Form BTP - 1: Site Organization

The Bidder shall provide with the Bid a complete Schedule and Organization chart required.

1) The name, background and professional experience of each key staff member to be
assigned to this project, with particular reference to his experience of a nature similar to
that of the proposed assignment.
2) An organization chart for the DB and DLP period with assignment of each key staff member
(identified by name), duration & timing together with clear description of the responsibilities
of each key staff member within the overall work programme to comply with the
Employer’s Requirements.
3) The Bidder must demonstrate that it has the personnel for the key positions that meet the
requirements as per in Section 6A and Section 6B2 as per Part-II, Employer’s
Requirements.
4) The Bidder shall provide details of the proposed personnel and their experience records
using Forms PER-1 and PER-2 as below in this Section 4B, Bidding Forms for all Key
Positions of Section 6A and Section 6B2.

We hereby confirm that this is minimum project and maintenance specific mobilization and
these will be suitably augmented, as required for achieving the tender requirements and key
dates.

SIGNATURE OF AUTHORIZED SIGNATORY ON BEHALF OF BIDDER

Date

Seal:
Bidding Document for CA-244 Design Build Single-Stage: Two-Envelope