You are on page 1of 148

Finalizo ejecucion del programa DPL ....

info - DPL Command 'CAIDAS_TENSION' successfully executed


-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) | |
| B_02 24,90 0,99 24,76 -0,09 | |
| Cub_1 /Lod CARGA_02 0,80 0,43 0,88 0,02 |Pl0: 0,80 MW Ql0: 0,43 Mvar |
| Cub_1 /Lne Line_01_02 -3,33 -2,33 -0,82 0,09 35,28 |Pv: 14,81 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Lne Line_02_03 2,53 1,90 0,80 0,07 27,52 |Pv: 22,51 kW cLod: 0,01 Mvar L: 5,00 km|
| | |
|Single Busbar(10) | |
| B_11 0,38 0,98 0,37 -1,15 | |
| Cub_1 /Lod CARGA_11 0,15 0,07 0,90 0,26 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Tr2 XFO_CARGA_11 -0,15 -0,07 -0,90 0,26 56,93 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar(12) | |
| B_12 24,90 0,89 22,07 -1,63 | |
| Cub_1 /Lne Line_09_12 -0,60 -0,31 -0,89 0,02 9,70 |Pv: 7,56 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Tr2 XFO_CARGA_13 0,60 0,31 0,89 0,02 76,10 |Tap: 0,00 Min: -10 Max: 10 |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

1
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(13) | |
| B_13 0,38 0,88 0,33 -2,96 | |
| Cub_1 /Lod CARGA_13 0,60 0,29 0,90 1,16 |Pl0: 0,60 MW Ql0: 0,29 Mvar |
| Cub_1 /Tr2 XFO_CARGA_13 -0,60 -0,29 -0,90 1,16 76,10 |Tap: 0,00 Min: -10 Max: 10 |
| | |
|Single Busbar(2) | |
| B_03 24,90 0,98 24,49 -0,25 | |
| Cub_1 /Lne Line_02_03 -2,51 -1,88 -0,80 0,07 27,52 |Pv: 22,51 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line_03_04 2,36 1,81 0,79 0,07 26,16 |Pv: 24,38 kW cLod: 0,01 Mvar L: 6,00 km|
| Cub_1 /Lne Line_03_10 0,15 0,07 0,90 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| | |
|Single Busbar(3) | |
| B_04 24,90 0,97 24,18 -0,42 | |
| Cub_1 /Lod CARGA_04 0,50 0,21 0,92 0,01 |Pl0: 0,50 MW Ql0: 0,21 Mvar |
| Cub_1 /Lne Line 1,84 1,58 0,76 0,06 21,64 |Pv: 27,73 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line_03_04 -2,34 -1,79 -0,79 0,07 26,16 |Pv: 24,38 kW cLod: 0,01 Mvar L: 6,00 km|
| | |
|Single Busbar(4) | |
| B_05 24,90 0,95 23,75 -0,61 | |
| Cub_1 /Lod CARGA_05 0,35 0,90 0,36 0,02 |Pl0: 0,35 MW Ql0: 0,90 Mvar |
| Cub_1 /Lne Line -1,81 -1,57 -0,76 0,06 21,64 |Pv: 27,73 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line(1) 1,46 0,67 0,91 0,04 21,50 |Pv: 12,60 kW cLod: 0,01 Mvar L: 5,00 km|
| | |
|Single Busbar(5) | |
| B_07 24,90 0,93 23,19 -0,92 | |
| Cub_1 /Lod CARGA_07 0,40 0,25 0,85 0,01 |Pl0: 0,40 MW Ql0: 0,25 Mvar |
| Cub_1 /Lne Line(2) -1,28 -0,60 -0,91 0,04 19,36 |Pv: 16,30 kW cLod: 0,02 Mvar L: 8,00 km|
| Cub_1 /Lne Line(3) 0,88 0,35 0,93 0,02 13,15 |Pv: 14,00 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

2
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(6) | |
| B_06 24,90 0,94 23,52 -0,74 | |
| Cub_1 /Lod CARGA_06 0,15 0,07 0,90 0,00 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Lne Line(1) -1,45 -0,67 -0,91 0,04 21,50 |Pv: 12,60 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line(2) 1,30 0,60 0,91 0,04 19,36 |Pv: 16,30 kW cLod: 0,02 Mvar L: 8,00 km|
| | |
|Single Busbar(7) | |
| B_08 24,90 0,91 22,78 -1,21 | |
| Cub_1 /Lod CARGA_08 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne Line(3) -0,87 -0,37 -0,92 0,02 13,15 |Pv: 14,00 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Lne Line(4) 0,62 0,25 0,93 0,02 9,51 |Pv: 9,65 kW cLod: 0,04 Mvar L: 20,00 km|
| | |
|Single Busbar(8) | |
| B_09 24,90 0,90 22,38 -1,47 | |
| Cub_1 /Lne Line(4) -0,61 -0,28 -0,91 0,02 9,51 |Pv: 9,65 kW cLod: 0,04 Mvar L: 20,00 km|
| Cub_1 /Lne Line_09_12 0,61 0,28 0,91 0,02 9,70 |Pv: 7,56 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
|Single Busbar(9) | |
| B_10 24,90 0,98 24,49 -0,25 | |
| Cub_1 /Lne Line_03_10 -0,15 -0,08 -0,89 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| Cub_1 /Tr2 XFO_CARGA_11 0,15 0,08 0,89 0,00 56,93 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_1 /Xnet External Grid 3,35 2,35 0,82 0,09 |Sk": 10000,00 MVA |
| Cub_1 /Lne Line_01_02 3,35 2,35 0,82 0,09 35,28 |Pv: 14,81 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

3
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) |
| B_02 24,90 0,994 24,76 -0,09 |
|Single Busbar(10) |
| B_11 0,38 0,976 0,37 -1,15 |
|Single Busbar(12) |
| B_12 24,90 0,886 22,07 -1,63 |
|Single Busbar(13) |
| B_13 0,38 0,876 0,33 -2,96 |
|Single Busbar(2) |
| B_03 24,90 0,984 24,49 -0,25 |
|Single Busbar(3) |
| B_04 24,90 0,971 24,18 -0,42 |
|Single Busbar(4) |
| B_05 24,90 0,954 23,75 -0,61 |
|Single Busbar(5) |
| B_07 24,90 0,931 23,19 -0,92 |
|Single Busbar(6) |
| B_06 24,90 0,945 23,52 -0,74 |
|Single Busbar(7) |
| B_08 24,90 0,915 22,78 -1,21 |
-----------------------------------------------------------------------------------------------------------------------------------

4
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(8) |
| B_09 24,90 0,899 22,38 -1,47 |
|Single Busbar(9) |
| B_10 24,90 0,983 24,49 -0,25 |
|Single Busbar |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

5
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,75 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,36 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,75 0,00 0,00 0,00 |
| -0,36 0,02 0,02 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,45 0,00 3,35 0,15 0,15 -0,00 |
| 0,00 0,00 1,99 0,00 2,35 -0,02 0,16 -0,18 |
| 0,38 kV 0,75 0,00 0,00 0,00 |
| 0,38 0,02 0,02 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 3,20 0,00 3,35 0,00 0,15 0,15 -0,00 |
| 0,00 0,00 2,35 0,00 2,35 0,00 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------

6
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\RED_09_NODOS(1)\Network Model\Network Data\Grid |
| 0,00 0,00 3,20 0,00 3,35 0,00 0,15 0,15 -0,00 |
| 0,00 0,00 2,35 0,00 2,35 0,00 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 3,20 0,00 3,35 0,15 0,15 -0,00 |
| 0,00 0,00 2,35 0,00 2,35 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------

7
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) | |
| B_02 24,90 0,99 24,74 -0,11 | |
| Cub_1 /Lod CARGA_02 0,80 0,43 0,88 0,02 |Pl0: 0,80 MW Ql0: 0,43 Mvar |
| Cub_1 /Lne Line_01_02 -3,86 -2,69 -0,82 0,11 40,81 |Pv: 19,82 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Lne Line_02_03 3,06 2,26 0,80 0,09 33,04 |Pv: 32,45 kW cLod: 0,01 Mvar L: 5,00 km|

8
| | |
|Single Busbar(10) | |
| B_11 0,38 0,97 0,37 -1,21 | |
| Cub_1 /Lod CARGA_11 0,15 0,07 0,90 0,26 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Tr2 XFO_CARGA_11 -0,15 -0,07 -0,90 0,26 57,11 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar(12) | |
| B_12 24,90 0,83 20,75 -2,19 | |
| Cub_1 /Lne Line_09_12 -1,00 -0,54 -0,88 0,03 17,38 |Pv: 24,50 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Tr2 XFO_CARGA_13 1,00 0,54 0,88 0,03 136,39 |Tap: 0,00 Min: -10 Max: 10 |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

9
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(13) | |
| B_13 0,38 0,81 0,31 -4,72 | |
| Cub_1 /Lod CARGA_13 1,00 0,48 0,90 2,07 |Pl0: 1,00 MW Ql0: 0,48 Mvar |
| Cub_1 /Tr2 XFO_CARGA_13 -1,00 -0,48 -0,90 2,07 136,39 |Tap: 0,00 Min: -10 Max: 10 |
| | |
|Single Busbar(2) | |
| B_03 24,90 0,98 24,42 -0,30 | |
| Cub_1 /Lne Line_02_03 -3,03 -2,23 -0,81 0,09 33,04 |Pv: 32,45 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line_03_04 2,88 2,15 0,80 0,09 31,67 |Pv: 35,75 kW cLod: 0,01 Mvar L: 6,00 km|
| Cub_1 /Lne Line_03_10 0,15 0,07 0,90 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| | |
|Single Busbar(3) | |
| B_04 24,90 0,97 24,04 -0,52 | |
| Cub_1 /Lod CARGA_04 0,50 0,21 0,92 0,01 |Pl0: 0,50 MW Ql0: 0,21 Mvar |
| Cub_1 /Lne Line 2,34 1,91 0,77 0,07 27,09 |Pv: 43,52 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line_03_04 -2,84 -2,12 -0,80 0,09 31,67 |Pv: 35,75 kW cLod: 0,01 Mvar L: 6,00 km|
| | |
|Single Busbar(4) | |
| B_05 24,90 0,94 23,51 -0,79 | |
| Cub_1 /Lod CARGA_05 0,35 0,90 0,36 0,02 |Pl0: 0,35 MW Ql0: 0,90 Mvar |
| Cub_1 /Lne Line -2,30 -1,88 -0,77 0,07 27,09 |Pv: 43,52 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line(1) 1,95 0,98 0,89 0,05 29,48 |Pv: 23,70 kW cLod: 0,01 Mvar L: 5,00 km|
| | |
|Single Busbar(5) | |
| B_07 24,90 0,91 22,72 -1,17 | |
| Cub_1 /Lod CARGA_07 0,40 0,25 0,85 0,01 |Pl0: 0,40 MW Ql0: 0,25 Mvar |
| Cub_1 /Lne Line(2) -1,74 -0,89 -0,89 0,05 27,30 |Pv: 32,47 kW cLod: 0,02 Mvar L: 8,00 km|
| Cub_1 /Lne Line(3) 1,34 0,64 0,90 0,04 20,94 |Pv: 35,65 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

10
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(6) | |
| B_06 24,90 0,93 23,19 -0,95 | |
| Cub_1 /Lod CARGA_06 0,15 0,07 0,90 0,00 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Lne Line(1) -1,92 -0,97 -0,89 0,05 29,48 |Pv: 23,70 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line(2) 1,77 0,90 0,89 0,05 27,30 |Pv: 32,47 kW cLod: 0,02 Mvar L: 8,00 km|
| | |
|Single Busbar(7) | |
| B_08 24,90 0,89 22,05 -1,54 | |
| Cub_1 /Lod CARGA_08 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne Line(3) -1,31 -0,64 -0,90 0,04 20,94 |Pv: 35,65 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Lne Line(4) 1,06 0,52 0,90 0,03 17,19 |Pv: 31,86 kW cLod: 0,04 Mvar L: 20,00 km|
| | |
|Single Busbar(8) | |
| B_09 24,90 0,86 21,31 -1,92 | |
| Cub_1 /Lne Line(4) -1,02 -0,53 -0,89 0,03 17,19 |Pv: 31,86 kW cLod: 0,04 Mvar L: 20,00 km|
| Cub_1 /Lne Line_09_12 1,02 0,53 0,89 0,03 17,38 |Pv: 24,50 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
|Single Busbar(9) | |
| B_10 24,90 0,98 24,41 -0,30 | |
| Cub_1 /Lne Line_03_10 -0,15 -0,08 -0,89 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| Cub_1 /Tr2 XFO_CARGA_11 0,15 0,08 0,89 0,00 57,11 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_1 /Xnet External Grid 3,88 2,71 0,82 0,11 |Sk": 10000,00 MVA |
| Cub_1 /Lne Line_01_02 3,88 2,71 0,82 0,11 40,81 |Pv: 19,82 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

11
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) |
| B_02 24,90 0,994 24,74 -0,11 |
|Single Busbar(10) |
| B_11 0,38 0,973 0,37 -1,21 |
|Single Busbar(12) |
| B_12 24,90 0,833 20,75 -2,19 |
|Single Busbar(13) |
| B_13 0,38 0,815 0,31 -4,72 |
|Single Busbar(2) |
| B_03 24,90 0,981 24,42 -0,30 |
|Single Busbar(3) |
| B_04 24,90 0,966 24,04 -0,52 |
|Single Busbar(4) |
| B_05 24,90 0,944 23,51 -0,79 |
|Single Busbar(5) |
| B_07 24,90 0,912 22,72 -1,17 |
|Single Busbar(6) |
| B_06 24,90 0,931 23,19 -0,95 |
|Single Busbar(7) |
| B_08 24,90 0,885 22,05 -1,54 |
-----------------------------------------------------------------------------------------------------------------------------------

12
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(8) |
| B_09 24,90 0,856 21,31 -1,92 |
|Single Busbar(9) |
| B_10 24,90 0,980 24,41 -0,30 |
|Single Busbar |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

13
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 1,15 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,56 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -1,15 0,00 0,00 0,00 |
| -0,56 0,06 0,06 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,45 0,00 3,88 0,28 0,28 -0,00 |
| 0,00 0,00 1,99 0,00 2,71 0,11 0,28 -0,17 |
| 0,38 kV 1,15 0,00 0,00 0,00 |
| 0,62 0,06 0,06 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 3,60 0,00 3,88 0,00 0,28 0,28 -0,00 |
| 0,00 0,00 2,54 0,00 2,71 0,00 0,17 0,34 -0,17 |
-----------------------------------------------------------------------------------------------------------------------------------

14
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\RED_09_NODOS(1)\Network Model\Network Data\Grid |
| 0,00 0,00 3,60 0,00 3,88 0,00 0,28 0,28 -0,00 |
| 0,00 0,00 2,54 0,00 2,71 0,00 0,17 0,34 -0,17 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 3,60 0,00 3,88 0,28 0,28 -0,00 |
| 0,00 0,00 2,54 0,00 2,71 0,17 0,34 -0,17 |
-----------------------------------------------------------------------------------------------------------------------------------

15
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) | |
| B_02 24,90 0,99 24,76 -0,09 | |
| Cub_1 /Lod CARGA_02 0,80 0,43 0,88 0,02 |Pl0: 0,80 MW Ql0: 0,43 Mvar |
| Cub_1 /Lne Line_01_02 -3,33 -2,33 -0,82 0,09 35,28 |Pv: 14,81 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Lne Line_02_03 2,53 1,90 0,80 0,07 27,52 |Pv: 22,51 kW cLod: 0,01 Mvar L: 5,00 km|

16
| | |
|Single Busbar(10) | |
| B_11 0,38 0,98 0,37 -1,15 | |
| Cub_1 /Lod CARGA_11 0,15 0,07 0,90 0,26 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Tr2 XFO_CARGA_11 -0,15 -0,07 -0,90 0,26 56,93 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar(12) | |
| B_12 24,90 0,89 22,07 -1,63 | |
| Cub_1 /Lne Line_09_12 -0,60 -0,31 -0,89 0,02 9,70 |Pv: 7,56 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Tr2 XFO_CARGA_13 0,60 0,31 0,89 0,02 76,10 |Tap: 0,00 Min: -10 Max: 10 |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

17
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(13) | |
| B_13 0,38 0,88 0,33 -2,96 | |
| Cub_1 /Lod CARGA_13 0,60 0,29 0,90 1,16 |Pl0: 0,60 MW Ql0: 0,29 Mvar |
| Cub_1 /Tr2 XFO_CARGA_13 -0,60 -0,29 -0,90 1,16 76,10 |Tap: 0,00 Min: -10 Max: 10 |
| | |
|Single Busbar(2) | |
| B_03 24,90 0,98 24,49 -0,25 | |
| Cub_1 /Lne Line_02_03 -2,51 -1,88 -0,80 0,07 27,52 |Pv: 22,51 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line_03_04 2,36 1,81 0,79 0,07 26,16 |Pv: 24,38 kW cLod: 0,01 Mvar L: 6,00 km|
| Cub_1 /Lne Line_03_10 0,15 0,07 0,90 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| | |
|Single Busbar(3) | |
| B_04 24,90 0,97 24,18 -0,42 | |
| Cub_1 /Lod CARGA_04 0,50 0,21 0,92 0,01 |Pl0: 0,50 MW Ql0: 0,21 Mvar |
| Cub_1 /Lne Line 1,84 1,58 0,76 0,06 21,64 |Pv: 27,73 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line_03_04 -2,34 -1,79 -0,79 0,07 26,16 |Pv: 24,38 kW cLod: 0,01 Mvar L: 6,00 km|
| | |
|Single Busbar(4) | |
| B_05 24,90 0,95 23,75 -0,61 | |
| Cub_1 /Lod CARGA_05 0,35 0,90 0,36 0,02 |Pl0: 0,35 MW Ql0: 0,90 Mvar |
| Cub_1 /Lne Line -1,81 -1,57 -0,76 0,06 21,64 |Pv: 27,73 kW cLod: 0,02 Mvar L: 10,00 km|
| Cub_1 /Lne Line(1) 1,46 0,67 0,91 0,04 21,50 |Pv: 12,60 kW cLod: 0,01 Mvar L: 5,00 km|
| | |
|Single Busbar(5) | |
| B_07 24,90 0,93 23,19 -0,92 | |
| Cub_1 /Lod CARGA_07 0,40 0,25 0,85 0,01 |Pl0: 0,40 MW Ql0: 0,25 Mvar |
| Cub_1 /Lne Line(2) -1,28 -0,60 -0,91 0,04 19,36 |Pv: 16,30 kW cLod: 0,02 Mvar L: 8,00 km|
| Cub_1 /Lne Line(3) 0,88 0,35 0,93 0,02 13,15 |Pv: 14,00 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

18
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(6) | |
| B_06 24,90 0,94 23,52 -0,74 | |
| Cub_1 /Lod CARGA_06 0,15 0,07 0,90 0,00 |Pl0: 0,15 MW Ql0: 0,07 Mvar |
| Cub_1 /Lne Line(1) -1,45 -0,67 -0,91 0,04 21,50 |Pv: 12,60 kW cLod: 0,01 Mvar L: 5,00 km|
| Cub_1 /Lne Line(2) 1,30 0,60 0,91 0,04 19,36 |Pv: 16,30 kW cLod: 0,02 Mvar L: 8,00 km|
| | |
|Single Busbar(7) | |
| B_08 24,90 0,91 22,78 -1,21 | |
| Cub_1 /Lod CARGA_08 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne Line(3) -0,87 -0,37 -0,92 0,02 13,15 |Pv: 14,00 kW cLod: 0,03 Mvar L: 15,00 km|
| Cub_1 /Lne Line(4) 0,62 0,25 0,93 0,02 9,51 |Pv: 9,65 kW cLod: 0,04 Mvar L: 20,00 km|
| | |
|Single Busbar(8) | |
| B_09 24,90 0,90 22,38 -1,47 | |
| Cub_1 /Lne Line(4) -0,61 -0,28 -0,91 0,02 9,51 |Pv: 9,65 kW cLod: 0,04 Mvar L: 20,00 km|
| Cub_1 /Lne Line_09_12 0,61 0,28 0,91 0,02 9,70 |Pv: 7,56 kW cLod: 0,03 Mvar L: 15,00 km|
| | |
|Single Busbar(9) | |
| B_10 24,90 0,98 24,49 -0,25 | |
| Cub_1 /Lne Line_03_10 -0,15 -0,08 -0,89 0,00 2,18 |Pv: 0,03 kW cLod: 0,00 Mvar L: 1,00 km|
| Cub_1 /Tr2 XFO_CARGA_11 0,15 0,08 0,89 0,00 56,93 |Tap: 0,00 Min: 0 Max: 0 |
| | |
|Single Busbar | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_1 /Xnet External Grid 3,35 2,35 0,82 0,09 |Sk": 10000,00 MVA |
| Cub_1 /Lne Line_01_02 3,35 2,35 0,82 0,09 35,28 |Pv: 14,81 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

19
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(1) |
| B_02 24,90 0,994 24,76 -0,09 |
|Single Busbar(10) |
| B_11 0,38 0,976 0,37 -1,15 |
|Single Busbar(12) |
| B_12 24,90 0,886 22,07 -1,63 |
|Single Busbar(13) |
| B_13 0,38 0,876 0,33 -2,96 |
|Single Busbar(2) |
| B_03 24,90 0,984 24,49 -0,25 |
|Single Busbar(3) |
| B_04 24,90 0,971 24,18 -0,42 |
|Single Busbar(4) |
| B_05 24,90 0,954 23,75 -0,61 |
|Single Busbar(5) |
| B_07 24,90 0,931 23,19 -0,92 |
|Single Busbar(6) |
| B_06 24,90 0,945 23,52 -0,74 |
|Single Busbar(7) |
| B_08 24,90 0,915 22,78 -1,21 |
-----------------------------------------------------------------------------------------------------------------------------------

20
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Single Busbar(8) |
| B_09 24,90 0,899 22,38 -1,47 |
|Single Busbar(9) |
| B_10 24,90 0,983 24,49 -0,25 |
|Single Busbar |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

21
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,75 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,36 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,75 0,00 0,00 0,00 |
| -0,36 0,02 0,02 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,45 0,00 3,35 0,15 0,15 0,00 |
| 0,00 0,00 1,99 0,00 2,35 -0,02 0,16 -0,18 |
| 0,38 kV 0,75 0,00 0,00 0,00 |
| 0,38 0,02 0,02 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 3,20 0,00 3,35 0,00 0,15 0,15 0,00 |
| 0,00 0,00 2,35 0,00 2,35 0,00 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------

22
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\RED_09_NODOS(1)\Network Model\Network Data\Grid |
| 0,00 0,00 3,20 0,00 3,35 0,00 0,15 0,15 0,00 |
| 0,00 0,00 2,35 0,00 2,35 0,00 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 3,20 0,00 3,35 0,15 0,15 0,00 |
| 0,00 0,00 2,35 0,00 2,35 -0,00 0,18 -0,18 |
-----------------------------------------------------------------------------------------------------------------------------------

23
Study Case Study Case deactivated.
info - Project RED_09_NODOS(1) deactivated.
info - Activating Project Project(1)...
info - Study Case Study Case activated.
info - Project Project(1) activated.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Load flow iteration: 4
info - Load flow iteration: 5
info - Load flow iteration: 6
info - Load flow iteration: 7
info - Load flow iteration: 8
info - Load flow iteration: 9
info - Load flow iteration: 10
info - Load flow iteration: 11
warn - Newton algorithm stagnated. Error during the last 10 iterations could not be reduced by a factor 0,50.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Load flow iteration: 4
info - Load flow iteration: 5
info - Load flow iteration: 6
info - Load flow iteration: 7
info - Load flow iteration: 8
info - Load flow iteration: 9
info - Load flow iteration: 10
warn - Newton algorithm stagnated. Error during the last 10 iterations could not be reduced by a factor 0,50.
err - No convergence in load flow!
err - Load flow calculation not executed.
info - Element 'External Grid' is local reference in separated area of 'B_01'

24
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Load flow iteration: 4
info - Load flow iteration: 5
info - Load flow iteration: 6
info - Load flow iteration: 7
info - Load flow iteration: 8
info - Load flow iteration: 9
info - Load flow iteration: 10
info - Load flow iteration: 11
warn - Newton algorithm stagnated. Error during the last 10 iterations could not be reduced by a factor 0,50.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Load flow iteration: 4
info - Load flow iteration: 5
info - Load flow iteration: 6
info - Load flow iteration: 7
info - Load flow iteration: 8
info - Load flow iteration: 9
info - Load flow iteration: 10
warn - Newton algorithm stagnated. Error during the last 10 iterations could not be reduced by a factor 0,50.
err - No convergence in load flow!
err - Load flow calculation not executed.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2

25
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |

26
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,59 -0,11 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,55 -1,26 -0,90 0,07 29,01 |Pv: 29,39 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,53 1,25 0,90 0,07 28,84 |Pv: 29,05 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,96 23,97 -0,61 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,58 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,97 24,26 -0,50 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_05_12 -1,28 -0,63 -0,90 0,03 14,78 |Pv: 9,54 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 0,61 0,90 0,03 14,26 |Pv: 3,55 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

27
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,97 24,18 -0,53 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,23 -0,60 -0,90 0,03 14,26 |Pv: 3,55 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 0,58 0,90 0,03 13,74 |Pv: 3,30 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,97 24,11 -0,56 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 -0,58 -0,90 0,03 13,74 |Pv: 3,30 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 0,55 0,90 0,03 13,17 |Pv: 4,54 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,96 24,00 -0,60 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 -0,55 -0,90 0,03 13,17 |Pv: 4,54 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 0,53 0,90 0,03 12,59 |Pv: 2,77 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,96 23,94 -0,62 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,67 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 -0,53 -0,90 0,03 12,59 |Pv: 2,77 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

28
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,96 23,81 -0,68 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_1 /Shnt Shunt/Filter(2) | |
| Cub_3 /Lne LINEA_16_17 -0,82 -0,40 -0,90 0,02 9,67 |Pv: 4,08 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,07 0,04 0,89 0,00 58,58 |Tap: 4,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 1,00 0,38 -1,62 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,13 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,07 -0,04 -0,90 0,13 58,58 |Tap: 4,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,98 24,32 -0,48 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 0,41 0,90 0,02 9,68 |Pv: 4,91 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 -0,41 -0,90 0,02 9,68 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,96 23,94 -0,62 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,67 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,67 |Pv: 4,08 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,29 -0,23 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,50 -1,23 -0,90 0,07 28,84 |Pv: 29,05 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,50 1,23 0,90 0,07 28,84 |Pv: 14,52 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

29
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,99 24,75 -0,31 | |
| Cub_1 /Lne LINEA_04_05(1) 2,45 1,21 0,90 0,06 27,73 |Pv: 26,84 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux |Pv: cLod: L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul -2,45 -1,21 -0,90 0,06 14,97 | |
| | |
|Substation(3) | |
| B_04 24,90 0,97 24,13 -0,29 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,49 -1,22 -0,90 0,07 28,84 |Pv: 14,52 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux |Pv: cLod: L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul 2,45 1,21 0,90 0,07 14,97 | |
| | |
|Substation(4) | |
| B_05 24,90 0,98 24,45 -0,42 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,43 -1,19 -0,90 0,06 27,73 |Pv: 26,84 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,54 0,90 0,03 12,55 |Pv: 5,50 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 0,63 0,90 0,03 14,78 |Pv: 9,54 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,98 24,32 -0,47 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,53 -0,90 0,03 12,55 |Pv: 5,50 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 0,41 0,90 0,02 9,68 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

30
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,97 24,16 -0,54 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) | |
| Cub_3 /Lne LINEA_06_07(1) -0,84 -0,41 -0,90 0,02 9,68 |Pv: 4,91 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,31 0,90 0,02 7,37 |Pv: 2,85 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,97 24,05 -0,58 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,31 -0,90 0,02 7,37 |Pv: 2,85 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 0,11 0,90 0,01 2,73 |Pv: 0,39 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,96 24,00 -0,60 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 -0,11 -0,90 0,01 2,73 |Pv: 0,39 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,16 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,96 23,99 -0,61 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,16 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,58 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,58 1,28 0,90 0,07 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,58 1,28 0,90 0,07 29,01 |Pv: 29,39 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

31
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,988 24,59 -0,11 |
|Substation(10) |
| B_11 24,90 0,963 23,97 -0,61 |
|Substation(11) |
| B_12 24,90 0,974 24,26 -0,50 |
|Substation(12) |
| B_13 24,90 0,971 24,18 -0,53 |
|Substation(13) |
| B_14 24,90 0,968 24,11 -0,56 |
|Substation(14) |
| B_15 24,90 0,964 24,00 -0,60 |
|Substation(15) |
| B_16 24,90 0,961 23,94 -0,62 |
|Substation(16) |
| B_17 24,90 0,956 23,81 -0,68 |
|Substation(17) |
| B_18 0,38 0,996 0,38 -1,62 |
|Substation(18) |
| B_19_AUX 24,90 0,977 24,32 -0,48 |
-----------------------------------------------------------------------------------------------------------------------------------

32
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,961 23,94 -0,62 |
|Substation(2) |
| B_03 24,90 0,975 24,29 -0,23 |
|Substation(20) |
| B_21_AUX 24,90 0,994 24,75 -0,31 |
|Substation(3) |
| B_04 24,90 0,969 24,13 -0,29 |
|Substation(4) |
| B_05 24,90 0,982 24,45 -0,42 |
|Substation(5) |
| B_06 24,90 0,977 24,32 -0,47 |
|Substation(6) |
| B_07 24,90 0,970 24,16 -0,54 |
|Substation(7) |
| B_08 24,90 0,966 24,05 -0,58 |
|Substation(8) |
| B_09 24,90 0,964 24,00 -0,60 |
|Substation(9) |
| B_10 24,90 0,963 23,99 -0,61 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

33
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,07 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 0,00 2,58 0,14 0,14 0,00 |
| 0,00 0,00 1,14 0,00 1,28 0,10 0,10 0,00 |
| 0,38 kV 0,07 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 0,00 2,58 0,00 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

34
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 0,00 2,58 0,00 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 0,00 2,58 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

35
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------

36
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,59 -0,11 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,55 -1,26 -0,90 0,07 29,01 |Pv: 29,39 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,53 1,25 0,90 0,07 28,84 |Pv: 29,05 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,96 23,97 -0,61 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,58 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,97 24,26 -0,50 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_05_12 -1,28 -0,63 -0,90 0,03 14,78 |Pv: 9,54 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 0,61 0,90 0,03 14,26 |Pv: 3,55 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

37
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,97 24,18 -0,53 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,23 -0,60 -0,90 0,03 14,26 |Pv: 3,55 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 0,58 0,90 0,03 13,74 |Pv: 3,30 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,97 24,11 -0,56 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 -0,58 -0,90 0,03 13,74 |Pv: 3,30 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 0,55 0,90 0,03 13,17 |Pv: 4,54 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,96 24,00 -0,60 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 -0,55 -0,90 0,03 13,17 |Pv: 4,54 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 0,53 0,90 0,03 12,59 |Pv: 2,77 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,96 23,94 -0,62 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,67 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 -0,53 -0,90 0,03 12,59 |Pv: 2,77 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

38
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,96 23,81 -0,68 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_1 /Shnt Shunt/Filter(2) | |
| Cub_3 /Lne LINEA_16_17 -0,82 -0,40 -0,90 0,02 9,67 |Pv: 4,08 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,07 0,04 0,89 0,00 58,58 |Tap: 4,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 1,00 0,38 -1,62 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,13 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,07 -0,04 -0,90 0,13 58,58 |Tap: 4,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,98 24,32 -0,48 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 0,41 0,90 0,02 9,68 |Pv: 4,91 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 -0,41 -0,90 0,02 9,68 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,96 23,94 -0,62 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,67 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,67 |Pv: 4,08 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,29 -0,23 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,50 -1,23 -0,90 0,07 28,84 |Pv: 29,05 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,50 1,23 0,90 0,07 28,84 |Pv: 14,52 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

39
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,99 24,75 -0,31 | |
| Cub_1 /Lne LINEA_04_05(1) 2,45 1,21 0,90 0,06 27,73 |Pv: 26,84 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux |Pv: cLod: L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul -2,45 -1,21 -0,90 0,06 14,97 | |
| | |
|Substation(3) | |
| B_04 24,90 0,97 24,13 -0,29 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,49 -1,22 -0,90 0,07 28,84 |Pv: 14,52 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux |Pv: cLod: L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul 2,45 1,21 0,90 0,07 14,97 | |
| | |
|Substation(4) | |
| B_05 24,90 0,98 24,45 -0,42 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,43 -1,19 -0,90 0,06 27,73 |Pv: 26,84 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,54 0,90 0,03 12,55 |Pv: 5,50 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 0,63 0,90 0,03 14,78 |Pv: 9,54 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,98 24,32 -0,47 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,53 -0,90 0,03 12,55 |Pv: 5,50 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 0,41 0,90 0,02 9,68 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

40
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,97 24,16 -0,54 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) | |
| Cub_3 /Lne LINEA_06_07(1) -0,84 -0,41 -0,90 0,02 9,68 |Pv: 4,91 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,31 0,90 0,02 7,37 |Pv: 2,85 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,97 24,05 -0,58 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,31 -0,90 0,02 7,37 |Pv: 2,85 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 0,11 0,90 0,01 2,73 |Pv: 0,39 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,96 24,00 -0,60 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 -0,11 -0,90 0,01 2,73 |Pv: 0,39 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,16 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,96 23,99 -0,61 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,16 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,58 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,58 1,28 0,90 0,07 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,58 1,28 0,90 0,07 29,01 |Pv: 29,39 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

41
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,988 24,59 -0,11 |
|Substation(10) |
| B_11 24,90 0,963 23,97 -0,61 |
|Substation(11) |
| B_12 24,90 0,974 24,26 -0,50 |
|Substation(12) |
| B_13 24,90 0,971 24,18 -0,53 |
|Substation(13) |
| B_14 24,90 0,968 24,11 -0,56 |
|Substation(14) |
| B_15 24,90 0,964 24,00 -0,60 |
|Substation(15) |
| B_16 24,90 0,961 23,94 -0,62 |
|Substation(16) |
| B_17 24,90 0,956 23,81 -0,68 |
|Substation(17) |
| B_18 0,38 0,996 0,38 -1,62 |
|Substation(18) |
| B_19_AUX 24,90 0,977 24,32 -0,48 |
-----------------------------------------------------------------------------------------------------------------------------------

42
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,961 23,94 -0,62 |
|Substation(2) |
| B_03 24,90 0,975 24,29 -0,23 |
|Substation(20) |
| B_21_AUX 24,90 0,994 24,75 -0,31 |
|Substation(3) |
| B_04 24,90 0,969 24,13 -0,29 |
|Substation(4) |
| B_05 24,90 0,982 24,45 -0,42 |
|Substation(5) |
| B_06 24,90 0,977 24,32 -0,47 |
|Substation(6) |
| B_07 24,90 0,970 24,16 -0,54 |
|Substation(7) |
| B_08 24,90 0,966 24,05 -0,58 |
|Substation(8) |
| B_09 24,90 0,964 24,00 -0,60 |
|Substation(9) |
| B_10 24,90 0,963 23,99 -0,61 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

43
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,07 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 0,00 2,58 0,14 0,14 0,00 |
| 0,00 0,00 1,14 0,00 1,28 0,10 0,10 0,00 |
| 0,38 kV 0,07 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 0,00 2,58 0,00 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

44
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 0,00 2,58 0,00 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 0,00 2,58 0,14 0,14 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,10 0,10 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

45
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - 'Grid\2-Winding Transformer.ElmTr2':
warn - '2-Winding Transformer' LV-Side: Voltage is below its lower limit ( v = 0,9800 p.u., vmin = 0,9900 p.u.)
info - -------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------

46
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,59 -0,11 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,55 -1,26 -0,90 0,07 29,06 |Pv: 29,48 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,54 1,26 0,90 0,07 28,89 |Pv: 29,14 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,94 23,33 -0,61 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,60 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,95 23,63 -0,49 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_05_12 -1,28 -0,63 -0,90 0,03 15,19 |Pv: 10,07 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 0,61 0,90 0,03 14,66 |Pv: 3,75 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

47
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,95 23,55 -0,52 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,24 -0,60 -0,90 0,03 14,66 |Pv: 3,75 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 0,58 0,90 0,03 14,12 |Pv: 3,48 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,94 23,47 -0,55 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 -0,58 -0,90 0,03 14,12 |Pv: 3,48 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 0,56 0,90 0,03 13,53 |Pv: 4,79 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,94 23,37 -0,59 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 -0,55 -0,90 0,03 13,53 |Pv: 4,79 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 0,53 0,90 0,03 12,93 |Pv: 2,92 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,94 23,30 -0,62 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,94 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 -0,53 -0,90 0,03 12,93 |Pv: 2,92 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

48
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,93 23,17 -0,67 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_1 /Shnt Shunt/Filter(2) | |
| Cub_3 /Lne LINEA_16_17 -0,83 -0,40 -0,90 0,02 9,94 |Pv: 4,31 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,08 0,04 0,89 0,00 60,23 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 0,98 0,37 -1,67 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,13 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,08 -0,04 -0,90 0,13 60,23 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,95 23,69 -0,46 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 0,41 0,90 0,02 9,94 |Pv: 5,18 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 -0,41 -0,90 0,02 9,94 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,94 23,30 -0,62 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,94 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,94 |Pv: 4,31 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,28 -0,23 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,51 -1,24 -0,90 0,07 28,89 |Pv: 29,14 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,51 1,24 0,90 0,07 28,89 |Pv: 14,57 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

49
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,97 24,13 -0,29 | |
| Cub_1 /Lne LINEA_04_05(1) 2,46 1,21 0,90 0,07 28,48 |Pv: 28,33 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux -2,46 -1,21 -0,90 0,07 28,48 |Pv: 0,07 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(3) | |
| B_04 24,90 0,97 24,13 -0,29 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,49 -1,23 -0,90 0,07 28,89 |Pv: 14,57 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux 2,46 1,21 0,90 0,07 28,48 |Pv: 0,07 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(4) | |
| B_05 24,90 0,96 23,83 -0,41 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,43 -1,19 -0,90 0,07 28,48 |Pv: 28,33 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,54 0,90 0,03 12,88 |Pv: 5,80 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 0,64 0,90 0,03 15,19 |Pv: 10,07 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,95 23,69 -0,46 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,53 -0,90 0,03 12,88 |Pv: 5,80 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 0,41 0,90 0,02 9,94 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

50
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,95 23,53 -0,53 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) | |
| Cub_3 /Lne LINEA_06_07(1) -0,84 -0,41 -0,90 0,02 9,94 |Pv: 5,18 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,31 0,90 0,02 7,57 |Pv: 3,00 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,94 23,41 -0,57 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,31 -0,90 0,02 7,57 |Pv: 3,00 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 0,11 0,90 0,01 2,81 |Pv: 0,41 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,94 23,37 -0,59 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 -0,11 -0,90 0,01 2,81 |Pv: 0,41 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,19 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,94 23,35 -0,60 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,19 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,60 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,58 1,28 0,90 0,07 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,58 1,28 0,90 0,07 29,06 |Pv: 29,48 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

51
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,988 24,59 -0,11 |
|Substation(10) |
| B_11 24,90 0,937 23,33 -0,61 |
|Substation(11) |
| B_12 24,90 0,949 23,63 -0,49 |
|Substation(12) |
| B_13 24,90 0,946 23,55 -0,52 |
|Substation(13) |
| B_14 24,90 0,943 23,47 -0,55 |
|Substation(14) |
| B_15 24,90 0,938 23,37 -0,59 |
|Substation(15) |
| B_16 24,90 0,936 23,30 -0,62 |
|Substation(16) |
| B_17 24,90 0,930 23,17 -0,67 |
|Substation(17) |
| B_18 0,38 0,980 0,37 -1,67 |
|Substation(18) |
| B_19_AUX 24,90 0,951 23,69 -0,46 |
-----------------------------------------------------------------------------------------------------------------------------------

52
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,936 23,30 -0,62 |
|Substation(2) |
| B_03 24,90 0,975 24,28 -0,23 |
|Substation(20) |
| B_21_AUX 24,90 0,969 24,13 -0,29 |
|Substation(3) |
| B_04 24,90 0,969 24,13 -0,29 |
|Substation(4) |
| B_05 24,90 0,957 23,83 -0,41 |
|Substation(5) |
| B_06 24,90 0,951 23,69 -0,46 |
|Substation(6) |
| B_07 24,90 0,945 23,53 -0,53 |
|Substation(7) |
| B_08 24,90 0,940 23,41 -0,57 |
|Substation(8) |
| B_09 24,90 0,938 23,37 -0,59 |
|Substation(9) |
| B_10 24,90 0,938 23,35 -0,60 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

53
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,08 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 0,00 2,58 0,15 0,15 0,00 |
| 0,00 0,00 1,14 0,00 1,28 0,10 0,10 0,00 |
| 0,38 kV 0,08 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 0,00 2,58 0,00 0,15 0,15 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,11 0,11 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

54
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 0,00 2,58 0,00 0,15 0,15 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,00 0,11 0,11 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 0,00 2,58 0,15 0,15 0,00 |
| 0,00 0,00 1,18 0,00 1,28 0,11 0,11 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

55
Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - 'Grid\2-Winding Transformer.ElmTr2':
warn - '2-Winding Transformer' LV-Side: Voltage is below its lower limit ( v = 0,9800 p.u., vmin = 0,9900 p.u.)
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'

56
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers

57
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,65 -0,30 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |

58
| Cub_1 /Lne LINEA _01_02 -2,54 -0,32 -0,99 0,06 26,02 |Pv: 23,64 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,52 0,31 0,99 0,06 25,86 |Pv: 23,35 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,95 23,71 -1,80 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,96 23,85 -1,17 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_05_12 -1,28 -0,63 -0,90 0,03 15,04 |Pv: 9,88 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 0,61 0,90 0,03 14,52 |Pv: 3,68 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

59
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,95 23,77 -1,20 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,24 -0,60 -0,90 0,03 14,52 |Pv: 3,68 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 0,58 0,90 0,03 13,99 |Pv: 3,42 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,95 23,70 -1,23 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 -0,58 -0,90 0,03 13,99 |Pv: 3,42 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 0,55 0,90 0,03 13,40 |Pv: 4,70 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,95 23,59 -1,27 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 -0,55 -0,90 0,03 13,40 |Pv: 4,70 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 0,53 0,90 0,03 12,81 |Pv: 2,86 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,94 23,52 -1,30 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,84 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 -0,53 -0,90 0,03 12,81 |Pv: 2,86 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

60
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,94 23,39 -1,35 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_1 /Shnt Shunt/Filter(2) | |
| Cub_3 /Lne LINEA_16_17 -0,83 -0,40 -0,90 0,02 9,84 |Pv: 4,23 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,08 0,04 0,89 0,00 59,64 |Tap: 0,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 0,93 0,35 -2,34 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,14 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,08 -0,04 -0,90 0,14 59,64 |Tap: 0,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,96 23,97 -1,35 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 -0,52 0,85 0,02 10,40 |Pv: 5,66 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 0,52 -0,85 0,02 10,40 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,94 23,52 -1,30 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,84 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,84 |Pv: 4,23 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,41 -0,61 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,50 -0,29 -0,99 0,06 25,86 |Pv: 23,35 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,50 0,29 0,99 0,06 25,86 |Pv: 11,68 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

61
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,98 24,29 -0,77 | |
| Cub_1 /Lne LINEA_04_05(1) 2,45 0,27 0,99 0,06 25,48 |Pv: 22,67 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux -2,45 -0,27 -0,99 0,06 25,48 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(3) | |
| B_04 24,90 0,98 24,29 -0,77 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,49 -0,29 -0,99 0,06 25,86 |Pv: 11,68 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux 2,45 0,27 0,99 0,06 25,48 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(4) | |
| B_05 24,90 0,97 24,05 -1,09 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,43 -0,25 -0,99 0,06 25,48 |Pv: 22,67 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 -0,40 0,94 0,03 12,20 |Pv: 5,20 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 0,63 0,90 0,03 15,04 |Pv: 9,88 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,96 23,97 -1,35 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 0,40 -0,94 0,03 12,20 |Pv: 5,20 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 -0,52 0,85 0,02 10,40 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

62
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,96 23,91 -1,72 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) 0,00 -0,93 0,00 0,02 | |
| Cub_3 /Lne LINEA_06_07(1) -0,84 0,53 -0,85 0,02 10,40 |Pv: 5,66 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,31 0,90 0,02 7,45 |Pv: 2,91 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,96 23,79 -1,77 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,31 -0,90 0,02 7,45 |Pv: 2,91 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 0,11 0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,95 23,75 -1,79 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 -0,11 -0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,95 23,73 -1,79 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,56 0,34 0,99 0,06 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,56 0,34 0,99 0,06 26,02 |Pv: 23,64 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

63
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,990 24,65 -0,30 |
|Substation(10) |
| B_11 24,90 0,952 23,71 -1,80 |
|Substation(11) |
| B_12 24,90 0,958 23,85 -1,17 |
|Substation(12) |
| B_13 24,90 0,955 23,77 -1,20 |
|Substation(13) |
| B_14 24,90 0,952 23,70 -1,23 |
|Substation(14) |
| B_15 24,90 0,947 23,59 -1,27 |
|Substation(15) |
| B_16 24,90 0,945 23,52 -1,30 |
|Substation(16) |
| B_17 24,90 0,939 23,39 -1,35 |
|Substation(17) |
| B_18 0,38 0,931 0,35 -2,34 |
|Substation(18) |
| B_19_AUX 24,90 0,963 23,97 -1,35 |
-----------------------------------------------------------------------------------------------------------------------------------

64
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,945 23,52 -1,30 |
|Substation(2) |
| B_03 24,90 0,980 24,41 -0,61 |
|Substation(20) |
| B_21_AUX 24,90 0,975 24,29 -0,77 |
|Substation(3) |
| B_04 24,90 0,975 24,29 -0,77 |
|Substation(4) |
| B_05 24,90 0,966 24,05 -1,09 |
|Substation(5) |
| B_06 24,90 0,963 23,97 -1,35 |
|Substation(6) |
| B_07 24,90 0,960 23,91 -1,72 |
|Substation(7) |
| B_08 24,90 0,955 23,79 -1,77 |
|Substation(8) |
| B_09 24,90 0,954 23,75 -1,79 |
|Substation(9) |
| B_10 24,90 0,953 23,73 -1,79 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

65
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,08 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 0,00 2,56 0,12 0,12 0,00 |
| 0,00 0,00 1,14 -0,93 0,34 0,09 0,09 0,00 |
| 0,38 kV 0,08 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 0,00 2,56 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,34 0,00 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

66
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 0,00 2,56 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,34 0,00 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 0,00 2,56 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,34 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

67
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |

68
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,65 -0,30 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,53 -0,31 -0,99 0,06 25,97 |Pv: 23,54 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,52 0,31 0,99 0,06 25,81 |Pv: 23,25 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,95 23,64 -1,55 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,96 23,89 -1,30 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_05_12 -1,28 -0,16 -0,99 0,03 13,59 |Pv: 8,06 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 0,14 0,99 0,03 13,09 |Pv: 2,99 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

69
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,96 23,83 -1,38 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) 0,00 -0,47 0,00 0,01 | |
| Cub_1 /Lne LINEA_12_13(1) -1,24 -0,14 -0,99 0,03 13,09 |Pv: 2,99 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 0,58 0,90 0,03 13,95 |Pv: 3,40 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,95 23,75 -1,41 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 -0,58 -0,90 0,03 13,95 |Pv: 3,40 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 0,55 0,90 0,03 13,37 |Pv: 4,68 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,95 23,65 -1,45 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 -0,55 -0,90 0,03 13,37 |Pv: 4,68 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 0,53 0,90 0,03 12,78 |Pv: 2,85 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,95 23,58 -1,48 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,82 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 -0,53 -0,90 0,03 12,78 |Pv: 2,85 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

70
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,94 23,45 -1,53 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_1 /Shnt Shunt/Filter(2) | |
| Cub_3 /Lne LINEA_16_17 -0,83 -0,40 -0,90 0,02 9,82 |Pv: 4,21 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,08 0,04 0,89 0,00 59,49 |Tap: 0,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 0,93 0,35 -2,51 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,14 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,08 -0,04 -0,90 0,14 59,49 |Tap: 0,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,96 23,94 -1,25 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 -0,06 1,00 0,02 8,85 |Pv: 4,10 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 0,06 -1,00 0,02 8,85 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,95 23,58 -1,48 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,82 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,82 |Pv: 4,21 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,41 -0,62 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,49 -0,29 -0,99 0,06 25,81 |Pv: 23,25 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,49 0,29 0,99 0,06 25,81 |Pv: 11,63 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

71
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,98 24,29 -0,77 | |
| Cub_1 /Lne LINEA_04_05(1) 2,45 0,27 0,99 0,06 25,43 |Pv: 22,57 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux -2,45 -0,27 -0,99 0,06 25,43 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(3) | |
| B_04 24,90 0,98 24,29 -0,77 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,48 -0,28 -0,99 0,06 25,81 |Pv: 11,63 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux 2,45 0,27 0,99 0,06 25,43 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(4) | |
| B_05 24,90 0,97 24,05 -1,09 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,42 -0,25 -0,99 0,06 25,43 |Pv: 22,57 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,07 1,00 0,03 11,47 |Pv: 4,60 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 0,17 0,99 0,03 13,59 |Pv: 8,06 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,96 23,95 -1,25 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,06 -1,00 0,03 11,47 |Pv: 4,60 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 -0,06 1,00 0,02 8,85 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

72
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,96 23,83 -1,47 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) 0,00 -0,47 0,00 0,01 | |
| Cub_3 /Lne LINEA_06_07(1) -0,84 0,06 -1,00 0,02 8,85 |Pv: 4,10 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,31 0,90 0,02 7,47 |Pv: 2,93 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,95 23,72 -1,51 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,31 -0,90 0,02 7,47 |Pv: 2,93 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 0,11 0,90 0,01 2,77 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,95 23,67 -1,53 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 -0,11 -0,90 0,01 2,77 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,95 23,65 -1,54 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,55 0,33 0,99 0,06 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,55 0,33 0,99 0,06 25,97 |Pv: 23,54 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

73
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,990 24,65 -0,30 |
|Substation(10) |
| B_11 24,90 0,949 23,64 -1,55 |
|Substation(11) |
| B_12 24,90 0,959 23,89 -1,30 |
|Substation(12) |
| B_13 24,90 0,957 23,83 -1,38 |
|Substation(13) |
| B_14 24,90 0,954 23,75 -1,41 |
|Substation(14) |
| B_15 24,90 0,950 23,65 -1,45 |
|Substation(15) |
| B_16 24,90 0,947 23,58 -1,48 |
|Substation(16) |
| B_17 24,90 0,942 23,45 -1,53 |
|Substation(17) |
| B_18 0,38 0,934 0,35 -2,51 |
|Substation(18) |
| B_19_AUX 24,90 0,962 23,94 -1,25 |
-----------------------------------------------------------------------------------------------------------------------------------

74
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,947 23,58 -1,48 |
|Substation(2) |
| B_03 24,90 0,980 24,41 -0,62 |
|Substation(20) |
| B_21_AUX 24,90 0,975 24,29 -0,77 |
|Substation(3) |
| B_04 24,90 0,975 24,29 -0,77 |
|Substation(4) |
| B_05 24,90 0,966 24,05 -1,09 |
|Substation(5) |
| B_06 24,90 0,962 23,95 -1,25 |
|Substation(6) |
| B_07 24,90 0,957 23,83 -1,47 |
|Substation(7) |
| B_08 24,90 0,952 23,72 -1,51 |
|Substation(8) |
| B_09 24,90 0,951 23,67 -1,53 |
|Substation(9) |
| B_10 24,90 0,950 23,65 -1,54 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

75
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,08 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,14 -0,93 0,33 0,08 0,08 0,00 |
| 0,38 kV 0,08 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,33 0,00 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

76
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 24/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers No | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,33 0,00 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -0,93 0,33 0,09 0,09 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

77
Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers

78
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.

79
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4

80
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------

81
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0

82
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.

83
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0

84
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Grid split into 2 isolated areas
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.

85
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Grid split into 2 isolated areas
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------

86
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Grid split into 2 isolated areas
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1

87
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------

88
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.

89
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------

90
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1

91
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.

92
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0

93
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------

94
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0

95
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------

96
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1

97
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.

98
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0

99
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3

100
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.

101
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0

102
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.

103
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------

104
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1

105
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.

106
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0

107
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------

108
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2

109
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Control conditions for all controllers of interest are fulfilled.
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.

110
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------

111
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------

112
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------

113
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,67 -0,35 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,53 -0,11 -1,00 0,06 25,76 |Pv: 23,16 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,51 0,10 1,00 0,06 25,60 |Pv: 22,88 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,95 23,69 -1,71 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,96 23,97 -1,57 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) | |
| Cub_1 /Lne LINEA_05_12 -1,28 0,29 -0,98 0,03 13,75 |Pv: 8,25 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 -0,31 0,97 0,03 13,35 |Pv: 3,11 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

114
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,96 23,93 -1,70 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,23 0,31 -0,97 0,03 13,35 |Pv: 3,11 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 -0,33 0,96 0,03 12,95 |Pv: 2,93 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,96 23,88 -1,83 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 0,33 -0,96 0,03 12,95 |Pv: 2,93 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 -0,36 0,95 0,03 12,52 |Pv: 4,10 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,96 23,82 -2,02 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 0,36 -0,95 0,03 12,52 |Pv: 4,10 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 -0,39 0,94 0,03 12,10 |Pv: 2,56 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,96 23,78 -2,15 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Shnt Shunt/Filter(2) -0,00 -0,91 -0,00 0,02 | |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,73 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 0,39 -0,94 0,03 12,10 |Pv: 2,56 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

115
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,95 23,66 -2,20 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_3 /Lne LINEA_16_17 -0,83 -0,40 -0,90 0,02 9,73 |Pv: 4,14 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,08 0,04 0,89 0,00 58,97 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 1,00 0,38 -3,16 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,13 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,08 -0,04 -0,90 0,13 58,97 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,96 23,98 -1,34 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 0,18 0,98 0,02 9,02 |Pv: 4,26 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 -0,18 -0,98 0,02 9,02 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,96 23,78 -2,15 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,73 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,73 |Pv: 4,14 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,44 -0,70 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,49 -0,08 -1,00 0,06 25,60 |Pv: 22,88 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,49 0,08 1,00 0,06 25,60 |Pv: 11,44 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

116
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,98 24,32 -0,88 | |
| Cub_1 /Lne LINEA_04_05(1) 2,44 0,06 1,00 0,06 25,24 |Pv: 22,24 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux -2,44 -0,06 -1,00 0,06 25,24 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(3) | |
| B_04 24,90 0,98 24,32 -0,88 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,48 -0,08 -1,00 0,06 25,60 |Pv: 11,44 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux 2,44 0,06 1,00 0,06 25,24 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(4) | |
| B_05 24,90 0,97 24,10 -1,24 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,42 -0,04 -1,00 0,06 25,24 |Pv: 22,24 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,31 0,96 0,03 11,87 |Pv: 4,92 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 -0,28 0,98 0,03 13,75 |Pv: 8,25 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,96 23,98 -1,34 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,30 -0,96 0,03 11,87 |Pv: 4,92 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 0,18 0,98 0,02 9,02 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

117
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,96 23,84 -1,48 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_3 /Lne LINEA_06_07(1) -0,84 -0,18 -0,98 0,02 9,02 |Pv: 4,26 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,08 0,99 0,02 6,77 |Pv: 2,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,95 23,75 -1,60 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,08 -0,99 0,02 6,77 |Pv: 2,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 -0,11 0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,95 23,73 -1,70 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) 0,00 -0,23 0,00 0,01 | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 0,11 -0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,95 23,71 -1,71 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,55 0,12 1,00 0,06 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,55 0,12 1,00 0,06 25,76 |Pv: 23,16 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

118
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,991 24,67 -0,35 |
|Substation(10) |
| B_11 24,90 0,951 23,69 -1,71 |
|Substation(11) |
| B_12 24,90 0,963 23,97 -1,57 |
|Substation(12) |
| B_13 24,90 0,961 23,93 -1,70 |
|Substation(13) |
| B_14 24,90 0,959 23,88 -1,83 |
|Substation(14) |
| B_15 24,90 0,957 23,82 -2,02 |
|Substation(15) |
| B_16 24,90 0,955 23,78 -2,15 |
|Substation(16) |
| B_17 24,90 0,950 23,66 -2,20 |
|Substation(17) |
| B_18 0,38 1,001 0,38 -3,16 |
|Substation(18) |
| B_19_AUX 24,90 0,963 23,98 -1,34 |
-----------------------------------------------------------------------------------------------------------------------------------

119
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,955 23,78 -2,15 |
|Substation(2) |
| B_03 24,90 0,981 24,44 -0,70 |
|Substation(20) |
| B_21_AUX 24,90 0,977 24,32 -0,88 |
|Substation(3) |
| B_04 24,90 0,977 24,32 -0,88 |
|Substation(4) |
| B_05 24,90 0,968 24,10 -1,24 |
|Substation(5) |
| B_06 24,90 0,963 23,98 -1,34 |
|Substation(6) |
| B_07 24,90 0,958 23,84 -1,48 |
|Substation(7) |
| B_08 24,90 0,954 23,75 -1,60 |
|Substation(8) |
| B_09 24,90 0,953 23,73 -1,70 |
|Substation(9) |
| B_10 24,90 0,952 23,71 -1,71 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

120
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,08 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 -0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,14 -1,14 0,12 0,08 0,08 0,00 |
| 0,38 kV 0,08 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 -0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,00 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

121
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 -0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,00 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 -0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

122
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA_12_13(1)
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... ork Data\Grid\Substation(11)\B_12 Absolute 0,02 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA_12_13(1) Relative 1,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA_12_13(1) 0,00 0,00 1,10 52,92 1,23 -35,64 1,80 1,23 52,92 1,23 1,23 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_12 /Substati 24,90 0,02 -0,23 |
| LINEA_05_12 Substation 52,92 1,23 144,36 |
| LINEA_12_13(1) Substation 52,92 1,23 -35,64 |
|and: |
|B_13 /Substati 24,90 0,00 0,00 |
| LINEA_12_13(1) Substation 0,00 0,00 0,00 |
| LINEA_13_14 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

123
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA_12_13(1)
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... ork Data\Grid\Substation(11)\B_12 Absolute 0,02 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA_12_13(1) Relative 1,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA_12_13(1) 0,00 0,00 1,10 52,92 1,23 -35,64 1,80 1,23 52,92 1,23 1,23 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_12 /Substati 24,90 0,02 -0,23 |
| LINEA_05_12 Substation 52,92 1,23 144,36 |
| LINEA_12_13(1) Substation 52,92 1,23 -35,64 |
|and: |
|B_13 /Substati 24,90 0,00 0,00 |
| LINEA_12_13(1) Substation 0,00 0,00 0,00 |
| LINEA_13_14 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

124
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA_12_13(1)
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... ork Data\Grid\Substation(11)\B_12 Absolute 0,02 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA_12_13(1) Relative 1,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA_12_13(1) 0,00 0,00 1,10 52,92 1,23 -35,64 1,80 1,23 52,92 1,23 1,23 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_12 /Substati 24,90 0,02 -0,23 |
| LINEA_05_12 Substation 52,92 1,23 144,36 |
| LINEA_12_13(1) Substation 52,92 1,23 -35,64 |
|and: |
|B_13 /Substati 24,90 0,00 0,00 |
| LINEA_12_13(1) Substation 0,00 0,00 0,00 |
| LINEA_13_14 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

125
Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------

126
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Terminal Substation(10)\B_11
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations with Feeders |
| Short-Circuit Calculation / Method : VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(10) |
| B_11 24,90 0,00 0,00 1,10 19,40 MVA 0,45 kA -35,49 0,66 kA 0,45 19,40 0,45 0,45 |
| LINEA_10_11 Substation 19,40 MVA 0,45 kA 144,51 0,66 kA |
-----------------------------------------------------------------------------------------------------------------------------------

127
Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,00 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 50,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 488,74 11,33 -37,52 16,66 11,33 488,74 11,33 11,35 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,29 -2,11 |
| LINEA _01_02 Substation 488,74 11,33 -37,52 |
| External Grid 488,74 11,33 -37,52 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

128
Short-circuit calculation started...
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,00 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 50,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 488,74 11,33 -37,52 16,66 11,33 488,74 11,33 11,35 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,29 -2,11 |
| LINEA _01_02 Substation 488,74 11,33 -37,52 |
| External Grid 488,74 11,33 -37,52 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

129
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Undo to 25/01/2024 1:00:41
info - Undo to 25/01/2024 1:00:46
info - Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,00 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 50,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 488,74 11,33 -37,52 16,66 11,33 488,74 11,33 11,35 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,29 -2,11 |
| LINEA _01_02 Substation 488,74 11,33 -37,52 |
| External Grid 488,74 11,33 -37,52 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

130
Short-circuit calculation started...
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 3,60 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 90,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 275,59 6,39 -36,60 9,37 6,39 275,59 6,39 6,40 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,52 -1,19 |
| LINEA _01_02 Substation 275,59 6,39 -36,60 |
| External Grid 275,59 6,39 -36,60 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

131
Short-circuit calculation started...
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,40 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 60,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 409,56 9,50 -37,18 13,95 9,50 409,56 9,50 9,51 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,38 -1,77 |
| LINEA _01_02 Substation 409,56 9,50 -37,18 |
| External Grid 409,56 9,50 -37,18 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

132
Short-circuit calculation started...
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,20 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 55,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 445,67 10,33 -37,33 15,19 10,33 445,67 10,33 10,35 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,34 -1,92 |
| LINEA _01_02 Substation 445,67 10,33 -37,33 |
| External Grid 445,67 10,33 -37,33 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

133
Short-circuit calculation started...
info - Short-circuit calculated at Line LINEA _01_02
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... Network Data\Grid\Substation\B_01 Absolute 2,32 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA _01_02 Relative 58,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA _01_02 0,00 0,00 1,10 423,28 9,81 -37,24 14,42 9,81 423,28 9,81 9,83 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_01 /Substati 24,90 15,37 -1,83 |
| LINEA _01_02 Substation 423,28 9,81 -37,24 |
| External Grid 423,28 9,81 -37,24 |
|and: |
|B_02 /Substati 24,90 0,00 0,00 |
| LINEA _01_02 Substation 0,00 0,00 0,00 |
| LINEA_02_03 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

134
Short-circuit calculation started...
info - Short-circuit calculated at Terminal Substation(17)\B_18
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations with Feeders |
| Short-Circuit Calculation / Method : VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(17) |
| B_18 0,38 0,00 0,00 1,05 4,80 MVA 7,29 kA -82,31 17,25 kA 7,29 4,80 7,29 7,38 |
| 2-Winding Trans Substation 4,80 MVA 7,29 kA 97,69 17,25 kA |
-----------------------------------------------------------------------------------------------------------------------------------

135
Short-circuit calculation started...
info - Short-circuit calculated at Terminal Substation(4)\B_05
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Locations with Feeders |
| Short-Circuit Calculation / Method : VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Standard defined table |
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(4) |
| B_05 24,90 0,00 0,00 1,10 71,80 MVA 1,66 kA -35,72 2,44 kA 1,66 71,80 1,66 1,67 |
| LINEA_04_05(1) Substation 71,80 MVA 1,66 kA 144,28 2,44 kA |
| LINEA_05_06(1) Substation 0,00 MVA 0,00 kA 0,00 0,00 kA |
| LINEA_05_12 Substation 0,00 MVA 0,00 kA 0,00 0,00 kA |
-----------------------------------------------------------------------------------------------------------------------------------

136
Short-circuit calculation started...
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Short-circuit calculated at Line LINEA_09_10
info - Short-circuit calculation successfully executed!
-----------------------------------------------------------------------------------------------------------------------------------
| Short-Circuit Calculation VDE 0102 Part 0 / DIN EN 60909-0 3-Phase Short-Circuit / Max. Short-Circuit Currents |
-----------------------------------------------------------------------------------------------------------------------------------
| Asynchronous Motors | Grid Identification | Short-Circuit Duration |
| Always Considered | Automatic | Break Time 0,10 s |
| | | Fault Clearing Time (Ith) 1,00 s |
| Decaying Aperiodic Component (idc) | Conductor Temperature | Voltage factor c |
| Using Method B | User Defined No | Voltage factor c Standard
| | | |
-----------------------------------------------------------------------------------------------------------------------------------
| Fault Distance from Terminal i: ... work Data\Grid\Substation(8)\B_09 Absolute 3,00 km |
| Line: \PC\Project(1)\Network Model\Network Data\Grid\LINEA_09_10 Relative 50,00 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid | System Stage: Grid |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V. Voltage c- Sk" Ik" ip Ib Sb Ik Ith |
| [kV] [kV] [deg] Factor [MVA] [kA] [deg] [kA] [kA] [MVA] [kA] [kA] |
-----------------------------------------------------------------------------------------------------------------------------------
|Fault Location: |
| LINEA_09_10 0,00 0,00 1,10 25,86 0,60 -35,52 0,88 0,60 25,86 0,60 0,60 |
-----------------------------------------------------------------------------------------------------------------------------------
|between: |
|B_09 /Substati 24,90 1,21 -0,11 |
| LINEA_08_09(2) Substation 25,86 0,60 144,48 |
| LINEA_09_10 Substation 25,86 0,60 -35,52 |
| Shunt/Filter(4) 0,00 0,00 0,00 |
|and: |
|B_10 /Substati 24,90 0,00 0,00 |
| LINEA_09_10 Substation 0,00 0,00 0,00 |
| LINEA_10_11 Substation 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

137
Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 4
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------

138
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 1 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) | |
| B_02 24,90 0,99 24,67 -0,35 | |
| Cub_1 /Lod CARGA_02 0,01 0,01 0,90 0,00 |Pl0: 0,01 MW Ql0: 0,01 Mvar |
| Cub_1 /Lne LINEA _01_02 -2,53 -0,11 -1,00 0,06 25,76 |Pv: 23,16 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_02_03 2,51 0,10 1,00 0,06 25,60 |Pv: 22,88 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
|Substation(10) | |
| B_11 24,90 0,95 23,69 -1,71 | |
| Cub_1 /Lod CARGA_11 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_10_11 -0,05 -0,02 -0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation(11) | |
| B_12 24,90 0,96 23,97 -1,57 | |
| Cub_1 /Lod CARGA_12 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(1) | |
| Cub_1 /Lne LINEA_05_12 -1,28 0,29 -0,98 0,03 13,75 |Pv: 8,25 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Lne LINEA_12_13(1) 1,24 -0,31 0,97 0,03 13,35 |Pv: 3,11 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

139
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 2 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(12) | |
| B_13 24,90 0,96 23,93 -1,70 | |
| Cub_1 /Lod CARGA_13 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Shnt Shunt/Filter(3) | |
| Cub_1 /Lne LINEA_12_13(1) -1,23 0,31 -0,97 0,03 13,35 |Pv: 3,11 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_13_14 1,19 -0,33 0,96 0,03 12,95 |Pv: 2,93 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(13) | |
| B_14 24,90 0,96 23,88 -1,83 | |
| Cub_1 /Lod CARGA_14 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_13_14 -1,19 0,33 -0,96 0,03 12,95 |Pv: 2,93 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_14_15 1,14 -0,36 0,95 0,03 12,52 |Pv: 4,10 kW cLod: 0,00 Mvar L: 3,00 km|
| | |
|Substation(14) | |
| B_15 24,90 0,96 23,82 -2,02 | |
| Cub_1 /Lod CARGA_15 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_14_15 -1,13 0,36 -0,95 0,03 12,52 |Pv: 4,10 kW cLod: 0,00 Mvar L: 3,00 km|
| Cub_2 /Lne LINEA_15_16 1,08 -0,39 0,94 0,03 12,10 |Pv: 2,56 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
|Substation(15) | |
| B_16 24,90 0,96 23,78 -2,15 | |
| Cub_1 /Lod CARGA_16 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_2 /Shnt Shunt/Filter(2) -0,00 -0,91 -0,00 0,02 | |
| Cub_2 /Lne LINEA_08_09(1) 0,83 0,40 0,90 0,02 9,73 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_15_16 -1,08 0,39 -0,94 0,03 12,10 |Pv: 2,56 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

140
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 3 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(16) | |
| B_17 24,90 0,95 23,66 -2,20 | |
| Cub_1 /Lod CARGA_17 0,75 0,36 0,90 0,02 |Pl0: 0,75 MW Ql0: 0,36 Mvar |
| Cub_3 /Lne LINEA_16_17 -0,83 -0,40 -0,90 0,02 9,73 |Pv: 4,14 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_2 /Tr2 2-Winding Transfor 0,08 0,04 0,89 0,00 58,97 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(17) | |
| B_18 0,38 1,00 0,38 -3,16 | |
| Cub_1 /Lod CARGA_18 0,08 0,04 0,90 0,13 |Pl0: 0,08 MW Ql0: 0,04 Mvar |
| Cub_1 /Tr2 2-Winding Transfor -0,08 -0,04 -0,90 0,13 58,97 |Tap: 5,00 Min: -5 Max: 5 |
| | |
|Substation(18) | |
| B_19_AUX24,90 0,96 23,98 -1,34 | |
| Cub_1 /Lne LINEA_06_07(1) 0,84 0,18 0,98 0,02 9,02 |Pv: 4,26 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_1 /Lne LINEA_12_13 -0,84 -0,18 -0,98 0,02 9,02 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
|Substation(19) | |
| B_20_AUX24,90 0,96 23,78 -2,15 | |
| Cub_2 /Lne LINEA_08_09(1) -0,83 -0,40 -0,90 0,02 9,73 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Lne LINEA_16_17 0,83 0,40 0,90 0,02 9,73 |Pv: 4,14 kW cLod: 0,00 Mvar L: 5,00 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(2) | |
| B_03 24,90 0,98 24,44 -0,70 | |
| Cub_1 /Shnt Shunt/Filter | |
| Cub_1 /Lne LINEA_02_03 -2,49 -0,08 -1,00 0,06 25,60 |Pv: 22,88 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_03_04(1) 2,49 0,08 1,00 0,06 25,60 |Pv: 11,44 kW cLod: 0,00 Mvar L: 2,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

141
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 4 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(20) | |
| B_21_AUX24,90 0,98 24,32 -0,88 | |
| Cub_1 /Lne LINEA_04_05(1) 2,44 0,06 1,00 0,06 25,24 |Pv: 22,24 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_04_05aux -2,44 -0,06 -1,00 0,06 25,24 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(3) | |
| B_04 24,90 0,98 24,32 -0,88 | |
| Cub_1 /Lod CARGA_04 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_03_04(1) -2,48 -0,08 -1,00 0,06 25,60 |Pv: 11,44 kW cLod: 0,00 Mvar L: 2,00 km|
| Cub_2 /Lne LINEA_04_05aux 2,44 0,06 1,00 0,06 25,24 |Pv: 0,06 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| | |
|Substation(4) | |
| B_05 24,90 0,97 24,10 -1,24 | |
| Cub_2 /Lod CARGA_05 0,04 0,02 0,90 0,00 |Pl0: 0,04 MW Ql0: 0,02 Mvar |
| Cub_3 /Lne LINEA_04_05(1) -2,42 -0,04 -1,00 0,06 25,24 |Pv: 22,24 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_05_06(1) 1,10 0,31 0,96 0,03 11,87 |Pv: 4,92 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_1 /Lne LINEA_05_12 1,29 -0,28 0,98 0,03 13,75 |Pv: 8,25 kW cLod: 0,00 Mvar L: 5,00 km|
| | |
|Substation(5) | |
| B_06 24,90 0,96 23,98 -1,34 | |
| Cub_1 /Lod CARGA_06 0,25 0,12 0,90 0,01 |Pl0: 0,25 MW Ql0: 0,12 Mvar |
| Cub_1 /Lne LINEA_05_06(1) -1,09 -0,30 -0,96 0,03 11,87 |Pv: 4,92 kW cLod: 0,00 Mvar L: 4,00 km|
| Cub_2 /Lne LINEA_12_13 0,84 0,18 0,98 0,02 9,02 |Pv: 0,01 kW cLod: 0,00 Mvar L: 0,01 km|
| Cub_1 /Voltreg Step-Voltage Regul | |
| Cub_2 /Voltreg Step-Voltage Regul | |
| | |
-----------------------------------------------------------------------------------------------------------------------------------

142
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 5 |
-----------------------------------------------------------------------------------------------------------------------------------
| rated Active Reactive Power | |
| Voltage Bus-voltage Power Power Factor Current Loading| Additional Data |
| [kV] [p.u.] [kV] [deg] [MW] [Mvar] [-] [kA] [%] | |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(6) | |
| B_07 24,90 0,96 23,84 -1,48 | |
| Cub_1 /Lod CARGA_07 0,20 0,10 0,90 0,01 |Pl0: 0,20 MW Ql0: 0,10 Mvar |
| Cub_3 /Lne LINEA_06_07(1) -0,84 -0,18 -0,98 0,02 9,02 |Pv: 4,26 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_07_08(1) 0,64 0,08 0,99 0,02 6,77 |Pv: 2,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(7) | |
| B_08 24,90 0,95 23,75 -1,60 | |
| Cub_1 /Lod CARGA_08 0,40 0,19 0,90 0,01 |Pl0: 0,40 MW Ql0: 0,19 Mvar |
| Cub_1 /Lne LINEA_07_08(1) -0,64 -0,08 -0,99 0,02 6,77 |Pv: 2,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_08_09(2) 0,24 -0,11 0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(8) | |
| B_09 24,90 0,95 23,73 -1,70 | |
| Cub_1 /Lod CARGA_09 0,14 0,07 0,90 0,00 |Pl0: 0,14 MW Ql0: 0,07 Mvar |
| Cub_1 /Shnt Shunt/Filter(4) 0,00 -0,23 0,00 0,01 | |
| Cub_1 /Lne LINEA_08_09(2) -0,24 0,11 -0,90 0,01 2,76 |Pv: 0,40 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_09_10 0,10 0,05 0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| | |
|Substation(9) | |
| B_10 24,90 0,95 23,71 -1,71 | |
| Cub_1 /Lod CARGA_10 0,05 0,02 0,90 0,00 |Pl0: 0,05 MW Ql0: 0,02 Mvar |
| Cub_1 /Lne LINEA_09_10 -0,10 -0,05 -0,90 0,00 1,18 |Pv: 0,07 kW cLod: 0,00 Mvar L: 6,00 km|
| Cub_2 /Lne LINEA_10_11 0,05 0,02 0,90 0,00 0,59 |Pv: 0,03 kW cLod: 0,00 Mvar L: 10,00 km|
| | |
|Substation | |
| B_01 24,90 1,00 24,90 0,00 | |
| Cub_2 /Xnet External Grid 2,55 0,12 1,00 0,06 |Sk": 10000,00 MVA |
| Cub_1 /Lne LINEA _01_02 2,55 0,12 1,00 0,06 25,76 |Pv: 23,16 kW cLod: 0,00 Mvar L: 4,00 km|
| | |
-----------------------------------------------------------------------------------------------------------------------------------

143
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 6 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(1) |
| B_02 24,90 0,991 24,67 -0,35 |
|Substation(10) |
| B_11 24,90 0,951 23,69 -1,71 |
|Substation(11) |
| B_12 24,90 0,963 23,97 -1,57 |
|Substation(12) |
| B_13 24,90 0,961 23,93 -1,70 |
|Substation(13) |
| B_14 24,90 0,959 23,88 -1,83 |
|Substation(14) |
| B_15 24,90 0,957 23,82 -2,02 |
|Substation(15) |
| B_16 24,90 0,955 23,78 -2,15 |
|Substation(16) |
| B_17 24,90 0,950 23,66 -2,20 |
|Substation(17) |
| B_18 0,38 1,001 0,38 -3,16 |
|Substation(18) |
| B_19_AUX 24,90 0,963 23,98 -1,34 |
-----------------------------------------------------------------------------------------------------------------------------------

144
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 7 |
-----------------------------------------------------------------------------------------------------------------------------------
| rtd.V Bus - voltage Voltage - Deviation [%] |
| [kV] [p.u.] [kV] [deg] -10 -5 0 +5 +10 |
-----------------------------------------------------------------------------------------------------------------------------------
|Substation(19) |
| B_20_AUX 24,90 0,955 23,78 -2,15 |
|Substation(2) |
| B_03 24,90 0,981 24,44 -0,70 |
|Substation(20) |
| B_21_AUX 24,90 0,977 24,32 -0,88 |
|Substation(3) |
| B_04 24,90 0,977 24,32 -0,88 |
|Substation(4) |
| B_05 24,90 0,968 24,10 -1,24 |
|Substation(5) |
| B_06 24,90 0,963 23,98 -1,34 |
|Substation(6) |
| B_07 24,90 0,958 23,84 -1,48 |
|Substation(7) |
| B_08 24,90 0,954 23,75 -1,60 |
|Substation(8) |
| B_09 24,90 0,953 23,73 -1,70 |
|Substation(9) |
| B_10 24,90 0,952 23,71 -1,71 |
|Substation |
| B_01 24,90 1,000 24,90 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

145
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Grid: Grid System Stage: Grid | Study Case: Study Case | Annex: / 8 |
-----------------------------------------------------------------------------------------------------------------------------------
| Volt. Generation Motor Load Compen- External Power Total Load No load |
| Level Load sation Infeed Interchange Interchange Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ to [MW]/ [MW]/ [MW]/ [MW]/ |
| [kV] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| 0,38 0,00 0,00 0,08 0,00 0,00 0,00 0,00 0,00 |
| 0,00 0,00 0,04 0,00 0,00 0,00 0,00 0,00 |
| 24,90 kV -0,08 0,00 0,00 0,00 |
| -0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| 24,90 0,00 0,00 2,36 -0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,14 -1,14 0,12 0,08 0,08 0,00 |
| 0,38 kV 0,08 0,00 0,00 0,00 |
| 0,04 0,00 0,00 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: 0,00 0,00 2,44 -0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,00 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

146
-----------------------------------------------------------------------------------------------------------------------------------
| | | DIgSILENT | Project: |
| | | PowerFactory |-------------------------------
| | | 2021 SP2 | Date: 25/01/2024 |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Load Flow Calculation Complete System Report: Substations, Voltage Profiles, Grid Interchange |
-----------------------------------------------------------------------------------------------------------------------------------
| AC Load Flow, balanced, positive sequence | Automatic Model Adaptation for Convergence No |
| Automatic tap adjustment of transformers Yes | Max. Acceptable Load Flow Error |
| Consider reactive power limits No | Bus Equations(HV) 1,00 kVA |
| | Model Equations 0,10 % |
-----------------------------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------------------------
| Total System Summary | Study Case: Study Case | Annex: / 9 |
-----------------------------------------------------------------------------------------------------------------------------------
| Generation Motor Load Compen- External Inter Area Total Load No load |
| Load sation Infeed Flow Losses Losses Losses |
| [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ [MW]/ |
| [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] [Mvar] |
-----------------------------------------------------------------------------------------------------------------------------------
| \PC\Project(1)\Network Model\Network Data\Grid |
| 0,00 0,00 2,44 -0,00 2,55 0,00 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,00 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------
| Total: |
| 0,00 0,00 2,44 -0,00 2,55 0,12 0,12 0,00 |
| 0,00 0,00 1,18 -1,14 0,12 0,08 0,08 0,00 |
-----------------------------------------------------------------------------------------------------------------------------------

147
A calculation relevant object was changed!
info - The calculation results have been deleted.
info - Element 'External Grid' is local reference in separated area of 'B_01'
info - Calculating load flow...
info - -------------------------------------------------------------------------------------
info - Start Newton-Raphson Algorithm...
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Load flow iteration: 3
info - Newton-Raphson converged with 3 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 1
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Load flow iteration: 2
info - Newton-Raphson converged with 2 iterations.
info - -------------------------------------------------------------------------------------
info - Unresolved control conditions detected. Further outer loop iterations required.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 2
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - -------------------------------------------------------------------------------------
info - Switching to 'Rounding Mode': Continuous controls are discretised.
info - -------------------------------------------------------------------------------------
info - Outer Loop: Iteration 3
info - Load flow iteration: 0
info - Load flow iteration: 1
info - Newton-Raphson converged with 1 iterations.
info - Load flow calculation successful.
info - -------------------------------------------------------------------------------------
info - Report of Control Condition for Relevant Controllers
info - -------------------------------------------------------------------------------------
info - 'Grid\2-Winding Transformer.ElmTr2':
warn - '2-Winding Transformer' LV-Side: Voltage is below its lower limit ( v = 0,9800 p.u., vmin = 0,9900 p.u.)
info - -------------------------------------------------------------------------------------

148

You might also like