You are on page 1of 1

LEVEL 3 – FMP - Production Schedule/Plan

Write down a ‘shopping list’ of tasks, jobs, things to do, with a start date and a completion date:

Student Name: Reece Cooper Sheet

Production Title: Solo awakening 0 of 0

TO BE COMPLETED BY?
DATE / LESSON: PRE / PROD / POST TASK (Highlight in GREEN when TO BE RESCHDULED?
completed

13/3/24 PRE Drawing sketch for page 1 13/3/24

15/3/24 PRE Draw all sketch pages from page 2 to 10 15/4/24

18/3/24 PROD Drawing the coloured detailed version of page 1 20/3/24

22/3/24 PROD Drawing the coloured detailed version of page 2 28/3/24

25/3/24 PRE Compete risk assessment 25/3/24

27/3/24 PROD Complete page 3 1/4/24

3/4/24 PROD Complete page 4 to 5 9/4/24

12/4/24 PROD Complete page 6 14/4/24

24/4/24 PROD Complete page 7 26/4/24