prepare a suitable lay-down area.
7. Remove the auxiliary piping, piping supports and all instruments that may interfere
with the disassemble/reassemble procedures
7. Abrasives Paper
8. Plastic Blanket
9. Brush
10. LPS G-49 degreaser
11. Oil and Grease
12. Wearing Compound
belt drive cover clamp bolt belt drive cover support bolt belt drive adjuster bolt
4.10 Reassembly
1. Tie the bearing chamber by webbing sling length 4 meter end loop capacity 2 Ton, lift
up and Install, setting and lock the bearing chamber in certain current position by
combination spanner 24 mm.
2. Install mechanical seal static part before inserting bearing chamber (including shaft)
in to impeller housing then lock combination spanner 14 mm.
3. Insert Mechanical Seal Rotating Part assembly from impeller side.
4. Install and lock the impeller on shaft by pipe and rotate the shaft (as pump rotation) in
the sheave position by chain wrench.
Work Instruction 7 (14)
Petunjuk Kerja
5 REFERENCE
1. Part details drawing number D701471-15 R2.
2. Bearing assembly drawing number MK03506.
6 ATTACHEMENT
1 List of spare parts use for Limestone Slurry Pump.
2 Part details drawing number D701471-15 R2.
3 Bearing assembly drawing number MK03506.
4 Inspection report form.
Work Instruction 10 (14)