This document contains calculations for the heating and cooling load of two areas - a lobby-tower area and a switch room-tower area - on the fourth floor of a site in Trichy.
For the lobby-tower area, the total heating load is calculated to be 57,235 BTU/hr, equivalent to 4.77 tons. The total supply air required is 2,356 CFM at an air distribution effectiveness of 52°F.
For the smaller switch room-tower area, calculations are provided but the summary is not completed, as the document ends after introducing the solar gain from glass calculation.
This document contains calculations for the heating and cooling load of two areas - a lobby-tower area and a switch room-tower area - on the fourth floor of a site in Trichy.
For the lobby-tower area, the total heating load is calculated to be 57,235 BTU/hr, equivalent to 4.77 tons. The total supply air required is 2,356 CFM at an air distribution effectiveness of 52°F.
For the smaller switch room-tower area, calculations are provided but the summary is not completed, as the document ends after introducing the solar gain from glass calculation.
This document contains calculations for the heating and cooling load of two areas - a lobby-tower area and a switch room-tower area - on the fourth floor of a site in Trichy.
For the lobby-tower area, the total heating load is calculated to be 57,235 BTU/hr, equivalent to 4.77 tons. The total supply air required is 2,356 CFM at an air distribution effectiveness of 52°F.
For the smaller switch room-tower area, calculations are provided but the summary is not completed, as the document ends after introducing the solar gain from glass calculation.