Content

1. Why NPSH Calculation


2. What is NPSH Required
3. What is NPSH Available
4. NPSH Equation
5. NPSH Calculation
6. NPSH on Aspen Hysys
7. References

WWW.JEFERSONCOSTA.COM
WHY NPSH CALCULATION

You must avoid formation and collapse


of bubbles at pump impeller.
NPSHa > NPSHr

WWW.JEFERSONCOSTA.COM
WHY NPSH CALCULATION

Centrifugal pump damage because of cavitation

WWW.JEFERSONCOSTA.COM
WHAT IS NPSH REQUIRED

The minimum total suction absolute head, at the suction


nozzle, referred to the standard datum, minus the liquid vapor
absolute pressure head, at flowing temperature, required to
avoid cavitation.
In absence of the manufacturer’s characteristics, NPSHR (in m)
for centrifugal pumps may be estimated from the following
empirical equation:

Where n is speed of rotation in rpm, Sn specific speed (rpm)


and QR (m3/hr) is the rated flow rate.

WWW.JEFERSONCOSTA.COM
WHAT IS NPSH AVAILABLE

The total suction absolute head, at the suction nozzle, referred to the
standard datum, minus the liquid vapor absolute pressure head, at
flowing temperature available for a specific application.

WWW.JEFERSONCOSTA.COM
WHAT IS NPSH AVAILABLE

Pump selection must match with pump specification

WWW.JEFERSONCOSTA.COM
NPSH EQUATION

NPSHa depends on environment and


process conditions.

WWW.JEFERSONCOSTA.COM
NPSH EQUATION

NPSHa is influenced by HMB, P&ID,


Plot Plan/Plant Layout and Isometrics.

Ludwig's Applied Process Design for Chemical and Petrochemical Plants Volume 1

WWW.JEFERSONCOSTA.COM
NPSH CALCULATION

Reservoir below pump elevation.


Vapor pressure of water at 30 C is 4.2 kPa (0.615 psia).
Density of water at 30 C is 995 kg/m3 (62.1 lb/ft3).
Which is NPSHa?

Rules of Thumb for Chemical Engineers. 5th ed.

WWW.JEFERSONCOSTA.COM
NPSH CALCULATION

Reservoir above pump elevation.


Vapor pressure of n-butane at 38 C is 356 kPa (51.6 psia).
Specific gravity of n-butane at 38 C is 0.59.
Which is NPSHa?

Rules of Thumb for Chemical Engineers. 5th ed.

WWW.JEFERSONCOSTA.COM
NPSH ON ASPEN HYSYS

NPSHa can be explicitly calculated from


the flowsheet conditions by clicking the
Calculate Head button. The NPSHa is
calculated as follows:

EXAMPLE ON
VIDEO

WWW.JEFERSONCOSTA.COM
VIDEO PRESENTATION AND EXAMPLE
RESOLUTION

CLICK HERE TO WATCH


WWW.JEFERSONCOSTA.COM
REFERENCES

 Rules of Thumb for Chemical Engineers. 5TH ed.


 Ludwig's Applied Process Design for Chemical
and Petrochemical Plants Volume 1
 Chemical Engineering Design. 5TH ed.
 GPSA Electronic Databook 12th ed

WWW.JEFERSONCOSTA.COM
SHORTCUT TO CHEMICAL PROCESS
ENGINEERING AND PLANT DESIGN

CLICK HERE TO FULL TRAINING WWW.JEFERSONCOSTA.COM

You might also like