KONTRAK MC 0 / ESTIMASI REALISASI/ 7 MARET

A MOB DEMOB 1.00 LS 140,000,000.00 140,000,000.00 1.00 LS 140,000,000.00 1.00 140,000,000.00


B SPUN 40 TRESTLE DERMAGA DAN MESJID 73.00 TITIK 77.00 TITIK (PATAH DITABRAK TONGKANG 1 TITIK) 77.00 TITIK
HANDLING 2,760.00 M' 10,000.00 27,600,000.00 2,903.38 M' 29,033,800.00 2,903.38 M' 29,033,800.00
JOINT 146.00 JOINT 190,000.00 27,740,000.00 157.00 JOINT 29,830,000.00 157.00 JOINT 29,830,000.00
PEMANCANGAN 2,760.00 M' 260,000.00 717,600,000.00 2,903.38 M' 754,878,800.00 2,903.38 M' 754,878,800.00

C SPUN PILE 60 MESJID 119.00 TITIK 119.00 TITIK 120.00 TITIK


HANDLING 4,014.00 M' 12,000.00 48,168,000.00 5,250.00 M' 63,000,000.00 5,197.50 M' 62,370,000.00
JOINT 238.00 JOINT 240,000.00 57,120,000.00 349.00 JOINT 83,760,000.00 346.00 JOINT 83,040,000.00
PEMANCANGAN 4,014.00 M' 260,000.00 1,043,640,000.00 5,250.00 M' 1,365,000,000.00 5,197.50 M' 1,351,350,000.00
TOTAL 2,061,868,000.00 TOTAL 2,465,502,600.00 TOTAL 2,450,502,600.00

403,634,600.00
BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN: PEKERJAAN DERMAGA / TRASTLE DERMAGA PARIWISATA
Item Pembayaran : Pengadaan tiang pancang spun pile kelas A prestress dia. 40 cm K600
Pemancangan tiang pancang spun pile kelas A prestress dia. 40 cm K600
Pemotongan Tiang Pancang/ Leveling
Penyambungan Tiang Pancang

P. Total Vol. Muka Air


Data Spun Pile Vol.
Spun / Opname Pengadaan / Tertinggi Vol. Vol.
Pemancan
No Titik Handling Potongan Cut. Level Terhadap gan (M) Penyambu Pemotong Keterangan
(M) (M) (M) Cutting Pile/ ngan (Bh) an (Titik)
Bot (M) Mid 1 (M) Mid 2 (M) Mid 3 (M) HWS (M)
(c+d+e+f) (g-h) (i-j)
a b c d e f g h i j k l m n
1 E 1 13.00 13.00 13.00 39.00 0.26 38.74 0.55 38.19 2.00 1.00
2 F 1 13.00 13.00 13.00 39.00 0.62 38.38 0.55 37.83 2.00 1.00
3 E 2 13.00 13.00 13.00 39.00 0.82 38.18 0.55 37.63 2.00 1.00
4 F 2 13.00 13.00 13.00 39.00 0.68 38.32 0.55 37.77 2.00 1.00
5 D 3 13.00 13.00 13.00 39.00 0.36 38.64 1.15 37.49 2.00 1.00
6 E 3 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
7 F 3 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
8 G 3 13.00 13.00 13.00 39.00 1.01 37.99 1.15 36.84 2.00 1.00
9 E 4 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
10 F 4 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
11 D 4 13.00 13.00 13.00 39.00 0.22 38.78 1.15 37.63 2.00 1.00
12 E 4 13.00 13.00 13.00 39.00 0.37 38.63 1.15 37.48 2.00 1.00
13 F 5 13.00 13.00 13.00 39.00 0.32 38.68 1.15 37.53 2.00 1.00
14 G 5 13.00 13.00 13.00 39.00 0.74 38.26 1.15 37.11 2.00 1.00
15 E 6 13.00 13.00 13.00 39.00 0.20 38.80 1.15 37.65 2.00 1.00
16 F 6 13.00 13.00 13.00 39.00 0.56 38.44 1.15 37.29 2.00 1.00
17 E 7 13.00 13.00 13.00 39.00 1.09 37.91 1.15 36.76 2.00 1.00
18 F 7 13.00 13.00 13.00 39.00 0.48 38.52 1.15 37.37 2.00 1.00
19 E 8 13.00 13.00 13.00 39.00 0.65 38.35 1.15 37.20 2.00 1.00
20 F 8 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
21 E 9 13.00 13.00 13.00 39.00 - 39.00 1.15 37.85 2.00
22 F 9 13.00 13.00 13.00 39.00 0.37 38.63 1.15 37.48 2.00 1.00
23 E 10 13.00 13.00 13.00 39.00 0.40 38.60 1.15 37.45 2.00 1.00
24 F 10 13.00 13.00 13.00 39.00 0.40 38.60 1.15 37.45 2.00 1.00

Pengadaan,Pemancangan,Penyambungan, dan Pemotongan Spun Pile 40 Trastle Dermaaga


P. Total Vol. Muka Air
Data Spun Pile Vol.
Spun / Opname Pengadaan / Tertinggi Vol. Vol.
Pemancan
No Titik Handling Potongan Cut. Level Terhadap gan (M) Penyambu Pemotong Keterangan
(M) (M) (M) Cutting Pile/ ngan (Bh) an (Titik)
Bot (M) Mid 1 (M) Mid 2 (M) Mid 3 (M) HWS (M)
(c+d+e+f) (g-h) (i-j)
a b c d e f g h i j k l m n
25 E 11 13.00 13.00 13.00 39.00 1.35 37.65 1.15 36.50 2.00 1.00
26 F 11 13.00 13.00 13.00 39.00 1.05 37.95 1.15 36.80 2.00 1.00
27 E 12 13.00 13.00 13.00 39.00 2.95 36.05 1.15 34.90 2.00 1.00
28 F 12 13.00 13.00 13.00 39.00 3.00 36.00 1.15 34.85 2.00 1.00
29 E 13 13.00 13.00 13.00 39.00 3.15 35.85 1.15 34.70 2.00 1.00
30 F 13 13.00 13.00 13.00 39.00 3.70 35.30 1.15 34.15 2.00 1.00
31 E 14 13.00 13.00 11.00 37.00 1.30 35.70 1.15 34.55 2.00 1.00
32 F 14 13.00 13.00 10.00 36.00 0.35 35.65 1.15 34.50 2.00 1.00
33 E 15 13.00 13.00 10.00 36.00 0.30 35.70 1.15 34.55 2.00 1.00
34 F 15 13.00 13.00 10.00 36.00 0.15 35.85 1.15 34.70 2.00 1.00
35 E 16 13.00 13.00 13.00 39.00 3.40 35.60 1.15 34.45 2.00 1.00
36 F 16 13.00 13.00 13.00 39.00 3.00 36.00 1.15 34.85 2.00 1.00
37 E 17 13.00 13.00 13.00 39.00 3.05 35.95 1.15 34.80 2.00 1.00
38 F 17 13.00 13.00 13.00 39.00 3.00 36.00 1.15 34.85 2.00 1.00
39 E 18 13.00 13.00 13.00 39.00 2.80 36.20 1.15 35.05 2.00 1.00
40 F 18 13.00 13.00 13.00 39.00 2.80 36.20 1.15 35.05 2.00 1.00
41 E 19 13.00 13.00 13.00 39.00 2.90 36.10 1.15 34.95 2.00 1.00
42 F 19 13.00 13.00 13.00 39.00 2.95 36.05 1.15 34.90 2.00 1.00
43 E 20 13.00 13.00 13.00 39.00 3.55 35.45 1.15 34.30 2.00 1.00
44 F 20 13.00 13.00 13.00 39.00 3.90 35.10 1.15 33.95 2.00 1.00

TOTAL VOLUME 1,705.00 58.20 1,646.80 48.20 1,598.60 88.00 38.00

Pengadaan,Pemancangan,Penyambungan, dan Pemotongan Spun Pile 40 Trastle Dermaaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Beton Isian Spun Pile Ø 40


Vol. Beton mutu fc’ =
No Titik Keterangan
24.9 MPa
Jari-Jari Isian
Ø Isian Pancang Tinggi Isian Beton Luas Penampang
Pancang
(n) Ø r = Ø x 0.5 L A = π x (r^2) V = (A x L) n
(bh) (m) (m) (m) (m2) (m3)
1. A 1 0.50 0.25 6.00 0.20 1.18
2. A 2 0.50 0.25 6.00 0.20 1.18
3. B 1 0.50 0.25 6.00 0.20 1.18
4. B 2 0.50 0.25 6.00 0.20 1.18
- -
- -
- -
- -
- -
- -
- -
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Isian Pancang 4.71

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Beton Pile Cup


Vol. Beton mutu fc’ =
No Titik Keterangan
Panajang Lebar Tinggi Tebal Plat 24.9 MPa

(n) L b H h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m3)
1. A 1 2.00 2.00 1.00 4.000
2. B 1 2.00 2.00 1.00 4.000
-
-
-
-
-
-
-
-
-
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Pile Cup 8.00

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)
Untuk BALOK INDUK B1

Beton Balok B1 Memanjang


Vol. Beton mutu fc’ =
No Titik Keterangan
24.9 MPa
Panajang Lebar Tinggi Tebal Plat

(n) L b H h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m3)
1 GRID Delatasi - E1 1.47 0.40 0.60 0.15 0.265
2 GRID E1 - E2 2.37 0.40 0.60 0.15 0.427
3 GRID E2 - E3 4.17 0.40 0.60 0.15 0.751
4 GRID E3 - E4 3.15 0.40 0.60 0.15 0.567
5 GRID E4 - E5 3.35 0.40 0.60 0.15 0.603
6 GRID E5 - E6 3.25 0.40 0.60 0.15 0.585
7 GRID E6 - E7 3.32 0.40 0.60 0.15 0.598
8 GRID E7 - E8 3.33 0.40 0.60 0.15 0.599
9 GRID E8 - E9 3.30 0.40 0.60 0.15 0.594
10 GRID E9 - E10 3.22 0.40 0.60 0.15 0.580
11 GRID E10 - E11 3.39 0.40 0.60 0.15 0.610
12 GRID E11 - E12 3.05 0.40 0.60 0.15 0.549
13 GRID E12 - E13 3.25 0.40 0.60 0.15 0.585
14 GRID E13 - E14 3.49 0.40 0.60 0.15 0.628
15 GRID E14 - E15 3.22 0.40 0.60 0.15 0.580
16 GRID E15 - E16 3.18 0.40 0.60 0.15 0.572
17 GRID E16 - E17 3.49 0.40 0.60 0.15 0.628
18 GRID E17 - E18 3.34 0.40 0.60 0.15 0.601
19 GRID E18 - E19 3.40 0.40 0.60 0.15 0.612
20 GRID E19 - E20 3.37 0.40 0.60 0.15 0.607
21 GRID E20 - Ujung Cantilever 0.90 0.40 0.60 0.15 0.162
22 GRID D3 - D4 4.68 0.40 0.60 0.15 0.842
23 GRID Delatasi - F1 1.33 0.40 0.60 0.15 0.239
24 GRID F1 - F2 2.95 0.40 0.60 0.15 0.531
25 GRID F2 - F3 3.55 0.40 0.60 0.15 0.639
26 GRID F3 - F4 3.27 0.40 0.60 0.15 0.589
27 GRID F4 - F5 3.35 0.40 0.60 0.15 0.603
28 GRID F5 - F6 3.25 0.40 0.60 0.15 0.585
29 GRID F6 - F7 3.30 0.40 0.60 0.15 0.594
30 GRID F7 - F8 3.39 0.40 0.60 0.15 0.610
31 GRID F8 - F9 3.30 0.40 0.60 0.15 0.594
32 GRID F9 - F10 3.42 0.40 0.60 0.15 0.616
33 GRID F10 - F11 2.80 0.40 0.60 0.15 0.504

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


34 GRID F11 - F12 3.59 0.40 0.60 0.15 0.646
35 GRID F12 - F13 3.27 0.40 0.60 0.15 0.589
36 GRID F13 - F14 3.19 0.40 0.60 0.15 0.574
37 GRID F14 - F15 3.32 0.40 0.60 0.15 0.598
38 GRID F15 - F16 3.42 0.40 0.60 0.15 0.616
39 GRID F16 - F17 3.30 0.40 0.60 0.15 0.594
40 GRID F17 - F18 3.10 0.40 0.60 0.15 0.558
41 GRID F18 - F19 3.30 0.40 0.60 0.15 0.594
42 GRID F19 - F20 3.20 0.40 0.60 0.15 0.576
43 GRID F20 - Ujung Cantilever 0.90 0.40 0.60 0.15 0.162
44 Grid G3 - G4 4.63 0.40 0.60 0.15 0.833
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B1 24.99

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)
Untuk BALOK INDUK B1

Beton Balok B1 Melintang


Vol. Beton mutu
No Titik Panjang B1 Lebar PC Lebar PC Panajang Keterangan
fc’ = 24.9 MPa
Lebar Tinggi Tebal Plat
Melintang Grid E Grid F Total
(n) L1 L2 L3 L = L1-L2-L3 b H h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m) (m) (m) (m3)
1 Grid E1 - F1 6.02 0.70 0.70 4.62 0.40 0.60 0.15 0.832
2 Grid E2 - F2 6.02 0.70 0.70 4.62 0.40 0.60 0.15 0.832
3 Grid D3 - G3 10.15 1.40 1.40 7.35 0.40 0.60 0.15 1.323
4 Grid D4 - G4 10.20 1.40 1.40 7.40 0.40 0.60 0.15 1.332
5 Grid E5 - F5 6.05 0.70 0.70 4.65 0.40 0.60 0.15 0.837
6 Grid E6 - F6 6.04 0.70 0.70 4.64 0.40 0.60 0.15 0.835
7 Grid E7 - F7 6.03 0.70 0.70 4.63 0.40 0.60 0.15 0.833
8 Grid E8 - F8 6.02 0.70 0.70 4.62 0.40 0.60 0.15 0.832
9 Grid E9 - F9 6.09 0.70 0.70 4.69 0.40 0.60 0.15 0.844
10 Grid E10 - F10 6.11 0.70 0.70 4.71 0.40 0.60 0.15 0.848
11 Grid E11 - F11 5.95 0.70 0.70 4.55 0.40 0.60 0.15 0.819
12 Grid E12 - F12 5.94 0.70 0.70 4.54 0.40 0.60 0.15 0.817
13 Grid E13 - F13 5.95 0.70 0.70 4.55 0.40 0.60 0.15 0.819
14 Grid E14 - F14 5.94 0.70 0.70 4.54 0.40 0.60 0.15 0.817
15 Grid E15 - F15 6.01 0.70 0.70 4.61 0.40 0.60 0.15 0.830
16 Grid E16- F16 5.97 0.70 0.70 4.57 0.40 0.60 0.15 0.823
17 Grid E17 - F17 6.04 0.70 0.70 4.64 0.40 0.60 0.15 0.835
18 Grid E18 - F18 6.03 0.70 0.70 4.63 0.40 0.60 0.15 0.833
19 Grid E19 - F19 6.00 0.70 0.70 4.60 0.40 0.60 0.15 0.828
20 Grid E20 - F20 6.03 0.70 0.70 4.63 0.40 0.60 0.15 0.833

Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B1 17.60

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)
Untuk BALOK ANAK B2

Beton Balok B2 Memanjang Vol. Beton mutu fc’ =


No Titik Keterangan
Panajang Lebar Tinggi Tebal Plat 24.9 MPa
(n) L b H h V = L x b x (H- h)
(bh) (m) (m) (m) (m) (m3)
1 GRID Delatasi - E'1 1.72 0.30 0.40 0.15 0.129
2 GRID E'1 - E'2 2.96 0.30 0.40 0.15 0.222
3 GRID E'2 - E'3 4.16 0.30 0.40 0.15 0.312
4 GRID E'3 - E'4 3.51 0.30 0.40 0.15 0.263
5 GRID E'4 - E'5 3.65 0.30 0.40 0.15 0.274
6 GRID E'5 - E'6 3.55 0.30 0.40 0.15 0.266
7 GRID E'6 - E'7 3.61 0.30 0.40 0.15 0.271
8 GRID E'7 - E'8 3.66 0.30 0.40 0.15 0.275
9 GRID E'8 - E'9 3.60 0.30 0.40 0.15 0.270
10 GRID E'9 - E'10 3.62 0.30 0.40 0.15 0.271
11 GRID E'10 - E'11 3.40 0.30 0.40 0.15 0.255
12 GRID E'11 - E'12 3.62 0.30 0.40 0.15 0.271
13 GRID E'12 - E'13 3.56 0.30 0.40 0.15 0.267
14 GRID E'13 - E'14 3.64 0.30 0.40 0.15 0.273
15 GRID E'14 - E'15 3.57 0.30 0.40 0.15 0.268
16 GRID E'15 - E'16 3.60 0.30 0.40 0.15 0.270
17 GRID E'16 - E'17 3.70 0.30 0.40 0.15 0.277
18 GRID E'17 - E'18 3.52 0.30 0.40 0.15 0.264
19 GRID E'18 - E'19 3.65 0.30 0.40 0.15 0.274
20 GRID E'19 - E'20 3.59 0.30 0.40 0.15 0.269
21 GRID E'20 - Ujung Cantilever 0.85 0.30 0.40 0.15 0.064
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B2 5.30

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)
Untuk BALOK INDUK B2

Beton Balok B2 Melintang


Vol. Beton mutu
No Titik Keterangan
Panjang B2 Lebar B1 Lebar B2 Panajang fc’ = 24.9 MPa
Lebar Tinggi Tebal Plat
Melintang Memanjang Memanjang Total
(n) L1 L2 L3 L = L1-(2xL2)-(L3) b H h V = L x b x (H- h)
(bh) (m) (m) (m) (m) (m) (m) (m) (m3)
1 Grid E1' - F1' 6.02 0.40 0.30 4.92 0.30 0.40 0.15 0.369
2 Grid E2' - F2' 6.02 0.40 0.30 4.92 0.30 0.40 0.15 0.369
3 Grid D3' - G3' 10.15 0.40 0.30 8.25 0.30 0.40 0.15 0.619
4 Grid E4' - F4' 6.05 0.40 0.30 4.95 0.30 0.40 0.15 0.371
5 Grid E5' - F5' 6.04 0.40 0.30 4.94 0.30 0.40 0.15 0.371
6 Grid E6' - F6' 6.03 0.40 0.30 4.93 0.30 0.40 0.15 0.370
7 Grid E7' - F7' 6.02 0.40 0.30 4.92 0.30 0.40 0.15 0.369
8 Grid E8' - F8' 6.02 0.40 0.30 4.92 0.30 0.40 0.15 0.369
9 Grid E9' - F9' 6.09 0.40 0.30 4.99 0.30 0.40 0.15 0.374
10 Grid E10' - F10' 6.11 0.40 0.30 5.01 0.30 0.40 0.15 0.376
11 Grid E11' - F11' 5.95 0.40 0.30 4.85 0.30 0.40 0.15 0.364
12 Grid E12' - F12' 5.94 0.40 0.30 4.84 0.30 0.40 0.15 0.363
13 Grid E13' - F13' 5.95 0.40 0.30 4.85 0.30 0.40 0.15 0.364
14 Grid E14' - F14' 5.94 0.40 0.30 4.84 0.30 0.40 0.15 0.363
15 Grid E15' - F15' 6.01 0.40 0.30 4.91 0.30 0.40 0.15 0.368
16 Grid E16' - F16' 5.97 0.40 0.30 4.87 0.30 0.40 0.15 0.365
17 Grid E17' - F17' 6.04 0.40 0.30 4.94 0.30 0.40 0.15 0.371
18 Grid E18' - F18' 6.03 0.40 0.30 4.93 0.30 0.40 0.15 0.370
19 Grid E19' - F19' 6.00 0.40 0.30 4.90 0.30 0.40 0.15 0.368
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B2 7.25

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)
Untuk PLAT

Beton Pile Cup


Vol. Beton mutu fc’ =
No Titik Keterangan
24.9 MPa
Panajang Lebar Tebal Plat

(n) L b h V=Lxbxh n
(bh) (m) (m) (m) (m3)
1 DELATASI - UJUNG 77.93 6.00 0.20 93.52
2 SAYAP KIRI 6.00 2.00 0.20 2.40
3 SAYAP KANAN 6.00 2.00 0.20 2.40

Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Plat 98.32

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


REKAPITULASI BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA PARIWISATA
Item Pembayaran : Beton mutu sedang dengan fc’= 24.9 MPa (K-300)

Vol. Beton mutu fc’


No URAIAN PEKERJAAN Keterangan
= 24.9 MPa

1 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Isian Pancang 4.71
2 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Pile Cup 8.00
3 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B1 MEMANJANG 24.99
4 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B1 MELINTANG 17.60
5 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B2 MEMANJANG 5.30
6 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Balok B2 MELINTANG 7.25
7 Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Plat 98.32
Total Vol. Beton mutu fc’ = 24.9 MPa 166.17

Beton mutu fc’ = 24.9 MPa Trastle Dermaga Pariwisata


REKAPITULASI BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA PARIWISATA
Item Pembayaran : Baja Tulangan Polos Isian Tiang Pancang
Baja Tulangan Ulir Isian Tiang Pancang

Volume Baja Volume Baja


Polos Ulir
No URAIAN PEKERJAAN Keterangan
BJTP 280 BJTS 420
Kg Kg
1 TOTAL VOLUME BAJA TULANGAN ISIAN SPUN PILE 174.54 482.75
2 TOTAL VOLUME BAJA TULANGAN PILE CUP - 1,124.72
3 TOTAL VOLUME BAJA TULANGAN B1 - 360.86
4 TOTAL VOLUME BAJA TULANGAN B2 Err:509 Err:509
5 TOTAL VOLUME BAJA TULANGAN PLAT 78.88 14,316.28
6
7
Total Vol. Baja Tulangan Err:509 Err:509

Beton mutu fc’ = 24.9 MPa Trastle Dermaga Pariwisata


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Beton Kolom
Vol. Beton mutu fc’ =
No Titik Keterangan
Panajang Lebar Tinggi Tebal Plat 24.9 MPa

(n) L b H h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m3)
1. A 1 1.70 0.80 3.00 4.080
2. B 1 1.70 0.80 3.00 4.080
-
-
-
-
-
-
-
-
-
Total Vol. Beton mutu fc’ = 24.9 MPa Untuk Pile Cup 8.16

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Kode / Tulangan Panjang Panjan Jarak Jumlah Berat Jenis Volume Volume
Titik Total
No Type a b c d e Hak 1 Hak 2 Tul. g n Panjan (Bj) Keterangan
Lokasi D 40 D Tulangan Tulangan BJTP 280 BJTS 420
Tulangan g
m m m m m m m m m m bh m m Bh Kg/m Kg Kg
Utama 19.00 5.80 0.11 0.11 6.03 - 12.00 2.22 160.92
A1
Spiral 10.00 1.70 0.06 0.06 1.82 - 0.15 39.00 0.62 43.63
Utama 19.00 5.80 0.11 0.11 6.03 - 12.00 2.22 160.92
A2
Spiral 10.00 1.70 0.06 0.06 1.82 - 0.15 39.00 0.62 43.63
Utama 19.00 5.80 0.11 0.11 6.03 - 6.00 2.22 80.46
B1
Spiral 10.00 1.70 0.06 0.06 1.82 - 0.15 39.00 0.62 43.63
Utama 19.00 5.80 0.11 0.11 6.03 - 6.00 2.22 80.46
B2
Spiral 10.00 1.70 0.06 0.06 1.82 - 0.15 39.00 0.62 43.63
TOTAL VOLUME BAJA TULANGAN ISIAN SPUN PILE 174.54 482.75

Baja Tulangan Polos Ulir Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Panjang Panjan Jarak Jumlah Berat Volume Volume
Titik Kode / Type Tulangan a b c d e Hak 1 Hak 1 Tul. g
Total
n Panjan Jenis (Bj)
No Keterangan
Lokasi Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m bh m m Bh Kg/m Kg Kg
Type X 19.00 1.50 1.50 1.54 1.54 0.17 0.17 6.43 0.10 16.00 2.22 228.86
KANAN

PC 1 Type Y 19.00 1.30 1.30 1.54 1.54 0.17 0.17 6.03 0.10 14.00 2.22 187.80
Type Z 19.00 1.50 1.50 1.30 1.30 0.17 0.17 5.95 0.15 11.00 2.22 145.70
Type X 19.00 1.50 1.50 1.54 1.54 0.17 0.17 6.43 0.10 16.00 2.22 228.86
KIRI

PC2 Type Y 19.00 1.30 1.30 1.54 1.54 0.17 0.17 6.03 0.10 14.00 2.22 187.80
Type Z 19.00 1.50 1.50 1.30 1.30 0.17 0.17 5.95 0.15 11.00 2.22 145.70
TOTAL VOLUME BAJA TULANGAN PILE CUP - 1,124.72

Baja Tulangan Polos Ulir Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Panjang Panjan Jarak Jumlah Berat Volume Volume
Kode / Type Tulangan a b c d e Hak 1 6D Hak 2 6D
Hak 1 Hak 2 Tul. g
Total
n Panjan Jenis (Bj)
No Titik Lokasi 12D 12D Keterangan
Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
1 BALOK KOLOM 170X80
Tulangan Utama 19 3.66 0.11 0.23 4.00 34.00 2.225 302.69 SISI KANAN
- -
Tulangan Beugel 10 1.60 0.70 1.60 0.70 0.06 0.06 4.72 20.00 0.616 58.17
- -
- -
- -

TOTAL VOLUME BAJA TULANGAN K1 - 360.86


Dimensi Penulangan Lewatan
Dimeter
Panjan Jarak Jumlah Volume Volume
Tulangan Panjang Total Berat
Kode / Type Hak 1 Hak 2 g
No Titik Lokasi a b c d e Hak 1 6D Hak 2 6D Tul. n Jenis (Bj) Keterangan
Tulangan 12D 12D Panjan
D 40 D Tulangan Tulangan
g BJTP 280 BJTS 420
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
2 BALOK KOLOM 170X80
Tulangan Utama 19 3.66 0.11 0.23 4.00 34.00 2.225 302.69 SISI KIRI
- -
Tulangan Beugel 10 1.60 0.70 1.60 0.70 0.06 0.06 4.72 20.00 0.616 58.17
- -
- -
- -

TOTAL VOLUME BAJA TULANGAN K1 - 360.86

Baja Tulangan Polos Ulir Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA PARIWISATA
Item Pembayaran : Baja Tulangan Polos BALOK INDUK B2
Baja Tulangan Ulir BALOK INDUK B2
Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Panjang Panjan Jarak Jumlah Berat Volume Volume
Kode / Type Tulangan a b c d e Hak 1 6D Hak 2 6D
Hak 1 Hak 2 Tul. g
Total
n Panjan Jenis (Bj)
No Titik Lokasi 12D 12D Keterangan
Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
1 BALOK ANAK B2 MEMANJANG DELATASI - UJUNG TRASTLE GRID E'
Tul. Menerus 19 78.83 0.23 0.23 79.286 0.76 15.00 11.40 6.00 2.225 1,210.43
Tul. Tumpuan Ujung 19 1.94 0.11 0.23 2.282 0.76 4.00 2.225 20.31
Tul. Tumpuan atas B1 19 2.76 0.11 0.11 2.988 0.76 Err:509 2.225 Err:509
Tul. Lapangan 19 2.76 0.11 0.11 2.988 0.76 Err:508 2.225 Err:508
Tul. Torsi 10 78.83 0.12 0.12 79.070 0.40 15.00 6.00 2.00 0.616 104.84
Begel 10 0.30 0.20 0.30 0.20 0.06 0.06 1.120 0.40 0.125 Err:508 0.616 Err:508

2 BALOK ANAK B2 MELINTANG


Tul. Menerus 19 5.90 0.23 0.23 6.356 0.76 Err:509 2.225 Err:509
Tul. Tumpuan Ujung 19 2.31 0.11 0.23 2.652 0.76 Err:509 2.225 Err:509
Tul. Lapangan 19 2.76 0.11 0.11 2.988 0.76 Err:509 2.225 Err:509
Tul. Torsi 10 5.90 0.12 0.12 6.140 0.40 Err:509 0.616 Err:509
Begel 10 0.30 0.20 0.30 0.20 0.06 0.06 1.120 0.40 0.125 Err:509 0.616 Err:509

Baja Tulangan Polos Ulir Trastle Dermaga


Dimeter Dimensi Penulangan Lewatan
Panjang Panjan Jarak Jumlah Berat Volume Volume
Kode / Type Tulangan a b c d e Hak 1 6D Hak 2 6D
Hak 1 Hak 2 Tul. g
Total
n Panjan Jenis (Bj)
No Titik Lokasi 12D 12D Keterangan
Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
3 BALOK ANAK B2 MELINTANG PADA AREA SAYAP
Tul. Menerus 19 10.05 0.23 0.23 10.506 0.76 6.00 2.225 140.23
Tul. Tumpuan Ujung 19 2.31 0.11 0.23 2.652 0.76 4.00 2.225 23.60
Tul. Tumpuan atas B1 19 2.76 0.11 0.11 2.988 0.76 4.00 2.225 26.59
Tul. Lapangan 19 2.76 0.11 0.11 2.988 0.76 6.00 2.225 39.88
Tul. Torsi 10 10.05 0.12 0.12 10.290 0.40 2.00 0.616 12.68
Begel 10 0.30 0.20 0.30 0.20 0.06 0.06 1.120 0.40 0.125 74.00 0.616 51.07

TOTAL VOLUME BAJA TULANGAN B2 Err:509 Err:509

Baja Tulangan Polos Ulir Trastle Dermaga


BACK UP DATA
PENGEMBANGAN KAWASAN WISATA SIRING LAUT
PENYEDIA JASA : PT. ARAFAH ALAM SEJAHTERA
NOMOR KONTRAK : 602/05/SP/WISATA-SIRLA/BGJK/DPUPR/2022
TANGGAL KONTRAK : 6/27/2022
MANAJEMEN KONSTRUKSI : PT. DELTA BUANA KONSULTAN
LOKASI : KABUPATEN KOTABRU
TAHUN ANGGARAN : 2020 S/d 2024
URAIAN LOKASI PELAKSANAAN : PEKERJAAN DERMAGA / TRASTLE DERMAGA PARIWISATA
Item Pembayaran : Baja Tulangan Polos PLAT
Baja Tulangan Ulir PLAT
Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Panjang Panjan Jarak Jumlah Berat Volume Volume
Kode / Type Tulangan a b c d e Hak 1 6D Hak 2 6D
Hak 1 Hak 2 Tul. g
Total
n Panjan Jenis (Bj)
No Titik Lokasi 12D 12D Keterangan
Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
1 PLAT LANTAI DELATASI - UJUNG PLAT
Layer 1 ARAH X 13 78.83 0.08 0.08 78.986 0.52 15.00 7.80 39.00 1.041 3,524.85
Layer 1 ARAH Y 13 5.90 0.05 0.05 6.000 0.52 525.00 1.041 3,280.47
Layer 2 ARAH X 13 78.83 0.08 0.08 78.986 0.52 15.00 7.80 39.00 1.041 3,524.85
Layer 2 ARAH Y 13 5.90 0.05 0.05 6.000 0.52 525.00 1.041 3,280.47

2 PLAT LANTAI AREA SAYAP


Layer 1 ARAH X 13 5.90 0.08 0.08 6.056 0.52 3.00 1.56 24.00 1.041 190.35
Layer 1 ARAH Y 13 1.90 0.05 0.05 2.000 0.52 78.00 1.041 162.46
Layer 2 ARAH X 13 5.90 0.08 0.08 6.056 0.52 3.00 1.56 24.00 1.041 190.35
Layer 2 ARAH Y 13 1.90 0.05 0.05 2.000 0.52 78.00 1.041 162.46

Baja Tulangan Polos Ulir Trastle Dermaga


Dimeter Dimensi Penulangan Lewatan
Panjang Panjan Jarak Jumlah Berat Volume Volume
Kode / Type Tulangan a b c d e Hak 1 6D Hak 2 6D
Hak 1 Hak 2 Tul. g
Total
n Panjan Jenis (Bj)
No Titik Lokasi 12D 12D Keterangan
Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m m m bh m m Bh Kg/m Kg Kg
3 TULANGAN PENYANGGA TULANGAN LAYER ATAS (TULANGAN KUDA-KUDA)
TUL.KORSET/KUDA-KUDA 10 0.80 0.800 160.00 0.616 78.88

TOTAL VOLUME BAJA TULANGAN PLAT 78.88 14,316.28

Baja Tulangan Polos Ulir Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Bikesting Pile Cup


Vol. Beton mutu fc’ =
No Titik Keterangan
LEBAR TINGGI SISI Tebal Plat 24.9 MPa

(n) L H 2X h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m3)
1. A 1 2.00 1.00 2.00 4.000
2. A 1 2.00 1.00 2.00 4.000
3. B 1 2.00 1.00 2.00 4.000
4. B 1 2.00 1.00 2.00 4.000
-
-
-
-
-
-
-
Total Vol. Bikisting Untuk Pile Cup 16.00

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Bikesting Pile Cup


Vol. Beton mutu fc’ =
No Titik Keterangan
LEBAR TINGGI SISI Tebal Plat 24.9 MPa

(n) L H 2X h V = L x b x (H- h) n
(bh) (m) (m) (m) (m) (m3)
1. A 1 1.70 3.00 2.00 10.200
2. A 1 0.80 3.00 2.00 4.800
3. B 1 1.70 3.00 2.00 10.200
4. B 1 0.80 3.00 2.00 4.800
-
-
-
-
-
-
-
Total Vol. Bikisting Untuk Pile Cup 30.00

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Pek. Galian Pile Cape


No Titik Volume Keterangan
PANJANG LEBAR TINGGI JUMLAH

(bh) (m) (m) (m) (m) (m3)


1. A 1 2.00 2.00 1.25 5.000
2. B 1 2.00 2.00 1.25 5.000
3. -
4. -
-
-
-
-
-
-
-
Total Vol. 10.00

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Pek. Galian Pile Cape


No Titik Volume Keterangan
PANJANG LEBAR TINGGI JUMLAH

(bh) (m) (m) (m) (m) (m3)


1. A 1 2.00 2.00 0.10 0.400
2. B 1 2.00 2.00 0.10 0.400
3. -
4. -
-
-
-
-
-
-
-
Total Vol. 0.80

Beton mutu fc’ = 24.9 MPa Trastle Dermaga


NOTA PESANAN JEMBATAN PAKET 5
No.
Item Name Quantity Satuan Harga Toko Harga Harga
1. Besi Ulir D.19 26.00 Btg

Besi Polos D.10 14.00 Batang

Sub Total Pembelian -


BACK UP DATA

PENYEDIA JASA :
NOMOR KONTRAK :
TANGGAL KONTRAK :
MANAJEMEN KONSTRUKSI :
LOKASI :
TAHUN ANGGARAN :
URAIAN LOKASI PELAKSANAAN :
Item Pembayaran :

Berat Jenis (Bj) 7,850.00

Dimeter Dimensi Penulangan Lewatan


Panjang Panjan Jarak Jumlah Berat Volume Volume
Titik Kode / Type Tulangan a b c d e Hak 1 Hak 1 Tul. g
Total
n Panjan Jenis (Bj)
No Keterangan
Lokasi Tulangan D 40 D Tulangan Tulangan BJTP 280 BJTS 420
g
m m m m m m m m m m bh m m Bh Kg/m Kg Kg
Type X 10.00 3.94 0.02 0.02 3.98 0.15 11.00 0.62 26.98
Lapis 1 Type Y 10.00 1.44 0.02 0.02 1.48 0.15 27.00 0.62 24.62

Type X 10.00 3.94 0.02 0.02 3.98 0.15 11.00 0.62 26.98
Lapis 2 Type Y 10.00 1.44 0.02 0.02 1.48 0.15 27.00 0.62 24.62
-
TOTAL VOLUME BAJA TULANGAN PILE CUP 103.21 -

Baja Tulangan Polos Ulir Trastle Dermaga


Rekap Volume Struktur Jembatan
No. Uraian Sat. Volume
1. Bekisting m2 46.00
2. Pembesian kg 2503.73
3. Beton m3 20.87

Catatan :
Besi Yang di gunakan untuk pembuatan struktur jembatan adalah D.19 ulir untuk
tulangan utama D.10 ulir untuk beugel kolom dan Besi 10 Polos Untuk Beugel Spiral Bor
pile