You are on page 1of 19

TOWER

BERSAMA
GROUP

AS PLANNED DRAWING
PROJECT NEW SITE PT.INDOSAT OOREDOO HUTCHISON
REGION EAST JAVA
SITE ID / SITE ID OPR : 1611651004 / 16SBY0661

SITE NAME : ROMOKALISARI_BENOWO

TOWER HEIGHT : MP 30 M – TAPPERED PIPE

SHELTER TYPE : BTS OUTDOOR

ADDRESS : PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO
KOTA SURABAYA PROV. JAWA TIMUR

COORDINATE : S: 7.201010° / 7°12'03.6"


E: 112.637840° / 112°38'16.2"
ACKNOWLEDGE BY

N PT. INDOSAT OOREDOO HUTCHISON

E
W
S
TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

MP 30 M REMARK
TAPPERED PIPE

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

SITE MAP LOCATION

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

01 13
ACKNOWLEDGE BY

N PT. INDOSAT OOREDOO HUTCHISON

E
W
S
TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

MP 30 M
TAPPERED PIPE
ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

SITE LAYOUT

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

02 13
ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
MP 30 M
TAPPERED PIPE
MP 30 M
TAPPERED PIPE
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY


X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X X X X X X X
X
X
X
X X X

PT. CAKRAWALA REKAYASA


X X
X
X
X
X
X X X
X X X X X
X
X
X
X X X X X X
X X X X
X
X X
X X X X X
X X X X X X
X
X X X X
X X X X XX X X
X
X X XX
XX X XX X
X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X
X
X X
X X X X X X
X
X
X
X X X X X
X
X
X
X X
X X
X X X X X
X
X
X
X
X
X X X X
X
X
X
X
X X
X X X X X X
X
X X X X X X
X X X X X
X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X
X X X
X
X
X
X
X
X
X
X X X
X
X
X
X
X
X
X
X X X
X
X
X X X
X X X X X
X X
X X X X X X
X
X
X
X X X X X X
X
X
X
X X
X X X X
X
X
X
X
X XX
X X X X X X X X X X X X X
X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X XX X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

VIEW A & VIEW B

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

03 13
ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

MP 30 M MP 30 M
TAPPERED PIPE TAPPERED PIPE TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

SECTION 1-1 & SECTION 2-2

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP

NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

04 13
ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


NOTE : SITE NAME ROMOKALISARI_BENOWO

Reinforcement shall use : SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
Deformed bar : Fy = 390 MPa SURABAYA PROVINSI JAWA TIMUR
Fu = 560 MPa AS PLAN DRAWING NAME
Plain bar : Fy = 235 MPa
Fu = 380 MPa
Concrete shall use : SLAB REINFORCEMENT
K-253 (Characteristic Compressive Strength = 253 kg/cm²)
f'c = 21 MPa REVISE

Concrete cover shall use 75mm for all components NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation


Due to the MAT elv -1.2 m, please include a dewatering process
during the excavation process

We recommend to use tremie pouring during concrete to prevent


segregation THIS DRAWING IS FULLY PROPERTIES OF
TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
We recommend to do PDA (Pile Driving Analyzer) and PIT (Pile WITHOUT PERMISSION BY TOWER BERSAMA GROUP
Integrity Test) on all well pile
NAME DATE SIGNED

We recommend to use earth retaining system (buis beton with DRAWN Satria P Kusuma 20 - 11 - 2023

suitable diameter) during foundation construction CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023


Please use the proper method during construction according to
Correct Standard SHEET NO. TOTAL SHEET

All dimension are in mm. Unless stated otherwise 05A 13


ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


NOTE : SITE NAME ROMOKALISARI_BENOWO

Reinforcement shall use : SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
Deformed bar : Fy = 390 MPa SURABAYA PROVINSI JAWA TIMUR
Fu = 560 MPa AS PLAN DRAWING NAME
Plain bar : Fy = 235 MPa
Fu = 380 MPa
Concrete shall use : TOWER FOUNDATION DETAIL
K-253 (Characteristic Compressive Strength = 253 kg/cm²)
f'c = 21 MPa REVISE

Concrete cover shall use 75mm for all components NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation


Due to the MAT elv -1.2 m, please include a dewatering process
during the excavation process

We recommend to use tremie pouring during concrete to prevent


segregation THIS DRAWING IS FULLY PROPERTIES OF
TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
We recommend to do PDA (Pile Driving Analyzer) and PIT (Pile WITHOUT PERMISSION BY TOWER BERSAMA GROUP
Integrity Test) on all well pile
NAME DATE SIGNED

We recommend to use earth retaining system (buis beton with DRAWN Satria P Kusuma 20 - 11 - 2023

suitable diameter) during foundation construction CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023


Please use the proper method during construction according to
Correct Standard SHEET NO. TOTAL SHEET

All dimension are in mm. Unless stated otherwise 05B 13


ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


NOTE : SITE NAME ROMOKALISARI_BENOWO

Reinforcement shall use : SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
Deformed bar : Fy = 390 MPa SURABAYA PROVINSI JAWA TIMUR
Fu = 560 MPa AS PLAN DRAWING NAME
Plain bar : Fy = 235 MPa
Fu = 380 MPa
Concrete shall use : TOWER FOUNDATION DETAIL
K-253 (Characteristic Compressive Strength = 253 kg/cm²)
f'c = 21 MPa REVISE

Concrete cover shall use 75mm for all components NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation


Due to the MAT elv -1.2 m, please include a dewatering process
during the excavation process

We recommend to use tremie pouring during concrete to prevent


segregation THIS DRAWING IS FULLY PROPERTIES OF
TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
We recommend to do PDA (Pile Driving Analyzer) and PIT (Pile WITHOUT PERMISSION BY TOWER BERSAMA GROUP
Integrity Test) on all well pile
NAME DATE SIGNED

We recommend to use earth retaining system (buis beton with DRAWN Satria P Kusuma 20 - 11 - 2023

suitable diameter) during foundation construction CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023


Please use the proper method during construction according to
Correct Standard SHEET NO. TOTAL SHEET

All dimension are in mm. Unless stated otherwise 05C 13


ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

BAR BENDING SCHEDULE

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

05D 13
ACKNOWLEDGE BY

PT. INDOSAT OOREDOO HUTCHISON

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

TOWER BERSAMA GROUP

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PT. CAKRAWALA REKAYASA

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID & SITE ID OPR 1611651004 / 16SBY0661


SITE NAME ROMOKALISARI_BENOWO

SITE ADDRESS PERGUDANGAN MASPION BLOK D NO 9


KEL. ROMOKALISARI KEC. BENOWO KOTA
SURABAYA PROVINSI JAWA TIMUR

AS PLAN DRAWING NAME

BASEPLATE DETAIL

REVISE

NO DATE ITEM SIGNED

01 28 - 12 - 2023 Resoil, Resurvey & Reanalysis - Site Relocation

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN Satria P Kusuma 20 - 11 - 2023

CHECKED Rani Suryani 20 - 11 - 2023

APPROVED Anshar Maysra 20 - 11 - 2023

SHEET NO. TOTAL SHEET

06 13
ACKNOWLEDGE BY

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID
SITE NAME
SITE ADDRESS

AS PLAN DRAWING NAME

STANDARD CIVIL - B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

07A 13
ACKNOWLEDGE BY

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

ANALYSIS & DESIGN GUARANTEED BY

PAGAR TYPE 2B PINTU PAGAR (TAMPAK DALAM SITE)


Muhammad Agus Primatama, S.T., M.T.
DIRECTOR

PROJECT NAME

SITE ID
SITE NAME
SITE ADDRESS

AS PLAN DRAWING NAME

STANDARD CIVIL - B2S

REVISE

NO DATE ITEM SIGNED

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

07B 13
ACKNOWLEDGE BY

TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

MOUNTING ANTENNA

ANALYSIS & DESIGN GUARANTEED BY

SCALE = 1 : 5 - A4
Muhammad Agus Primatama, S.T., M.T.
DIRECTOR

PROJECT NAME

SITE ID
SITE NAME
SITE ADDRESS
SCALE = 1 : 5 - A4
AS PLAN DRAWING NAME

SCALE = 1 : 8 - A4

STANDARD MECHANICAL - B2S

REVISE

NO DATE ITEM SIGNED

SCALE = 1 : 5 - A4

SCALE = 1 : 8 - A4

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SCALE = 1 : 8 - A4
SHEET NO. TOTAL SHEET

ADDITIONAL SUPPORT DETAIL POLE KWH METER 08 13


ACKNOWLEDGE BY

KWH PANEL

ENGSEL DALAM (BESI)

ENGSEL DALAM (BESI)


di perkuat dengan las

di perkuat dengan las


WIRE DUCT
32x45
Outgoing BOX OKA
TOWER
Triangel Keylock Main Input 32A 3P Outgoing 6x32A 1P 2x6A 1P
for KWH Meter PLN

Stoper

Stoper

Stoper
Schneider Schneider Schneider Schneider Schneider
C 16A C 16A C 16A C 10A C 10A

OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF OFF
TRALIS KWH METER BERSAMA
ACRYLIC FOR KWH METER di las full
tiap sisi tralis WIRE DUCT
32x45
GROUP
ACKNOWLEDGE BY
120

WIRE DUCT
Stoper
ENGSEL DALAM (BESI)

ENGSEL DALAM (BESI)


COVER PADLOCK

45x45
di perkuat dengan las

di perkuat dengan las


25.0050

40 40
40

610
TRALIS 40 40
KWH
150

150
Arrester Combine / Type 1+Type 2 Minimun 50 KA
METER
WIRE DUCT
32x45
H
I C.O.S 63A 4 POLE STOP KONTAK
G

Stoper

Stoper

Stoper
H OFF
HASPRIYALDI
VOLTAGE PROJECT TECHNICAL SUPPORT DEPT HEAD
ON ON

80 IMPLEMENTATION BY

ENGSEL DALAM (BESI)


ENGSEL DALAM (BESI)
WIRE DUCT

di perkuat dengan las


di perkuat dengan las
32x45

RSTN RSTN

Stoper

Stoper

Stoper
Triangel Keylock
Bus Bar Netral
TERMINAL BLOCK TO TERMINAL BLOCK TO
RECTIFIER SPARE RECTIFIER
Bus Bar Grounding

450
REMARK
PG 16 PG 16
GROUNDING KONSEP PINTU GROUNDING KONSEP PINTU
PG 36 PG 36 PG 36 PG 36
Receptacle RATA BODY BOX Receptacle RATA BODY BOX
OUTPUT
RECTIFIER (32A,3P+N+PE)
INPUT PLN OUTPUT
RECTIFIER (32A,3P+N+PE)
INPUT PLN PHOTO CELL

SIDE VIEW
FRONT VIEW INSIDE VIEW ANALYSIS & DESIGN GUARANTEED BY

OPEN DOOR 90°


Muhammad Agus Primatama, S.T., M.T.
DIRECTOR

PROJECT NAME

SITE ID
SITE NAME
SITE ADDRESS
ENGSEL DALAM (BESI)

ENGSEL DALAM (BESI)


TRALIS PENGAMAN BAGIAN DALAM DENGAN
di perkuat dengan las

di perkuat dengan las


PENAMBAHAN BESI BULAT Ø8mm PADA POSISI VERTIKAL AS PLAN DRAWING NAME

LAYOUT PANEL KWH-ACPDB


3 PHASE OUTDOOR
39.9023

Receptacle KONSEP PINTU Receptacle KONSEP PINTU REVISE


PG 36 (32A,3P+N+PE) PG 36 RATA BODY BOX PG 36 (32A,3P+N+PE) PG 36 RATA BODY BOX
OUTPUT INPUT OUTPUT INPUT NO DATE ITEM SIGNED
RECTIFIER PLN RECTIFIER PLN

PG 16
PG 16
GROUNDING
GROUNDING

PG 36 PG 36 THIS DRAWING IS FULLY PROPERTIES OF


SPARE SPARE
RECTIFIER RECTIFIER
TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

BOTTOM VIEW BOTTOM VIEW APPROVED

SHEET NO. TOTAL SHEET

09 13
ACKNOWLEDGE BY

R R
TOWER

METER PLN
220/380V

S S BERSAMA
50Hz

KWH
PLN

T T GROUP
ACKNOWLEDGE BY

N N Change Over Switch


( COS ) 63A 4Pole PL R1 R2 R3 PFR

1 HASPRIYALDI
FUSE
PROJECT TECHNICAL SUPPORT DEPT HEAD

0o R IMPLEMENTATION BY

2 MCB MAIN Terminal Block


1 32A 3P Output Rectifier
0o S 32A 1P R
2 32A 1P S
1 32A 1P T
REMARK
0o T N
2
1
0o N
MCB 6A 1P ANALYSIS & DESIGN GUARANTEED BY
2

RSTRST
Muhammad Agus Primatama, S.T., M.T.
32A 1P R
DIRECTOR

PROJECT NAME
32A 1P S
N 32A 1P T
Arrester N SITE ID
Combine Type.1+Type.2 MCB SITE NAME
N N SITE ADDRESS
6A 1P Stop Kontak
PE
GENSET

T T
FOR GENSET
RECEPTACLE

AS PLAN DRAWING NAME

S S WIRING DIAGRAM KWH-ACPDB


3 PHASE OUTDOOR
R R N REVISE

NO DATE ITEM SIGNED

PE

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

10 13
SPESIFIKASI PANEL KWH+ACPDB 10.6kVA 3 PHASE OUTDOOR ACKNOWLEDGE BY

NO DESCRIPTION TYPE BRAND QTY UNIT REMARK


Plat Tichness 2mm IP65 Powder
1 BOX W500xH700xD300+Canopy Panel Maker TBG 1 Unit Full Safety
Coating
Labeling:KWH+ACPDB PANEL(Tengah),XL(Kanan Atas),Panel
2 Maker(Kanan Bawah) Stainless Steel Local 3 Pcs

3 Channel Support + Clamp Omega Galvanise Local 2 Set TOWER


BERSAMA
4 Main Input MCB 32A 32A, 3P, 10kA Schneider, Hager, ABB 1 Pcs
GROUP
ACKNOWLEDGE BY
5 Output MCB 6A 6A, 1P, 4.5kA Schneider, Hager, ABB 2 Pcs

6 Output MCB 32A for Rectifier & Spare Rectifier 32A, 3P, 4.5kA Schneider, Hager, ABB 2 Pcs

7 Stop Kontak 16A, 1P+PE+N Schneider, Hager, ABB 1 Pcs


HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD
8 Fuse for Indicator Lamp FS101 Fort 3 Pcs IMPLEMENTATION BY

9 Indicator Lamp R, S, T LED 220VAC Fort, Schneider 3 Pcs

10 Relay 220VAC+Socket MY2 220VAC Omron, Schneider 3 Pcs

11 Surge Protection Device Combine Type.1+Type.2 OBO, Mersen, Phonex 1 Set


REMARK
12 Change Over Swicth ( C.O.S ) 63A 4 Pole Socomec, ABB, K&N 1 Pcs

13 Terminal Block for Phase Failure Relay 2.5mm Fort, Kasuga 4 Pcs

14 Terminal Block for Output to Rectifier TR60 Kasuga 8 Pcs


ANALYSIS & DESIGN GUARANTEED BY

15 Penahan Material / Stopper Din Rail Local 10 Pcs

16 Bus Bar Grounding 20x3mm Import 1 Set

Import Muhammad Agus Primatama, S.T., M.T.


17 Bus Bar Neutral 20x3mm 1 Set DIRECTOR

PROJECT NAME

18 Terminal Keramik Isolator Bar 30x40 Fort 2 Pcs

19 Wire Duct 32x45mm Fort 1 Lot


SITE ID
Wiring Cable Supreme, KabelMetal, Jenbo,
20 NYAF, 4 Besar, 16mm Lot SITE NAME
R(merah),S(kuning),T(hitam),N(biru),PE(hijau-kuning) 1
atau Tranka, Kabelindo SITE ADDRESS

21 Acrylic + Handle Clear AN 1 Lot AS PLAN DRAWING NAME

22 Bolt & Nut Stainless Steel Local 1 Lot SPESIFIKASI KWH-ACPDB


3 PHASE OUTDOOR
23 Cable Gland for Input PLN & Output Rectifier PG 36 Fort 32 Pcs REVISE

NO DATE ITEM SIGNED

24 Cable Gland for Grounding PG 16 Fort 1 Pcs

25 Acessoriss Local Local 1 Lot


THIS DRAWING IS FULLY PROPERTIES OF
TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
26 Box OKA 3 Phase + kermanik connection Local Local 1 Unit WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

27 Receptacle Genset Female 32A 3P+N+PE ( 5 PIN ) Menekes, Legrand, Schneider 1 Set DRAWN

CHECKED

28 Photo Cell - Schneider 1 Set APPROVED

SHEET NO. TOTAL SHEET

12 13
ACKNOWLEDGE BY

A
TOWER
BERSAMA
GROUP
ACKNOWLEDGE BY

HASPRIYALDI
PROJECT TECHNICAL SUPPORT DEPT HEAD

IMPLEMENTATION BY

REMARK

GROUNDING LAYOUT

ANALYSIS & DESIGN GUARANTEED BY

DETAIL BOLT ( BAUT ) ON EGB Muhammad Agus Primatama, S.T., M.T.


DIRECTOR

PROJECT NAME

SITE ID
SITE NAME
SITE ADDRESS
DETAIL MGB INSIDE GROUNDING PIT
AS PLAN DRAWING NAME

STANDARD GROUNDING - B2S

REVISE

NO DATE ITEM SIGNED

DETAIL UPPER AND LOWER BAR

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

POTONGAN - A CHECKED

APPROVED

SHEET NO. TOTAL SHEET

BOX CONTROL DETAIL & GROUNDING ON FENCE 13 13


ACKNOWLEDGE BY

OPERATOR - 1 OPERATOR IOH


TOWER
UPPER Busbar UPPER Busbar
BERSAMA
SPITZEN ø20MM
DIINTEGRASI LANGSUNG
DENGAN ISOLATOR
GROUP
ACKNOWLEDGE BY
MIDDLE Busbar MIDDLE Busbar
STEEL PIPE Ø2"-2000 L

DIINTEGRASI LANGSUNG KE TOWER


DENGAN ISOLATOR

LOWER Busbar LOWER Busbar

EGB EGB CLAMP TO LEG HASPRIYALDI


TOWER PER 1 METRE PROJECT TECHNICAL SUPPORT DEPT HEAD

200
IMPLEMENTATION BY

5.0 m
AAC 70mm
AAC 70mm2

REMARK
Connector Bimetallic

BC 50 MM2
Connector Bimetallic
Connector Bimetallic

ANALYSIS & DESIGN GUARANTEED BY

MM
CD

50
BC
KWH + ACPDB
OPERATOR - 1
KWH + ACPDB COPPER ROD 3/4" L=4M
Muhammad Agus Primatama, S.T., M.T.
RST
KWH PANEL

RST
KWH PANEL

CD DIRECTOR
Triangel Keylock Triangel Keylock

ACRYLIC FOR KWH METER ACRYLIC FOR KWH METER

H H
Cd PROJECT NAME
I I
G G
H H
VOLTAGE VOLTAGE

CD CD
Triangel Keylock Triangel Keylock

COPPER ROD 3/4" CD


L=4M
COPPER ROD 3/4"
L=4M SITE ID
KAKI TOWER
L=4M SITE NAME
CD
COPPER ROD 3/4" CD SITE ADDRESS
CD
AS PLAN DRAWING NAME

CD
ISOMETRIC GROUNDING - B2S
CD+ CD
REVISE
CD CD CD
NO DATE ITEM SIGNED

COPPER ROD 3/4" COPPER ROD 3/4"


L=4M L=4M

THIS DRAWING IS FULLY PROPERTIES OF


TOWER BERSAMA GROUP AND CAN'T USED OR PRINTED
WITHOUT PERMISSION BY TOWER BERSAMA GROUP
NAME DATE SIGNED

DRAWN

CHECKED

APPROVED

SHEET NO. TOTAL SHEET

14 13

You might also like