MFDMIA2
TEST I
TIME - 2hrs 26/03/2021
QUESTION 1
(6)
(6)
1.3 Highlight the key design elements of the work part transportation subsystem
in manufacturing operations. (3)
QUESTION 2
2.1 A total of 10 000 forgings are required in five (5) days. Manually operated
forge hammers are used to do the job. The cycle time is 50 secs. Set up time
for each machine is 2.0hr. Determine the total number of forge hammers to
satisfy demand? Assume a single 8 hours shift per day?
(4)
(10)
QUESTION 3
3.1
a) Cycle time, Tc
(3)
b) Theoretical minimum number of workers on the line
(3)
3.2